Basic of work study

3,537 views 41 slides Feb 19, 2018
Slide 1
Slide 1 of 41
Slide 1
1
Slide 2
2
Slide 3
3
Slide 4
4
Slide 5
5
Slide 6
6
Slide 7
7
Slide 8
8
Slide 9
9
Slide 10
10
Slide 11
11
Slide 12
12
Slide 13
13
Slide 14
14
Slide 15
15
Slide 16
16
Slide 17
17
Slide 18
18
Slide 19
19
Slide 20
20
Slide 21
21
Slide 22
22
Slide 23
23
Slide 24
24
Slide 25
25
Slide 26
26
Slide 27
27
Slide 28
28
Slide 29
29
Slide 30
30
Slide 31
31
Slide 32
32
Slide 33
33
Slide 34
34
Slide 35
35
Slide 36
36
Slide 37
37
Slide 38
38
Slide 39
39
Slide 40
40
Slide 41
41

About This Presentation

basics of work study ppt


Slide Content

BASIC OF WORK STUDY , JOB DESIGN & WORK MEASUREMENT

WORK STUDY

INTRODUCTION With increasing complexities of the technological world, need to simplify the work system has been increasing day by day. Work study is an area of knowledge that addresses the problem of work simplification with the basic objectives of PRODUCTIVITY ENHANCEMENT, HUMAN COMFORT & SAFETY

EVOLUTION OF WORK STUDY F.W.TAYLOR: founder of modern method and time study. Taylor began his time study work in 1881. He established that each job should have a standard time, determined by time studies. In the timing process Taylor advocated dividing the work into small divisions of effort known as elements. Time was obtained for these element individually and their collective values were used to determine the allowed time for the task.

WORK OF GILBERTH Gilbreth is considered as the founder of ‘modern motion study technique’. Which is defined as the study of body motions used in performing an operation for the purpose of improving the operation by : Eliminating unnecessary motions Simplifying necessary motions Then establishing the most favorable motion sequence for maximum efficiency

IMPORTANCE:- Enhancing the production efficiency of the firm. Technique to identify non-value operations. Only accurate and systematic procedure oriented technique. Has got universal application.

DEFINITION “Work study is defined as that body of knowledge concerned with the analysis of the work methods and the equipment used in performing a job, the design of an optimum work method and the standardization of proposed work methods.” PREREQUISITES FOR CONDUCTING WORK STUDY

STEPS INVOLVED IN WORK STUDY 1. SELECT Job Or Process To Be Studied 2. RECORD All the details concerning job using various Recording Techniques 3. EXAMINE Recorded facts critically by asking questions like who, what, when, why 4. DEVELOP Most economical method 5. MEASURE The amount of work involved and set standard time to do that job 6. MEASURE The amount of work involved and set standard time to do that job 7. INSTALL The new method as a standard practice 8. MAINTAIN New method as agreed standards

PRINCIPLES OF WORK STUDY Must come from the top level management. People made aware of the objectives and the need of the exercising such study. Method study must precede work measurement .

OBJECTIVES To analyze the present method of doing a job, systematically in order to develop a new and better method. To measure the work content of a job by measuring the time required to do the job for a qualified worker and hence to establish standard time. To increase the productivity by ensuring the best possible use of human, machine and material resources and to achieve best quality product/service at minimum possible cost. To improve operational efficiency. To reduce waste through standardization of work elements of a job. To improve labor efficiency .

COMPONENTS / TECHNIQUES OF WORK STUDY

BENEFITS OF WORK STUDY Increased productivity and operational efficiency Reduced manufacturing costs Improved work place layout Better manpower planning and capacity planning Fair wages to employees Better working conditions to employees Improved work flow Reduced material handling costs Provides a standard of performance to measure labour efficiency Better industrial relations and employee morale Basis for sound incentive scheme Provides better job satisfaction to employees

ADVANTAGES OF METHOD STUDY Work simplification Improved working method ( cheaper method) Better product quality Improved work place layout Improved equipment design Better working conditions DisADVANTAGES OF METHOD STUDY High operating cost High wastage & scrap Excessive movement of materials and workmen Excessive production bottlenecks Excessive rejections and rework Complaints about quality

Work Measurement

DEFINATION :- “The application of techniques designed to establish the time for a qualified worker to carry out a specified job at a defined level of performance”

OBJECTIVES OF WORK MEASUREMENT :- 1. Comparing alternative methods 2. Assessing the correct initial manning (manpower requirement planning) 3. Planning and control 4. Realistic costing 5. Delivery date of planning 6. Cost reduction and cost control 7. Identifying substandard workers 8. Training new employees.

TECHNIQUES OF WORK MEASUREMENT :- 1) Repetitive Work:- The type of work in which the main operation or group of operations repeat continuously during the time spent at the job. These apply to work cycle of extremely short duration. 2) Non-repetitive Work:- It include some type of maintenance and construction work, where cycle itself is hardly ever repeated identically. VARIOUS TECHNIQUES:- 1)Time Study 2) Synthesis 3) work Sampling 4) Analytical Estimation 5)Predetermined Motion and Time Study.

Time study Time study is work measurement technique for recording the times and rates of working for the elements of a specified job carried out under specified under specified conditions

STEPS IN MAKING time STUDY:- 1)SELECT (Selecting job for work study) 2)OBTAIN & RECORD (Details Regarding methods,Operator , Job and working condition) 3)DEFINE (The element, Break the job into convenient for timing) 4)MEASURE (Time duration for each element and assess the rating) 5)EXTEND (Observed time into normal time {Basic time}) 6)DETERMINED (Relaxation and personal allowances) 7) COMPUTE ( Standard time for the operation for defined job or operation.)

Types of element A repetitive element – Is an element which occurs in every work cycle of the job. An occasional element - does not occur in each work cycle of the job, but which may occur at regular or irregular intervals. e.g. machine setting. a constant element - the basic time remains constant whenever it is performed. e.g. switch the machine on. A variable element - is an element for which the basic time varies in relation to some characteristics of the product, equipment or process, e.g. dimensions, weight, quality etc. e.g. push trolley of parts to next shop.

manual element - is an element performed by a worker . machine element - is automatically performed by a power-driven machine (or process). governing element - occupies a longer time than any of the other elements which are being performed concurrently. e.g. boil kettle of water, while setting out teapot and cups . foreign element - is observed during a study which, after analysis, is not found to be necessary part of the job. e.g. degreasing a part that has still to be machined further. Types of element

allowances Relaxation allowances Variable allowances Interference allowances Contingency allowances Policy allowances

Personal Allowance Constant Fatigue Allowance Variable Fatigue Allowance Fatigue Allowance Total Allowance Normal Time Standard Time Policy Allowance If applicable Contingence Allowance Relaxation Allowance VARIOUS ALLOWANCES TO BUILD STANDARD TIME

EXAMPLE on how to calculate standard time:

Work Measurement Standard time is used in: Costing the labor component of products Tracking employee performance Scheduling & planning required resources

Setting Standard Times Step 1 : Choose the specific job to be studied Step 2 : Tell the worker whose job you will be studying Step 3 : Break the job into easily recognizable units Step 4 : Calculate the number of cycles you must observe Step 5 : Time each element, record data & rate the worker’s performance Step 6 : Compute the normal time Step 7 : Compute the standard time

Example :-

WORK SAMPLING:- Work sampling was originally developed by L.H.C. Tippett in Britain in 1934 for the British Cotton Industry Research Board. DEFINATION:- A technique in which a statistically competent number of instantaneous observations are taken, over a period time, of a group of machines,processes or workers. Work Sampling has three main applications:- 1) Activity and delay Sampling:- T o measure the activities and delays of workers and machines. 2) Performance Sampling:- To measure working time and non working time of a person on a manual work and to establish a performance index or performance level for a person during his working time. 3) Work Measurement:- U nder certain circumstances, to measure manual task that is to established a time standard for an operation.

Job design – process by which managers decide individual job tasks and authority Job redesign – process by which managers reconsider what employees are expected to do The well-being of organizations and people relates to how well management designs jobs What is job design

Definition of job design Def: Job Design is the process of deciding on the content of a job in terms of its duties and responsibilities; on the methods to be used in carrying out the job, in terms of techniques, systems and procedures and on the relationships that should exist between the job holder and the superiors, subordinates and colleagues.

Goals of Job design Major Concern Purpose of Job Design Affect on Employee Impact

Design factor Layout of equipment and seating Instrument display design Compatibility Control design characteristics

Environmental factors Temperature and hummidity Vibration noise

Visual Environment Lighting Ventilation Behavioural dimensions of job design Job rotation Job enlargement Job enrichment

Job Rotation: Job Enlargement :Job Enrichment: Job Rotation: Refers to the movement of an employee from one Job to another. Please note: Jobs themselves are not actually Changed, only employees are Rotated among various jobs. Job Enlargement When a job is enlarged the tasks being performed are either enlarged or several short tasks are given to on worker, thus the scope of the Job is increased because there are many tasks to be performed by the same worker. Job Enrichment: Job enrichment as is currently practiced all over the work is a direct outgrowth of Herzberg’s Two factor theory of motivation.

Approaches to Job Design Engineering Approach: Human Approach: Job Characteristics Approach:

Engineering Approach: The work of every workman is fully planned out by the management at least on day in advance and each man receives in most cases complete written instructions, describing in detail the task which he/she has to accomplish-FW TAYLOR. Problem with this approach: Repetition-Mechanical pacing-no end product-little socal interaction-no input

Human Approach: The Human relations approach recognized the need to design jobs which are interesting and rewarding. Herzberg’s research popularized the notion of enhancing need satisfaction through what is called job enrichment. Factors involved: Motivators like achievement, recognition, work itself, responsibility, advancement and growth and Hygienic factors. According to Herzberg. The Employee is dissatisfied with the job if required maintenance factors to the required degree are not introduced into the job.

Job Characteristics Approach Theory by Hackman and Oldham states that employees will work hard when they are rewarded for the work they do and when the work gives them satisfaction. Hence integration of motivation, satisfaction and performance with job design. According to this approach Job can be described in terms of five core job dimensions: Skill Variety Task Identity Task significance Autonomy Feedback

Job Design Process: Job Design Process has to start from what activity needs to be done in order to achieve organizational goals. It requires use of techniques like work-study, process planning, organizational methods and organizational analysis and also technical aspects