05. Monthly Report Blasting Mei 2023.pptx

MuhammadSukardi2 29 views 29 slides Aug 28, 2024
Slide 1
Slide 1 of 29
Slide 1
1
Slide 2
2
Slide 3
3
Slide 4
4
Slide 5
5
Slide 6
6
Slide 7
7
Slide 8
8
Slide 9
9
Slide 10
10
Slide 11
11
Slide 12
12
Slide 13
13
Slide 14
14
Slide 15
15
Slide 16
16
Slide 17
17
Slide 18
18
Slide 19
19
Slide 20
20
Slide 21
21
Slide 22
22
Slide 23
23
Slide 24
24
Slide 25
25
Slide 26
26
Slide 27
27
Slide 28
28
Slide 29
29

About This Presentation

report monthly


Slide Content

Monthly Report Drilling Blasting MTD Mei 2023 Loa Kulu, 8 Juni 2023

Achievment Blasting Mei 2023

3 Blasting Plan Vs Aktual MTD Mei 2023 1. PIT 40 SST-AMM

4 Blasting Plan Vs Aktual MTD Mei 2023 2. PIT BERUAQ-AMM

5 Blasting Plan Vs Aktual MTD Mei 2023 3. PIT J North-PST

6 Blasting Plan Vs Aktual MTD Mei 2023 4. PIT 270 BLP- CK

7 Blasting Plan Vs Aktual MTD Mei 2023 5. PIT 200 GTR - MTN

8 Realisasi Waste Oil All Mining Konraktor MTD Mei 2023

- Evaluasi Sequence Blasting Mei 2023 - Dokumentasi Fragmentasi

1. PIT 40 SST - PT. AMM Target Overburden Removal 4,086,778 Bcm Target Overburden Removal by Blastin g 3,940,782 Bcm Aktual Blasting Material (Survey) 4,628,229 Bcm Achievment Plan Vs Aktual 112 % Recovery 94 % Stock Blast Inv EOM 828.118 Bcm

11 Tanggal 25 Mei 2023 Seam 90 Pit East (Layer 1) B x S = 8 X 9 PF = 0.22 Fragmentasi ≤ 80 cm : 100% Fragmentasi ≥ 80 cm : 0% Unit Loader: PC 52008 Digging Time : 10.4 s Fragmentasi Pit 40 SST-PT. AMM

2. PIT BERUAQ- PT. AMM

Fragmentasi BERUAQ- PT. AMM Tanggal 04 Mei 2023 Seam 33 Pit Badak (Layer 1) B x S = 8 X 9 PF = 0.16 Fragmentasi ≤ 40 cm : 97% Fragmentasi ≥ 40 cm : 3 % Unit Loader: PC 5507 Digging Time : 5.21 s

3. PIT J North - PT. PST Target Overburden Removal 2,168,843 Bcm Target Overburden Removal by Blastin g 1,518,190 Bcm Aktual Blasting Material (Survey) 1,716,146 Bcm Achievment Plan Vs Aktual 113 % Recovery 73 % Stock Blast Inv EOM 30.000 Bcm

Fragmentasi Pit J North - PT. PST Peledakan27 Mei 2023 Burden Spasi : 6 x 7 Seam : J Total Hole : 235 Volume : 57,311.0 BCM PF : 0.22 Fragmentasi ≥90Cm :5% Fragmentasi ≤90Cm :95% Ukuran rata-rata paling besar : 90 cm

4.a PIT 270- PT. CK Target Overburden Removal 2,677,136 Bcm Target Overburden Removal by Blastin g 4,411,200 Bcm Aktual Blasting Material (Survey) 4,483,936 Bcm Achievment Plan Vs Aktual 102 % Recovery 97 % Stock Blast Inv EOM 590,518 Bcm

4.b PIT Z12- PT. CK

Fragmentasi PIT 270 - PT. CK Hari/Tanggal : Minggu / 14 Mei 2023 Lokasi/Pit : PT CK Pit 270 BLP JumlahLubang : 113 lubang Kedalaman : 8,2 meter Berdasarkan permintaan fragmentasi batuan yang diharapkan ( ≤80cm ), maka dari hasil pengolahan data di atas ; Persentase lolos ayakan pada ukuran ( ≤80 cm ) sebanyak 100 % Tidak ditemukan adanya boulder ( ≥ 80 cm ) dengan top size 31,78 cm. Persen passing F90 sebesar 21,41 cm

5. PIT 200 GTR - MTN Target Overburden Removal 2,677,136 Bcm Target Overburden Removal by Blastin g 4,411,200 Bcm Aktual Blasting Material (Survey) 4,483,936 Bcm Achievment Plan Vs Aktual 102 % Recovery 97 % Stock Blast Inv EOM 590,518 Bcm Pit 200 GTR Divergent Area

Fragmentasi PIT 200 GTR - MTN

Evaluasi Equipment MTD Mei 2023

Performance MMT -PT Dahana (MTD Mei 2023) *Data per 31 Mei 2023

23 Performance Drilling Machine - PT AMM (MTD Mei 2023)

24 Performance Drilling Machine - PT PST (MTD Mei 2023)

25 Performance Drilling Machine - PT CK (MTD Mei 2023)

26 Performance Drilling Machine - PT MTN (MTD Mei 2023)

Issue Blasting MTD Mei 2023

28