The Need
•Tofulfilcustomer’sdemandandchallengingtothecompetitorsinthemarket,thequalityofproduction
andtransmissionshouldbeimprovedwithauser-friendlyDigitalbroadcastsetup.
•ToAchievehighestTRPandfulfilCommercialneedswithmoreadvertisers,Broadcaststandardshould
beimprovedbyusingStable&EfficientEquipment.
•ToEnsure24X7LiveProductionandTransmissionwithoutFailure,theequipmentshouldbeintegrated
andmanagedproperly.
•ForguaranteedStability,Reliability,andError-Freebroadcast,theequipmentshouldbeselected
properlyanddesignedwithbackupandby-passplatform.
Architecture
Department
•LiveStudios
•ProductionControlRoom
•MasterControlRoom(MCR)
•CentralApparatusRoom(CAR)
•Ingest,MonitoringandObserver
•RFTransmissionandDistribution
•EditandGraphics
•InformationTechnology
Department
•Maintenance,RepairingandTesting
•TechnicalSupportManagement
•ElectricalandAC
•QualityControlandBranding
•NewsDesk,AssignmentandEditorial
•CommercialContentManagement
•AllOtherDepartment
Live Studio
•ThereshouldbeTwoLiveStudiosStudio-1andStudio-2connectedwithPCR-1andPCR-2with
sound-prooftechnology.
•Studio-1shouldbemanagedwithatleastfour(4Nos.)ofwide-angleProfessionalCameraswith
CCUandRCP.
•Studio-2shouldcontainthree(3Nos.)ProfessionalcameraswithCCUandRCP.
•OnerealsetandonegreenChromasetmustbedesignedwithStudio-1.Studio2shouldbe
designedwithonevideowallsetupandoneChromaset.
•MicandCameracrossinterconnectionprovisionshouldbetherewithbothstudios.
•Cam-1ineachstudiomustbeemployedwithBroadcastStandardTeleprompter.
Studio Over View
.
StudioArchitecture
Production Control Room
•ThereshouldbeTwoLivePCR;PCR-1andPCR-2connectedwiththestudios.
•Standard2MEliveProductionswitcherand32/24channelSoundMixershouldbeconnectedwith
boththePCRwithprovisionofinterconnectionandby-passtechnology.
•2portstandardplay-out,PCRAutomation,GraphicsSystem,StandardTP,VTR,RouterPanel,
Hybrid,TalkBackSystem,Multi-Viewerwithotheradequateequipmentshouldbefixedwithproper
mountingfacility.
•Switcherframeandotherrack-mountequipmentshouldbefixedwithstandardrack.
•PowerDBandMDUmustbefixedwithstandardMCBandproperGroundingforpowermanagement.
•SchematicDiagramandCablenumberingshouldbemaintainedproperlyforAVandNetworking
equipment.
Information Technology
•CentralizedITserverroomwithLAN,NAS/SAN,FTP,InternetStreaming,LeaseLineConnectivity
shouldbemanagedforEntireChannelNetwork.
•ITServerroomshouldbeplacedneartotheCARinordertomaintainproperintegrationbetween
BroadcastandITEquipment.
•SeparateSwitchshouldbemaintainedforspecificdepartment/Divisionnetworkequipment.
•NAS/SANwithSufficientStoragewithBackupandLibraryArchivingSystemshouldbemaintainedasper
StandardProcedure.
•PasswordProtectionwithInternetAccessandNAS/SANismustforsecurityreasons.
All Other Department
•QualityControlandBrandingdepartmentshouldbetheretomanageOn-AirSignalqualityatTXand
RXwithallthelocationsaswellascustomerend.
•Alltheactivitieswithrespectivedepartmentshouldbemanaged accordingto
customer/viewer/Commercialpointofview.
•InputandOutputcontentwithlookandfeelandon-airpresentationshouldbemanagedasperSOP.
•NewsandAssignmentDeskshouldstrictlyfollowthestandardguidelinesforScriptWriting,Voice-
Over,NewsContentmanagement,Air-TimemanagementandVideoFootage.
•MakeupandCostumeshouldbemanagedstrictlyaccordingtotheOn-AirStandard.
•Sales/MarketingGuidelinesmustbefollowedstrictlywithweeklytargetbase.100%Markettarget
shouldbeachievedatanycost.
All Other Department
•TRP(TelevisionRatingPoint)shouldbeachievedaggressivelywitheveryprogrambroadcasted.
•CommercialcontentSchedulingmustbemanagedproperlywitheachprogramandshouldnot
befailedtobeaired.
•TransmissionReportmustbemaintainedwithoutfail.AlltheTransmissionErosshouldbe
highlightedinthereportsheetwithreason.
•AuditandResearchdepartmentshouldsendtheirreporttotheManagementondailybasison
commercialandrevenuepoint.
Prepared By:
Mr. Pravat Mohapatra
Broadcast Project and Operation
Thank You
The End