Brief information of Indian power and introspection into KPCL
ssuser467e83
16 views
53 slides
Oct 18, 2024
Slide 1 of 53
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
About This Presentation
A brief information about Indian power scenario and Karnataka power corporation ltd .
Size: 10.05 MB
Language: en
Added: Oct 18, 2024
Slides: 53 pages
Slide Content
Er.VS.Ekbote
Er.VS.Ekbote
In the history of mankind
which one you think
The best inventions /
development ?
Er.VS.EkboteYearPlace State Type Cap.Unit
1897Darjeelinga WB Hydro 130KW Commissioned
1898Calcutta WB Diesel 1000KW Commissioned
1902Shimsha Karnataka Hydro 4.5MW Commissioned
1920Hussain Sagar Hyderabad APThermal 22.5MW Decommissioned 1992
1965Tarapur Maharastra Nuclear 300MW Commissioned
1977Obra UP Thermal PP 200MW Commissioned
1984Trombay Maharastra Thermal PP 500MW Commissioned
1987Singrauli UP Super TPS 2000MW Commissioned
2012Mundra Gujarata UMPP 4000MW Commissioned
First Plant In India
Year Appx.Cap. Unit
1900 2 MW
1947 1362 MW
1950 2000 MW
2000 100000 MW
2012 200000 MW
2024 450760 MW
Indian Energy Growth (MW) Er.VS.Ekbote
Er.VS.Ekbote
Er.VS.Ekbote
Per Capita Power Con. 1200 units
Er.VS.Ekbote
Er.VS.Ekbote
Total
Sub-Total Sub-Total (in MW)
Thermal coal gas
oil
Renewable-Hydro-
Wind-nuclear-
solar
Western
Region
96592.5 56100.54 155933.04 35.28% 35.98%
Gujarat 23643.41 27461.72 52945.13 11.98% 51.87%
Maharashtra 27213.09 17530.12 46143.21 10.44% 37.99%
Madhya Pradesh 22000 9333.37 31333.37 7.09% 29.79%
Southern
Region
53163.8 65570.94 122054.74 27.62% 53.72%
Tamil Nadu 15337.88 22210.93 39988.81 9.05% 55.54%
Karnataka (6 Th) 9505.2 21441.94 31827.15 7.20% 67.37%
Andhra Pradesh 18125.34 11029.33 29154.67 6.60% 37.83%
Northern
Region
53179.96 58267.19 113067.15 25.58% 51.53%
Rajasthan 11802.83 27103.89 40086.72 9.07% 67.61%
Uttar Pradesh 26888.14 5697.17 33025.31 7.47% 17.25%
Eastern Region 37829.71 8032.17 45861.88 10.38% 17.51%
West Bengal 13567 1982.13 15549.13 3.52% 12.75%
North-Eastern
Region
2450.95 2601.84 5052.79 1.14% 51.49%
Assam 1347.36 542.29 1889.64 0.43% 28.70%
Total 243216.92 190572.68 441969.6 100.00% 43.12%
State-wise all India installed power generation capacity as of 31 March 2024.
State/Union
Territory
Thermal (in MW)Renewable (in MW)
% of National
Total
%
Renewable Er.VS.Ekbote
Er.VS.Ekbote
KARNATAKA POWER CORPORATION LTD
(A Premier Power Generating Company)
The company is incorporated on
20
th
July 1970
with a capacity of 746MW and today proudly
owns a capacity of 9120MW .
Today, it contributes 1/3
rd
of state demand
amounting to 90muof energy / day
Er.VS.Ekbote
Er.VS.EkboteType of Projects No of ProjectsNo of Units MW
Thermal power plant 3 13 5020
Hydro power plant 21 80 3679.75
Solar power plant 5 6 34
Wind Power plant 1 20 4.555
Combined cycle power plant 1 1 370
Waste to Energy power plant 1 1 11.5
Total 32 121 9120
KPCL -Projects in Karnataka
Karnataka Power Corporation Ltd.
Major Projects
•Thermal Plants
•Raichur Thermal Power
Station
•Capacity = 1720MW
•Bellary Thermal Power
Station
Capacity =1700MW
•Yaramarus Thermal Power
Station
Capacity =1600MW
•Hydro Plants
•Sharavati Hydro electric
Project
•Capacity = 1469MW
•Nagjhari Hydro electric
Project
•Capacity = 1270MW
•Varahi Hydro electric Project
•Capacity = 469MW
Er.VS.Ekbote
Bellary Thermal Power Station
Capacity =1700MW
Er.VS.Ekbote
Raichur Thermal Power Station
Capacity = 1720MW
Er.VS.Ekbote
Yaramarus Thermal Power Station
Capacity =1600MW
Er.VS.Ekbote
YalahankaCombined Cycle Power Plant
Capacity =370MW
Er.VS.Ekbote
Bidadi-Waste to Energy Plant
Capacity 11.5MW
Er.VS.Ekbote
Er.VS.Ekbote
Er.VS.Ekbote
1
2
3
4
5
6
7
8 Er.VS.Ekbote
Er.VS.Ekbote
•Karnataka power demand curve for the day
Er.VS.Ekbote
Kali Hydro Electric Project Bird’s Eye View
6Dams
4Maindams
dams
2diversion
dams
Er.VS.Ekbote
Surge
tank
SUPA-100 MW
NPH-900 MW
KodasalliPH-120 MW
KadraPH-150 MW
Arabian Sea
Kali RiverProject MW UnitsInstalledTotal
NPH 150 6 900
Supa 50 2 100
Kodasalli 40 3 120
kadra 50 3 150
Kali Project MW Generation
1270
Er.VS.Ekbote
Er.VS.Ekbote
Specific Water consumption Project Head (M)
Sp.Qty. of water per
1MU Generation(Mcft)
Nagjhari PH 347 46
Supa PH 72 196
Kodasalli PH 37 391
Kadra PH 32 446
Produce about 43.5MU of power
with one TMC of Water
Er.VS.Ekbote
Kali Hydro Electric Project
WATER SHARE REGIONWISE
Er.VS.Ekbote
Storage Capacity of Major Dams
Er.VS.Ekbote
Rain Fall in RegionAverage / Year Remark
Karnataka 1248 mm
India 1250 mm
Coastal region 3100 mm 3736 mm in 2024
Coastal Region receives 2000 TMC Rain water/ Year
Coastal Dam storage cap.180 TMC Average RAIN FALL / STORAGE DETAILS
Er.VS.Ekbote
Guess the Energy Value of Kali
River ?
)
Plus
Other intangible benefits
Er.VS.Ekbote
HEAD RACE TUNNEL -9.5KM
ADIT 1190
KALI
NPH
BP DAM
Er.VS.Ekbote
Er.VS.Ekbote
EE(Gates)Kali/ Supa
Approx. Size of PH-44 m (Ht) X 50M (W) X 100M (L)
Draft Tube
Closure
River Level
Er.VS.Ekbote
Generator
Floor
ODY
Inflow water
Some of Major Areas / Equipments of
Hydro plant
•Water Catchment area
•Storage pond
•Dam
•Dam Radial gates
•Dam Sluice gate
•Dam Drainage Gallery
•Head race tunnels
•Penstock pipes
•Surge Tank
Er.VS.Ekbote
•Shut down valve / Main Inlet
valve
•Generator
•Turbine
•Auxiliary equipments
•Draft Tube
•Tail race
•Out door Yard
•Generator
MAIN INLET VALVE
Er.VS.Ekbote
Er.VS.Ekbote
GENERATOR
BEARING COOLING
SYSTEM
Generating
transformer
Er.VS.Ekbote
Francis Turbine
Er.VS.Ekbote
RIVER WATER
SAND FILTER
SYSTEM Er.VS.Ekbote
Excitation
system
51
Environment
Development
Let us be First start to
Live on Earth’s income rather than
eroding Earth’s Capital’
’
Important Places
•Ambikanagar
•Nagjhari Power House
•SkyesView Point
•BommanalliPick up
Dam
•KavalaCaves
•Kulginature camp
•GaneshGudi
•SupaDam view point
•SupaPower House
•River Rafting Area
•UlaviTemple
•Syntherirocks
•Kumbarwada
•Joida
•Backwater
•Yallapur
•Sathodifalls
•MagodFalls
•Shirley falls
•Jenukallugudda
•GanteGanapati
•Kavadikere
•Dandeli
•MoulangiEco Park in
Dandeli
•Crocodile park
•DandelappaTemple
•Paper Mill