Assembly Line Production Introduction

DheenathayalanRamasa 5,403 views 54 slides Jun 20, 2018
Slide 1
Slide 1 of 54
Slide 1
1
Slide 2
2
Slide 3
3
Slide 4
4
Slide 5
5
Slide 6
6
Slide 7
7
Slide 8
8
Slide 9
9
Slide 10
10
Slide 11
11
Slide 12
12
Slide 13
13
Slide 14
14
Slide 15
15
Slide 16
16
Slide 17
17
Slide 18
18
Slide 19
19
Slide 20
20
Slide 21
21
Slide 22
22
Slide 23
23
Slide 24
24
Slide 25
25
Slide 26
26
Slide 27
27
Slide 28
28
Slide 29
29
Slide 30
30
Slide 31
31
Slide 32
32
Slide 33
33
Slide 34
34
Slide 35
35
Slide 36
36
Slide 37
37
Slide 38
38
Slide 39
39
Slide 40
40
Slide 41
41
Slide 42
42
Slide 43
43
Slide 44
44
Slide 45
45
Slide 46
46
Slide 47
47
Slide 48
48
Slide 49
49
Slide 50
50
Slide 51
51
Slide 52
52
Slide 53
53
Slide 54
54

About This Presentation

Hope this presentation on Assembly Line Production - Introduction will be useful to Fresh Mechanical Engineers who look forward to kick start their career,Refresher for Experienced Mechanical Engineers and gives Exposure to Mechanical Engineering Students.The presentation starts with Assembly Line ...


Slide Content

Assembly Line Production –Introduction 1 Dheenathayalan.R Hosur [email protected]

Definition-Assembly Assembly - The process of putting together a number of parts ( to make a machine or other product). - The act of combining components Dheenathayalan.R Hosur [email protected] 2

Definition - Line Line – Is the Path and has direction ,length and thickness. Dheenathayalan.R Hosur [email protected] 3

Definition - Production Production –The processes and methods used to transform tangible inputs (raw materials,semi-finishedgoods , subassemblies) and intangible inputs (ideas, information, knowledge) into goods or services . Tangible - real , able to be shown, touched, or experienced. Intangible - unable to be touched, not having physical presence. Dheenathayalan.R Hosur [email protected] 4

Definition Assembly Line Production –is a  manufacturing process in which parts are added as the semi-finished assembly moves from workstation to workstation where the parts are added in sequence until the final assembly is produced. - is a production process that breaks the manufacture of a good into steps that are completed in a pre-defined sequence . Dheenathayalan.R Hosur [email protected] 5

Principle Assembly Line Production The principle of an assembly line is that each worker is assigned one very specific task , which he or she simply repeats , and then the process moves to the next worker who does his or her task, until the task is completed and the product is made . It is a way to mass produce goods quickly and efficiently. All workers do not have to be human; robotic workers can make up an assembly line as well. Note: Principle - a  basic idea  or rule that explains or controls how something happens or works Dheenathayalan.R Hosur [email protected] 6

Advantages –Assembly Line Production Dheenathayalan.R Hosur [email protected] 7 Speed & Mass Production Fair Product Cost Affordable Uniformity of f inished products Ease of repair Standardized Parts Employee Specialization (in a specific task) Average Skill level sufficient Ease of job rotation Able to share Improvements in Process, Product etc

Dis advantages –Assembly Line Production Dheenathayalan.R Hosur [email protected] 8 Higher initial c apital investment Inflexible Production facility Need of specialized machines Significant Space is required Employee Monotonous Work (Repetitive Work) Missing of unique craftsmanship(Luxury items). Motivational problems exists Skill level balancing will be a problem Overconfidence

Production & Productivity Dheenathayalan.R Hosur [email protected] 9 Production - the volume of outpu t irrespective of the quantity or quality of resources used to attain that level of output. Refers only to quantity produced. Measure of produced goods. Productivity - If we put in it element of efficiency with which the resources are employed, we enter the area of productivity .(How much is produced using what with its quantity,quality ) Measure of efficiency or rate of production. (Output/Input)

Production & Productivity Dheenathayalan.R Hosur [email protected] 10 For Exampl e consider Current Situation. Engines Produced( Nos ) = 50 Engines Manpower utilized( Nos ) =50 Men Productivity =50Engines/50Men =1Engine/1Men Case 1 :If we increase Engines produced to 60Nos and Manpower to 60Nos. Production has increased =from 50engines to 60 engines. Productivity remains Same. That is 60Engines/60Men=1Engine/1Men Case 2 :If we increase Engine produced to 60Nos and Manpower remains same at 50 Men. Here Production and Productivity both got increased . Production increase = from 50 Engines to 60Engines Productivity =60Engines/50 Men= 1.2Engines/Men Case 3 :If we keep engines produced same at 50Engines and reduce manpower to 40Men. Production remains same . Productivity increase =50 Engines/40Men= 1.25Engines/men Case 4 :If we increase engines produced to 68 Engines and increase manpower to 56 Men . Production has increased =from 50 engines to 68Engines. Productivity increase =68 Engines/56Men= 1.21Engines/Men

Takt Time Dheenathayalan.R Hosur [email protected] 11 Takt – Takt means pace or rhythm .Takt was borrowed from Taktzeit , a German word . Takt time is the maximum acceptable time to meet the customer demand. To calculate Takt time Takt time= Net available Time/Customer Demand Note:Net available time is the actual time available for doing the work.It excludes break times(Lunch time,Tea time etc)

Takt Time Dheenathayalan.R Hosur [email protected] 12 Example : Total Available time/Shift=480minutes Tea break(2times/shift) = 30minutes Net available time=480-30= 450minutes Demand per shift =50Engines Takt time =450/50=9minutes/Engine That is One engine will be produced every 9minutes.

Cycle Time Dheenathayalan.R Hosur [email protected] 13 Cycle time  - is the total time from the beginning to the end of process.  Cycle time includes process time , during which a unit is acted upon to bring it closer to an output, and delay time , during which a unit of work is spent waiting to take the next action. Cycle time starts when the actual work begins on the product and ends when it is ready for delivery .

Lead Time Dheenathayalan.R Hosur [email protected] 14 Lead Time – It is the time between order for a product and delivery of that product. Simply “ time between order and delivery ”. Example = Time between Customer placing an order and company deliver that order .

Difference between Cycle Time and Lead Time Dheenathayalan.R Hosur [email protected] 15 Consider below example Customer places order on January 01,2018 Work started on that order by the company on January 03,2018 Work completed on January 05,2018 Delivered to customer on January 06,2018 Lead time = 5Days Cycle time= 2Days

Standard Time Dheenathayalan.R Hosur [email protected] 16 Standard time - is the  time required by an average skilled operator , working at a normal pace , to perform a specified task using a prescribed method . Standard time = Normal Time + Total Allowances Note: Normal time = {(Time worked) / (Number of units produced)}*(Performance rating)

Standard Time Dheenathayalan.R Hosur [email protected] 17

Line Balancing Dheenathayalan.R Hosur [email protected] 18 Line Balancing - is leveling the workload across all processes in a cell or value stream to remove bottlenecks and excess capacity. Everyone is doing the same amount of work. No one is waiting . No one is overburdened . Variation is smoothed.

Bottle Neck Dheenathayalan.R Hosur [email protected] 19   Bottleneck  - is one process in a chain of processes, such that its limited capacity reduces the capacity of the whole chain. Has Maximum Stage Time . Significantly slows down production .(Impacts the output). Have More WIP(work in process) The station that consumes more cycle time. Limits the capacity of the system.

Bottle Neck Dheenathayalan.R Hosur [email protected] 20  

How to reduce Bottle Neck Dheenathayalan.R Hosur [email protected] 21   Possibility to Increase manpower . Possibility to increase machine/tools . Possibility to split the task and assign to prior stage/Later stage. Outsourcing -Partial/Full. Automation -Semi/Full. Process improvement . Reduce Setup time.Eg- SMED Note: SMED – Single -Minute Exchange of Dies.

Assembly Line Balancing Dheenathayalan.R Hosur [email protected] 22 Assembly line balancing - is a production strategy that sets an intended rate of production to produce a particular product within a particular time frame. That is “ the work is divided in to series of elementary tasks with short durations ”.

Need- Assembly Line Balancing Dheenathayalan.R Hosur [email protected] 23 To meet customer demand . To determine the speed of the assembly line. To determine the number of stages or number of workstations. To identify the bottleneck stage/operation . To equalize the workload among the employees. To reduce production cost .

Models - Assembly Line Balancing Dheenathayalan.R Hosur [email protected] 24 Model 1 Tries to determine the minimum workforce required to achieve a given desired production rate. Model 2 Tries to determine the maximum production rate which can be achieved with a given workforce . Note: Once the Takt time is determined we need to relate takt time with Man time, Machine Time & Setup time.

Time Study Dheenathayalan.R Hosur [email protected] 25 Time Study - a work measurement technique consisting of careful time measurement of the task with a time measuring instrument to establish the time required for completion of the task by a qualified worker when working at a defined level of performance. It will be adjusted for any observed variance from normal effort or pace and to allow adequate time for such items as foreign elements, unavoidable or machine delays, rest to overcome fatigue, and personal needs .

Motion Study Dheenathayalan.R Hosur [email protected] 26 Motion Study -Motion study is a systematic way of determining the best method of doing the work . Systematic recording and critical examination of existing and proposed ways of doing work as a means of developing and applying easier and more effective method and thereby reducing cost .

P redetermined M otion T ime S ystem (PMTS) Dheenathayalan.R Hosur [email protected] 27 PMTS - a procedure that analyzes any manual activity in terms of basic or fundamental motions required to perform it. Each of these motions is assigned a previously established standard time value and then the timings for the individual motions are synthesized to obtain the total time needed for performing the activity. Example for PMTS –MTM,MOST, etc MTM – M ethod T ime M easurement MOST - M aynard O peration S equence T echnique

MOST (M aynard O peration S equence T echnique) Dheenathayalan.R Hosur [email protected] 28 MOST - is a predetermined motion time system that is used primarily in industrial settings to set the standard time  in which a worker should perform a task . To calculate this, a task is broken down into individual motion elements , and each is assigned a numerical time value in units known as time measurement units, or TMUs , where 100,000 TMUs is equivalent to one hour. All the motion element times are then added together and any allowances are added, and the result is the standard time . 1 Hour = 100,000 TMUs 1 TMU = 0.00001 Hours 1 TMU = 0.036 Seconds 1 Second = 27.8 TMUs Basic Sequence Models in MOST General Move, Controlled Move, Tool Use

Lean Manufacturing Dheenathayalan.R Hosur [email protected] 29 Lean manufacturing  or lean production, often simply " lean ", is a systematic method for waste minimization / elimination (“Muda”) within a manufacturing system without sacrificing productivity.

Seven wastes - Lean Manufacturing Dheenathayalan.R Hosur [email protected] 30 Waste of overproduction ( more than what the customer wanted) Waste of rework (Defective product). Waste of waiting (the units should flow from one process to the next and ultimately, to the customer without any waiting) Waste of inventory ( make it to order and invoice it - inventory has no real value - a sale does!) Waste of transport ( reduce floor space , shrink the factory, reduce lead times) Waste of motion ( unnecessary movements - human) Waste from the process(Over processing). In modern times, 2 new wastes have been added Waste of a human being (an example is a machine watcher) Waste of natural resources (save the planet )

V alue S tream M apping (VSM) Dheenathayalan.R Hosur [email protected] 31 Value-stream mapping   is a  lean- management method for analyzing the current state and designing a future state for the series of events that take a product or service from its beginning through to the customer .   Toyota call it as " material- and information-flow mapping". The purpose of value stream mapping is to identify and remove or reduce "waste" in value streams, thereby increasing the efficiency of a given value stream .

V alue S tream M apping (VSM) Dheenathayalan.R Hosur [email protected] 32

One(Single) Piece Flow Dheenathayalan.R Hosur [email protected] 33 Completing the production of one unit from start to finish with little work in process (WIP) inventory between operations . It is the fundamental element of becoming Lean . The word " one " does not necessarily have a literal meaning . It should be related to the customers' requirements. Company should produce only “what, when & How much “ the customer wants.

SMED (Single-Minute Exchange of Dies) Dheenathayalan.R Hosur [email protected] 34 SMED - is a system for dramatically reducing the time it takes to complete equipment/Tool/Die changeovers.   The name Single-Minute Exchange of Dies comes from the goal of reducing changeover times to the “single” digits (i.e. less than 10 minutes ). SMED was developed by Shigeo Shingo , a Japanese industrial engineer.

Six Sigma (6σ) Dheenathayalan.R Hosur [email protected] 35 Six Sigma is a disciplined, statistical-based, data-driven approach and continuous improvement methodology for eliminating defects /reducing variation in a product, process or service.

Six Sigma (6σ) -Methodologies Dheenathayalan.R Hosur [email protected] 36

OEE –Overall Equipment Effectiveness Dheenathayalan.R Hosur [email protected] 37 OEE – an yardstick used in TPM to measure the perfection of manufacturing system. OEE = Availability * Usability * Performance Efficiency * Quality Rate * 100

5’S’ Dheenathayalan.R Hosur [email protected] 38 5S - is used to organize the workplace well so that it motivates people to perform well. S EIRI - Sort Out (Segregate) S EITON - Set in order (Arrange& Identify) S EISO - Shine (Wipe & Clean) S EIKETSU - Standardize S HITSUKE - Sustain (Discipline)

7 QC Tools Dheenathayalan.R Hosur [email protected] 39 Check Sheet Cause & Effect Diagram Control Chart Histogram Pareto Diagram Scatter Diagram Stratification Note : We need to identify the right tool for the problem.

Kaizen Dheenathayalan.R Hosur [email protected] 40 Kaizen – Japanese word means Continuous improvement. Kaizen – is small improvements systematically carried out on a continual basis by all employees. Principle: Very large number of small improvements (Value) = Large Improvement (Value)

POKA-YOKE Dheenathayalan.R Hosur [email protected] 41 Poka-Yoke a Japanese word is nothing but Mistake Proofing. It is a scientific technique used to prevent problems due to error. Mistakes can happen if not prevented. Poka-Yoke removes the possibility of mistakes being done. Poka-Yoke detects an error, gives a warning and can shut down the process.

FMEA – F ailure M ode & E ffect A nalysis Dheenathayalan.R Hosur [email protected] 42 FMEA is (1)Anticipation of potential failure modes and its effects. (2)Identifying causes for that failure modes. (3)Identify & recommend corrective / preventive actions to reduce/eliminate risks due to failures. (4)Put all controls in place. R isk P riority N umber(RPN) = S everity * O ccurrence * D etection(SOD) RPN is used for prioritization Types of FMEA System FMEA Design FMEA Process FMEA

S tatistical P rocess C ontrol (SPC) Statistical process control (SPC) is a method of quality control  which employs statistical methods to monitor and control a process. SPC helps to ensure that the process operates efficiently, producing more specification-conforming products with less waste (rework or scrap). Dheenathayalan.R Hosur [email protected] 43

Process Capability Process Capability is a statistical measurement of a process’s ability to produce parts within specified limits on a consistent basis. Dheenathayalan.R Hosur [email protected] 44

Process Capability Index Process Capability Index (C p) is ratio of Specified spread and actual Spread. Process Capability Index (CpK) is a measure of Process centering. CpK = Minimum of { } CpK is always less than or equal to Cp Dheenathayalan.R Hosur [email protected] 45

Torque Torque - Rotational energy about an axis or pivot point. - is a measure of the force that can cause an object to rotate about an axis . - Torque is used to create tension in threaded fasteners . Dheenathayalan.R Hosur [email protected] 46 Rotational Force Load (Force) Distance Point of Rotation Torque = Force (kg or N) * Distance (m) Unit = Kgm or Nm

Torque Wrench Torque Wrench - a tool used to apply precisely a specific torque  to a  fastener ( such as a nut or bolt). 1 Pascal = 1 N/m² = 1 (kg*m/sec²)/m² 1 kg = 9.80665 N , 1 N = 1 kg × m / s2 Dheenathayalan.R Hosur [email protected] 47

Methods of Tightening Threaded Fasteners Torque control tightening. Angle control tightening.( Rotation angle method) Yield controlled tightening. Bolt stretch method. Heat tightening. Use of tension indicating methods. Torque control tightening – Bolt tightening is controlled by the torque value . Dispersion of axial tension is wide . ( eg 100Nm) Angle control tightening (Rotation angle method) – Bolt tightening is controlled by the angle. Snug torque + defined angle . (eg 100Nm + 90± 5 ̊ ). Bolt is tightened within the plastic zone. Dispersion of axial tension is small. Snug torque - A tightening procedure in which a fastener is first tightened by a pre-selected torque. The torque required to pull plates together so that direct contact occurs ; often used in angle control tightening. It ensures that metal to metal contact occurs at all the interfaces within the joint. Dheenathayalan.R Hosur [email protected] 48

Bolt/Screw/Set Screw Bolt – is a threaded fastener , with a head , designed to be used in conjunction with a nut. Plain shank is present. Screw - A headed threaded fastener that is designed to be used in conjunction with a pre formed internal thread or alternatively forming its own thread . (Historically, it was a threaded fastener with the thread running up to the head of the fastener that has no plain shank ). Set Screw - It is a threaded member that normally does not have a head . Various socket types are provided to allow the set screw to be rotated . These types include hexagon socket , fluted socket, screwdriver slot . Dheenathayalan.R Hosur [email protected] 49

Bolt/Screw/Set Screw Bolt Dheenathayalan.R Hosur [email protected] 50 Screw Set Screw

Pneumatic (Torque) Wrench Pneumatic (torque) wrench  is a planetary  torque multiplier  or a gearbox that is mated to a pneumatic air motor . At the end of the gearbox is a reaction device that is used to absorb the torque and allows the tool operator to use it with very little effort . The torque output is adjusted by controlling the air pressure . Dheenathayalan.R Hosur [email protected] 51

Pneumatic (Torque) Wrench Impact wrench -   (also known as  impact gun, air gun) is a socket wrench power tool designed to deliver high torque output with minimal effort by the user , by storing energy in a rotating mass, then delivering it suddenly to the output shaft. Dheenathayalan.R Hosur [email protected] 52

Pneumatic (Torque) Wrench Pulse wrench - Pulse wrench (pulse tools) are discontinuous-drive tools . They apply torque in small increments rather than in one continuous blow . When the fastener is running free, the tool doesn't pulse and the driveshaft spins rapidly . Dheenathayalan.R Hosur [email protected] 53

Thank You Keep Learning Dheenathayalan.R Hosur [email protected] 54