Katse is also one of the world`s ten largest Concrete arch dams in terms of volume . Using 2.32 million cubic metres of concrete, The wall was built over a period of six years
Although the katse dam has power generation capacity for local use,the primary Purpose is as the storage reservoir for phase 1A and to provide discharge into the transfer tunnel
Five rivers that feeds Katse dam are Malibamatso Bokong Pelaneng Liphofung Mokhoulane
The primary purpose of the dam is to supply Water to RSA and generate hydropower
Katse dam is used to store water transferred through a tunnel to the Mohale reservoir , w ater is then transported to SA through a 32Km tunnel , enabling hydroelectric power to be p roduced at the Muela plant
Construction started on the Katse dam in 1991 On the Malibamatso`s river and the dam was C ompleted in 1997
SINCE 1991 the dam attract thousands of Thousands who came to see the engineering marvel
Katse dam is found on the boder of Leribe and Thaba tseka district. Activities done at Katse dam are Boating Pony trekking Hiking etc
List of references http://repository.up.ac.za/handle/2263/53 5213#:~:text=five %20rivers%2C%20namely %20the%20Malibamatso,feed%20into%20 the%20katse%20Dam https//www.Ihda.org.Is/home/tourism#:~ text=The%20Dam%20is%20one%20of,to%20 see%20this%20engineering%20marvel