756049918-API-RBI-580-Questions-1-300-34-86.pdf

apidyn 15 views 53 slides Sep 01, 2025
Slide 1
Slide 1 of 53
Slide 1
1
Slide 2
2
Slide 3
3
Slide 4
4
Slide 5
5
Slide 6
6
Slide 7
7
Slide 8
8
Slide 9
9
Slide 10
10
Slide 11
11
Slide 12
12
Slide 13
13
Slide 14
14
Slide 15
15
Slide 16
16
Slide 17
17
Slide 18
18
Slide 19
19
Slide 20
20
Slide 21
21
Slide 22
22
Slide 23
23
Slide 24
24
Slide 25
25
Slide 26
26
Slide 27
27
Slide 28
28
Slide 29
29
Slide 30
30
Slide 31
31
Slide 32
32
Slide 33
33
Slide 34
34
Slide 35
35
Slide 36
36
Slide 37
37
Slide 38
38
Slide 39
39
Slide 40
40
Slide 41
41
Slide 42
42
Slide 43
43
Slide 44
44
Slide 45
45
Slide 46
46
Slide 47
47
Slide 48
48
Slide 49
49
Slide 50
50
Slide 51
51
Slide 52
52
Slide 53
53

About This Presentation

api rbi 580


Slide Content

Q-02: General [1.1]
The purpose of API 580 is to provide users with the basic elements
necessary to:
A) Develop, implement and maintain an optimized Inspection program using RBI
B) Develop and maintain an RBI Program managed with risk-prioritized inspection
plans
C) developing, implementing, and maintaining a risk-based inspection (RBI)
program and developing and implementing an inspection program.
D) Develop, implement and maintain an optimized Inspection Program using risk-
based inspection Plans

Q-03: General [1.1]
API 580 provides guidance to whom for development and implementation of
inspection programs?
A) Only owners and operators of pressure containing equipment
B) Owners, operators and designers of pressure containing equipment
C) Users of API 580 who work with pressure-containing and non-pressure
containing equipment
D) Users of API 580 (Limited to RBI Team only) who work with pressure-containing
equipment

Q-03: General [1.1]
API 580 provides guidance to whom for development and implementation of
inspection programs?
A) Only owners and operators of pressure containing equipment
B) Owners, operators and designers of pressure containing equipment
C) Users of API 580 who work with pressure-containing and non-pressure
containing equipment
D) Users of API 580 (Limited to RBI Team only) who work with pressure-containing
equipment

Q-04: General [1.1]
The API 580 (RBI) approach emphasizes safe and reliable operation through:
A) Risk analysis
B) Risk assessment
C) Risk management
D) Risk-prioritized inspection

Q-04: General [1.1]
The API 580 (RBI) approach emphasizes safe and reliable operation through:
A) Risk analysis
B) Risk assessment
C) Risk management
D) Risk-prioritized inspection

Q-05: General [1.1]
The spectrum of complementary risk analysis approaches can be considered
as part of:
A) Risk management and mitigation
B) Inspection planning process
C) RBI program development
D) Risk assessment process

Q-05: General [1.1]
The spectrum of complementary risk analysis approaches can be considered
as part of:
A) Risk management and mitigation
B) Inspection planning process
C) RBI program development
D) Risk assessment process

Q-06: General [1.1]
An expected outcome from application of RBI process should be linkage of
risks with:
A) Appropriate inspection, process control or other risk mitigation activities to manage the
risks
B) Process controls or other risk mitigation activities to effectively reduce or eliminate the
risks
C) Appropriate inspection, process control or other risk mitigation activities to control the
risks
D) Process controls or other risk mitigation activities to effectively reduce or control the
risks

Q-06: General [1.1]
An expected outcome from application of RBI process should be linkage of
risks with:
A) Appropriate inspection, process control or other risk mitigation activities to
manage the risks
B) Process controls or other risk mitigation activities to effectively reduce or eliminate the
risks
C) Appropriate inspection, process control or other risk mitigation activities to control the
risks
D) Process controls or other risk mitigation activities to effectively reduce or control the
risks

Q-07: General [1.1]
The RBI process is capable of generating all of these except:
A) A detailed description of the inspection plan to be employed for each equipment
item
B) A description of other risk mitigation activities (non-inspection items such as
repairs)
C) A ranking by relative risk of all equipment evaluated and identification of risk
drivers
D) Expected risk levels of all equipment before the inspection plan has been
implemented

Q-07: General [1.1]
The RBI process is capable of generating all of these except:
A) A detailed description of the inspection plan to be employed for each equipment
item
B) A description of other risk mitigation activities (non-inspection items such as
repairs)
C) A ranking by relative risk of all equipment evaluated and identification of risk
drivers
D) Expected risk levels of all equipment before the inspection plan has been
implemented

Q-08: General [1.1]
The RBI process is capable of generating which of the following:
A) A ranking by residual risk of all equipment evaluated
B) An overview of the inspection plan by unit
C) An overview of all risk mitigation plans
D) Identification of risk drivers

Q-08: General [1.1]
The RBI process is capable of generating which of the following:
A) A ranking by residual risk of all equipment evaluated
B) An overview of the inspection plan by unit
C) An overview of all risk mitigation plans
D) Identification of risk drivers

Q-09: General [1.1]
The RBI process is expected to:
A) Calculate a risk level for every piece of pressure equipment in a plant.
B) Establish an acceptable risk level for the selected inspection, repair, or
replacement activity.
C) Determine linkage of risks with appropriate inspection or other risk mitigation
activities.
D) Present all risk management activities for reducing likelihood and consequence of
failure.

Q-09: General [1.1]
The RBI process is expected to:
A) Calculate a risk level for every piece of pressure equipment in a plant.
B) Establish an acceptable risk level for the selected inspection, repair, or
replacement activity.
C) Determine linkage of risks with appropriate inspection or other risk mitigation
activities.
D) Present all risk management activities for reducing likelihood and consequence of
failure.

Q-10: General [1.1]
The plan resulting from a detailed description of an RBI assessment for each
piece of equipment will specify:
A) Proposed mitigation plans.
B) Consequence and probability of failure.
C) Timing of inspections.
D) Risk levels before inspection.

Q-10: General [1.1]
The plan resulting from a detailed description of an RBI assessment for each
piece of equipment will specify:
A) Proposed mitigation plans.
B) Consequence and probability of failure.
C) Timing of inspections.
D) Risk levels before inspection.

Q-01: RBI Benefits and Limitations [1.2]
The primary work products of the RBI assessment and management
approach are plans that address ways to manage risks on:
A) A plant process unit level
B) An operating plant level
C) An equipment level
D) A component level

Q-01: RBI Benefits and Limitations [1.2]
The primary work products of the RBI assessment and management
approach are plans that address ways to manage risks on:
A) A plant process unit level
B) An operating plant level
C) An equipment level
D) A component level

Q-02: RBI Benefits and Limitations [1.2]
How do RBI equipment plans highlight risks?
A) Primarily from a safety perspective
B) Primarily from both safety and health perspectives
C) Primarily from safety, health and environmental perspectives
D) From a safety, health, and environment perspective and/or from an economic
standpoint

Q-02: RBI Benefits and Limitations [1.2]
How do RBI equipment plans highlight risks?
A) Primarily from a safety perspective
B) Primarily from both safety and health perspectives
C) Primarily from safety, health and environmental perspectives
D) From a safety, health, and environment perspective and/or from an
economic standpoint

Q-03: RBI Benefits and Limitations [1.2]
RBI is based on __________
A) Sound and proven risk analysis principles
B) Sound and proven risk management principles
C) Sound and proven risk analysis and risk management principles
D) Sound and proven risk assessment and risk management principles

Q-03: RBI Benefits and Limitations [1.2]
RBI is based on_______________
A) Sound and proven risk analysis principles
B) Sound and proven risk management principles
C) Sound and proven risk analysis and risk management principles
D) Sound and proven risk assessment and risk management principles

Q-04: RBI Benefits and Limitations [1.2]
RBI is based on sound and proven:
A) Risk analysis principles
B) Risk management principles
C) Risk analysis and risk management principles
D) Risk assessment and risk management principles

Q-04: RBI Benefits and Limitations [1.2]
RBI is based on sound and proven:
A) Risk analysis principles
B) Risk management principles
C) Risk analysis and risk management principles
D) Risk assessment and risk management principles

Q-05: RBI Benefits and Limitations [1.2]
RBI plans should include cost-effective actions along with:
A) An overall projected risk
B) The projected risk mitigation
C) Any residual risk after inspection
D) A detailed risk identification and analysis

Q-05: RBI Benefits and Limitations [1.2]
RBI plans should include cost-effective actions along with:
A) An overall projected risk
B) The projected risk mitigation
C) Any residual risk after inspection
D) A detailed risk identification and analysis

Q-06: RBI Benefits and Limitations [1.2]
Implementation of RBI plans provide what benefit for facilities and equipment
assessed?
A) An overall risk reduction
B) An acceptance and understanding of the current risk
C) Either an overall risk reduction or an acceptance and understanding of the current risk
D) Both an overall risk reduction and an acceptance and understanding of the current risk

Q-06: RBI Benefits and Limitations [1.2]
Implementation of RBI plans provide what benefit for facilities and equipment
assessed?
A) An overall risk reduction
B) An acceptance and understanding of the current risk
C) Either overall risk reduction or an acceptance and understanding of the current
risk
D) Both an overall risk reduction and an acceptance and understanding of the current risk

Q-07: RBI Benefits and Limitations [1.2]
In some cases, in addition to risk reductions and process safety improvements,
RBI plans may result in:
A) Cost reductions
B) Elimination of all inspections
C) Elimination of all RBI analysis
D) Elimination of all inspections and RBI analysis

Q-07: RBI Benefits and Limitations [1.2]
In some cases, in addition to risk reductions and process safety improvements,
RBI plans may result in:
A) Cost reductions
B) Elimination of all inspections
C) Elimination of all RBI analysis
D) Elimination of all inspections and RBI analysis

Q-01: Using RBI as a Continuous Improvement Tool [1.3]
Using RBI provides a vehicle for continuously improving inspection of facilities
and:
A) Systematically managing the risk associated with plant operations and hazards
B) Systematically reducing the risk associated with plant operations and hazards
C) Systematically reducing the risk associated with pressure boundary failures
D) Systematically managing risk associated with pressure boundary failures

Q-01: Using RBI as a Continuous Improvement Tool [1.3]
Using RBI provides a vehicle for continuously improving inspection of facilities
and:
A) Systematically managing the risk associated with plant operations and hazards
B) Systematically reducing the risk associated with plant operations and hazards
C) Systematically reducing the risk associated with pressure boundary failures
D) Systematically managing risk associated with pressure boundary failures

Q-02: Using RBI as a Continuous Improvement Tool [1.3]
When RBI is used as a continuous improvement tool, it offers an added
advantage of:
A) Identifying gaps in the effectiveness of available inspection technologies and
applications
B) Identifying cases where technology can cost-effectively mitigate risks
C) Identifying cases where technology can adequately mitigate risks
D) Identifying cases where inspection technology is adequate

Q-02: Using RBI as a Continuous Improvement Tool [1.3]
When RBI is used as a continuous improvement tool, it offers an added
advantage of:
A) Identifying gaps in the effectiveness of available inspection technologies and
applications
B) Identifying cases where technology can cost-effectively mitigate risks
C) Identifying cases where technology can adequately mitigate risks
D) Identifying cases where inspection technology is adequate

Q-03: Using RBI as a Continuous Improvement Tool [1.3]
As new data becomes available or when changes occur in operating conditions,
what should be done in RBI?
A) Adjustment of the inspection levels and intervals in the RBI program
B) Adjustment of the inspection intervals in the RBI program
C) Adjustment of the inspection levels in the RBI program
D) Reassessment of the RBI program

Q-03: Using RBI as a Continuous Improvement Tool [1.3]
As new data becomes available or when changes occur in operating conditions,
what should be done in RBI?
A) Adjustment of the inspection levels and intervals in the RBI program
B) Adjustment of the inspection intervals in the RBI program
C) Adjustment of the inspection levels in the RBI program
D) Reassessment of the RBI program

Q-04: Using RBI as a Continuous Improvement Tool [1.3]
As new data (such as inspection results and industry experiences with similar
processes) becomes available or when changes occur (e.g. operating
conditions), what should be done that will provide a refreshed view of the risks?
A) Adjustment of the inspection levels and intervals in the RBI program
B) Adjustment of the inspection intervals in the RBI program
C) Adjustment of the inspection levels in the RBI program
D) Reassessment of the RBI program

Q-04: Using RBI as a Continuous Improvement Tool [1.3]
As new data (such as inspection results and industry experiences with similar
processes) becomes available or when changes occur (e.g. operating
conditions), what should be done that will provide a refreshed view of the risks?
A) Adjustment of the inspection levels and intervals in the RBI program
B) Adjustment of the inspection intervals in the RBI program
C) Adjustment of the inspection levels in the RBI program
D) Reassessment of the RBI program

Q-01: RBI as an Integrated Management Tool [1.4]
Integration of other risk management efforts (PHA, IOWs, RCM) with RBI is the
key to the success of:
A) Risk-based Inspection Programs
B) Risk Management Programs
C) Risk Mitigations
D) Risk Analysis

Q-01: RBI as an Integrated Management Tool [1.4]
Integration of other risk management efforts (PHA, IOWs, RCM) with RBI is the
key to the success of:
A) Risk-based Inspection Programs
B) Risk Management Programs
C) Risk Mitigations
D) Risk Analysis

Q-02: RBI as an Integrated Management Tool [1.4]
RBI produces inspection and maintenance plans for equipment that identify the
actions that should be taken to provide:
A) Cost-effective mitigation
B) Environmental protection
C) Reliable and safe operation
D) Process Safety Management

Q-02: RBI as an Integrated Management Tool [1.4]
RBI produces inspection and maintenance plans for equipment that identify the
actions that should be taken to provide:
A) Cost-effective mitigation
B) Environmental protection
C) Reliable and safe operation
D) Process Safety Management

Q-01: Industry Scope [2.1]
API 580 specifically targets the application of RBI in what industry (ies)?
A) Oil & Gas Industry
B) Hydrocarbon Industry
C) Hydrocarbon and Chemical Process Industry
D) Any industry using toxic substances that chooses to follow API 580 guidelines

Q-01: Industry Scope [2.1]
API 580 specifically targets the application of RBI in what industry (ies)?
A) Oil & Gas Industry
B) Hydrocarbon Industry
C) Hydrocarbon and Chemical Process Industry
D) Any industry using toxic substances that chooses to follow API 580 guidelines

Q-01: Flexibility in Application [2.2]
The Scope of API 580 is intended to promote:
A) consistency and quality in the identification, assessment, and management of risks.
B) Cost-effective solutions to reduce risk using inspection
C) Understanding of RBI and management of risk
D) None of these are correct

Q-01: Flexibility in Application [2.2]
The Scope of API 580 is intended to promote:
A) consistency and quality in the identification, assessment, and management
of risks.
B) Cost-effective solutions to reduce risk using inspection
C) Understanding of RBI and management of risk
D) None of these are correct

Q-02: Flexibility in Application [2.2]
The RBI program is intended to promote consistency and quality in the:
A) Types of inspection and repair activities selected to reduce risk.
B) Identification, assessment, and management of risks pertaining to material
deterioration.
C) Identification of high-risk process units in the refining and chemical
industries.
D) The team selected to prepare the RBI plans.

Q-02: Flexibility in Application [2.2]
The RBI program is intended to promote consistency and quality in the:
A) Types of inspection and repair activities selected to reduce risk.
B) Identification, assessment, and management of risks pertaining to material
deterioration.
C) Identification of high-risk process units in the refining and chemical
industries.
D) The team selected to prepare the RBI plans.

Q-01: Mechanical Integrity Focused [2.3]
The RBI process is focused on focuses on:
A) PHA or hazard and operability assessment (HAZOP)
B) Reliability Centered Maintenance (RCM)
C) Process Safety Management
D) maintaining the mechanical integrity of pressure equipment items

Q-01: Mechanical Integrity Focused [2.3]
The RBI process is focused on focuses on:
A) PHA or hazard and operability assessment (HAZOP)
B) Reliability Centered Maintenance (RCM)
C) Process Safety Management
D) maintaining the mechanical integrity of pressure equipment items

Q-02: Mechanical Integrity Focused [2.3]
The RBI process is focused on maintaining the mechanical integrity of
pressure equipment items and:
A) Minimizing the risk of equipment damage and personnel injury
B) Eliminating the risk of equipment damage and personnel injury
C) Minimizing the risk of loss of containment due to deterioration
D) Minimizing the risk of damage to the unit and the environment

Q-02: Mechanical Integrity Focused [2.3]
The RBI process is focused on maintaining the mechanical integrity of
pressure equipment items and:
A) Minimizing the risk of equipment damage and personnel injury
B) Eliminating the risk of equipment damage and personnel injury
C) Minimizing the risk of loss of containment due to deterioration
D) Minimizing the risk of damage to the unit and the environment