Brief information of Indian power and introspection into KPCL

ssuser467e83 16 views 53 slides Oct 18, 2024
Slide 1
Slide 1 of 53
Slide 1
1
Slide 2
2
Slide 3
3
Slide 4
4
Slide 5
5
Slide 6
6
Slide 7
7
Slide 8
8
Slide 9
9
Slide 10
10
Slide 11
11
Slide 12
12
Slide 13
13
Slide 14
14
Slide 15
15
Slide 16
16
Slide 17
17
Slide 18
18
Slide 19
19
Slide 20
20
Slide 21
21
Slide 22
22
Slide 23
23
Slide 24
24
Slide 25
25
Slide 26
26
Slide 27
27
Slide 28
28
Slide 29
29
Slide 30
30
Slide 31
31
Slide 32
32
Slide 33
33
Slide 34
34
Slide 35
35
Slide 36
36
Slide 37
37
Slide 38
38
Slide 39
39
Slide 40
40
Slide 41
41
Slide 42
42
Slide 43
43
Slide 44
44
Slide 45
45
Slide 46
46
Slide 47
47
Slide 48
48
Slide 49
49
Slide 50
50
Slide 51
51
Slide 52
52
Slide 53
53

About This Presentation

A brief information about Indian power scenario and Karnataka power corporation ltd .


Slide Content

Er.VS.Ekbote

Er.VS.Ekbote
In the history of mankind
which one you think
The best inventions /
development ?

Er.VS.EkboteYearPlace State Type Cap.Unit
1897Darjeelinga WB Hydro 130KW Commissioned
1898Calcutta WB Diesel 1000KW Commissioned
1902Shimsha Karnataka Hydro 4.5MW Commissioned
1920Hussain Sagar Hyderabad APThermal 22.5MW Decommissioned 1992
1965Tarapur Maharastra Nuclear 300MW Commissioned
1977Obra UP Thermal PP 200MW Commissioned
1984Trombay Maharastra Thermal PP 500MW Commissioned
1987Singrauli UP Super TPS 2000MW Commissioned
2012Mundra Gujarata UMPP 4000MW Commissioned
First Plant In India

Year Appx.Cap. Unit
1900 2 MW
1947 1362 MW
1950 2000 MW
2000 100000 MW
2012 200000 MW
2024 450760 MW
Indian Energy Growth (MW) Er.VS.Ekbote

Er.VS.Ekbote

Er.VS.Ekbote

Per Capita Power Con. 1200 units
Er.VS.Ekbote

Er.VS.Ekbote

Total
Sub-Total Sub-Total (in MW)
Thermal coal gas
oil
Renewable-Hydro-
Wind-nuclear-
solar
Western
Region
96592.5 56100.54 155933.04 35.28% 35.98%
Gujarat 23643.41 27461.72 52945.13 11.98% 51.87%
Maharashtra 27213.09 17530.12 46143.21 10.44% 37.99%
Madhya Pradesh 22000 9333.37 31333.37 7.09% 29.79%
Southern
Region
53163.8 65570.94 122054.74 27.62% 53.72%
Tamil Nadu 15337.88 22210.93 39988.81 9.05% 55.54%
Karnataka (6 Th) 9505.2 21441.94 31827.15 7.20% 67.37%
Andhra Pradesh 18125.34 11029.33 29154.67 6.60% 37.83%
Northern
Region
53179.96 58267.19 113067.15 25.58% 51.53%
Rajasthan 11802.83 27103.89 40086.72 9.07% 67.61%
Uttar Pradesh 26888.14 5697.17 33025.31 7.47% 17.25%
Eastern Region 37829.71 8032.17 45861.88 10.38% 17.51%
West Bengal 13567 1982.13 15549.13 3.52% 12.75%
North-Eastern
Region
2450.95 2601.84 5052.79 1.14% 51.49%
Assam 1347.36 542.29 1889.64 0.43% 28.70%
Total 243216.92 190572.68 441969.6 100.00% 43.12%
State-wise all India installed power generation capacity as of 31 March 2024.
State/Union
Territory
Thermal (in MW)Renewable (in MW)
% of National
Total
%
Renewable Er.VS.Ekbote

Er.VS.Ekbote

KARNATAKA POWER CORPORATION LTD
(A Premier Power Generating Company)
The company is incorporated on
20
th
July 1970
with a capacity of 746MW and today proudly
owns a capacity of 9120MW .
Today, it contributes 1/3
rd
of state demand
amounting to 90muof energy / day
Er.VS.Ekbote

Er.VS.EkboteType of Projects No of ProjectsNo of Units MW
Thermal power plant 3 13 5020
Hydro power plant 21 80 3679.75
Solar power plant 5 6 34
Wind Power plant 1 20 4.555
Combined cycle power plant 1 1 370
Waste to Energy power plant 1 1 11.5
Total 32 121 9120
KPCL -Projects in Karnataka

Karnataka Power Corporation Ltd.
Major Projects
•Thermal Plants
•Raichur Thermal Power
Station
•Capacity = 1720MW
•Bellary Thermal Power
Station
Capacity =1700MW
•Yaramarus Thermal Power
Station
Capacity =1600MW
•Hydro Plants
•Sharavati Hydro electric
Project
•Capacity = 1469MW
•Nagjhari Hydro electric
Project
•Capacity = 1270MW
•Varahi Hydro electric Project
•Capacity = 469MW
Er.VS.Ekbote

Bellary Thermal Power Station
Capacity =1700MW
Er.VS.Ekbote

Raichur Thermal Power Station
Capacity = 1720MW
Er.VS.Ekbote

Yaramarus Thermal Power Station
Capacity =1600MW
Er.VS.Ekbote

YalahankaCombined Cycle Power Plant
Capacity =370MW
Er.VS.Ekbote

Bidadi-Waste to Energy Plant
Capacity 11.5MW
Er.VS.Ekbote

Er.VS.Ekbote

Er.VS.Ekbote

1
2
3
4
5
6
7
8 Er.VS.Ekbote

Er.VS.Ekbote

•Karnataka power demand curve for the day
Er.VS.Ekbote

Kali Hydro Electric Project Bird’s Eye View
6Dams
4Maindams
dams
2diversion
dams
Er.VS.Ekbote

Surge
tank
SUPA-100 MW
NPH-900 MW
KodasalliPH-120 MW
KadraPH-150 MW
Arabian Sea
Kali RiverProject MW UnitsInstalledTotal
NPH 150 6 900
Supa 50 2 100
Kodasalli 40 3 120
kadra 50 3 150
Kali Project MW Generation
1270
Er.VS.Ekbote

Er.VS.Ekbote
Specific Water consumption Project Head (M)
Sp.Qty. of water per
1MU Generation(Mcft)
Nagjhari PH 347 46
Supa PH 72 196
Kodasalli PH 37 391
Kadra PH 32 446

Produce about 43.5MU of power
with one TMC of Water
Er.VS.Ekbote
Kali Hydro Electric Project

WATER SHARE REGIONWISE
Er.VS.Ekbote

Storage Capacity of Major Dams
Er.VS.Ekbote

Rain Fall in RegionAverage / Year Remark
Karnataka 1248 mm
India 1250 mm
Coastal region 3100 mm 3736 mm in 2024
Coastal Region receives 2000 TMC Rain water/ Year
Coastal Dam storage cap.180 TMC Average RAIN FALL / STORAGE DETAILS
Er.VS.Ekbote

Guess the Energy Value of Kali
River ?
)
Plus
Other intangible benefits
Er.VS.Ekbote

HEAD RACE TUNNEL -9.5KM
ADIT 1190
KALI
NPH
BP DAM
Er.VS.Ekbote

Er.VS.Ekbote

EE(Gates)Kali/ Supa

Approx. Size of PH-44 m (Ht) X 50M (W) X 100M (L)
Draft Tube
Closure
River Level
Er.VS.Ekbote
Generator
Floor
ODY
Inflow water

Some of Major Areas / Equipments of
Hydro plant
•Water Catchment area
•Storage pond
•Dam
•Dam Radial gates
•Dam Sluice gate
•Dam Drainage Gallery
•Head race tunnels
•Penstock pipes
•Surge Tank
Er.VS.Ekbote
•Shut down valve / Main Inlet
valve
•Generator
•Turbine
•Auxiliary equipments
•Draft Tube
•Tail race
•Out door Yard
•Generator

MAIN INLET VALVE
Er.VS.Ekbote

Er.VS.Ekbote
GENERATOR
BEARING COOLING
SYSTEM
Generating
transformer

Er.VS.Ekbote
Francis Turbine

Er.VS.Ekbote

RIVER WATER
SAND FILTER
SYSTEM Er.VS.Ekbote
Excitation
system

415 V -SWITCH GEAR
Er.VS.Ekbote

DRAFT TUBE STOP LOG GATES
Er.VS.Ekbote

PENSTOCK PIPE
Er.VS.Ekbote

GENERATOR
FLOOR
Er.VS.Ekbote
GENERATOR OUTPUT
CONDUCTOR

220KV -ODY
Er.VS.Ekbote

T H E -W O R L D

51
Environment
Development
Let us be First start to
Live on Earth’s income rather than
eroding Earth’s Capital’

Important Places
•Ambikanagar
•Nagjhari Power House
•SkyesView Point
•BommanalliPick up
Dam
•KavalaCaves
•Kulginature camp
•GaneshGudi
•SupaDam view point
•SupaPower House
•River Rafting Area
•UlaviTemple
•Syntherirocks
•Kumbarwada
•Joida
•Backwater
•Yallapur
•Sathodifalls
•MagodFalls
•Shirley falls
•Jenukallugudda
•GanteGanapati
•Kavadikere
•Dandeli
•MoulangiEco Park in
Dandeli
•Crocodile park
•DandelappaTemple
•Paper Mill

Er.VS.Ekbote