MATERIALS TRADITIONAL CEMENT FINE AGGREGATE COARSE AGGREGATE STEEL WOOD BRICK ADVANCED GEO POLYMER M SAND (RUBBER),EXPANDED POLYSTYRENE,GLASS GLASS FIBRE UPVC ACC BLOCK,INTERLOCKING BLOCKS,FLY ASH BRICKS
MAN POWER TRADITIONAL Human No uniform quality achieved Ensure safety provisions for labours ADVANCED Construction robots Achieve uniform quality and maximum productivity No need
DIGITAL SURVEY TOOLS Digital distance meter(laser distance meter) GPS & GIS (land survey technology) Total station (land survey instrument)
3D PRINTING All types of parts can be printed from modern 3D printers, including from materials such as concrete, stainless steel, titanium, and more. China –built 10 small houses in 24 hrs
LASER SCANNING TECHNOLOGY New Construction Renovation
ROBOT SWAM CONSTRUCTION Fast Cheap
REBAR TYING MACHINE Saves time than traditional method Depends on speed the rate of the machine vary.
Precast Reduces the project duration High quality easily detachable
Construction Methods and its Activities TRADITIONAL Cement mortar Concrete Shuttering and formwork( wood,steel ) ADVANCED Gypsum mortar, R ena bond(brand name) RMC, Pervious concrete, ashcrete, ferrock Doka, aluminium,mivan
GYPSUM PLASTERING No water curing No shrinkage cracks Thermal conductivity No need of river sand Reduces 50 % of its building weight
PLASTERING MACHINE Uniform quality Thickness is achieved.
MIVAN TECHNOLOGY Speed of construction Superior Quality Aesthetics Building strength and durability Environmental benefits Efficiency and cost saving
DOKA FORMWORK Reduces labour costs for formwork positioning and retraction. Reduces crane time as entire unit repositions quickly. Offers speedy, precision adjustment of the form work in all directions. No need of scaffoldings to make the plat form for concreting of the structure Least damage to the plywood sheets whiles the removal of the form work. Easy to maintain the verticality than in the conventional form work. High efficiency in erection of form work than in conventional form wok. Offers complete safety in all phases of the operation. Wider plat forms increases the efficiency of work. Permit quick installation as platforms are preassembled. Finishing the concrete of RC walls or columns. the form work should kept for 24 hours to avoid shrinkage cracks on the walls or columns .
DEMOLITION Survey Removal of hazardous material Preparation of plan Method of demolition By manual By mechanical By explosives Explosion implosion
BIM(Building Information Modeling) Waste Not Want Not Maintain Control Simulate and Visualize Resolve Conflict Sequence Your Steps Present Perfectly
Ground improvement techniques Vibro Compaction Vacuum Consolidation Preloading of soil Soil stabilization by heating or vitrification Ground freezing Vibro - replacement stone columns Mechanically stabilized earth structures Soil nailing Micro-piles Grouting