Building Technology 1 (P1)

NicoleFoo5 4,830 views 44 slides Dec 20, 2017
Slide 1
Slide 1 of 44
Slide 1
1
Slide 2
2
Slide 3
3
Slide 4
4
Slide 5
5
Slide 6
6
Slide 7
7
Slide 8
8
Slide 9
9
Slide 10
10
Slide 11
11
Slide 12
12
Slide 13
13
Slide 14
14
Slide 15
15
Slide 16
16
Slide 17
17
Slide 18
18
Slide 19
19
Slide 20
20
Slide 21
21
Slide 22
22
Slide 23
23
Slide 24
24
Slide 25
25
Slide 26
26
Slide 27
27
Slide 28
28
Slide 29
29
Slide 30
30
Slide 31
31
Slide 32
32
Slide 33
33
Slide 34
34
Slide 35
35
Slide 36
36
Slide 37
37
Slide 38
38
Slide 39
39
Slide 40
40
Slide 41
41
Slide 42
42
Slide 43
43
Slide 44
44

About This Presentation

IBS Calculations


Slide Content

1
TAYLOR’S UNIVERSITY
SCHOOL OF ARCHITECTURE, BUILDING AND DESIGN (SABD)
BUILDING TECHNOLOGY I
BLD 61403
INDUSTRIALIZED BUILDING SYSTEM
320213MOHAMAD ANWAR B FAUZI
324705TEO CHIA YEE
3225517NICOLE FOO SHULI
325069HARASHADEEP KAUR
321409DANIAL MAZLAN
325736ASHROFF B ABD WAHAB
TUTOR : MR KHAIROOL

2
INTRODUCTION
ACKNOWLEDGMENT 4
OBJECTIVE 4
PROPOSED IBS SYSTEM
PRECAST CONCRETE 5
PREFABRICATED TIMBER 5
BUILDING COMPONENTS
PRECAST FOUNDATION 6
PRECAST COLUMNS 6
PRECAST BEAMS 7
PRECAST FLOOR SLAB 7
PRECAST WALLS 8
PRECAST STAIRCASE 8
PREFABRICATED ROOF FRAME 8
JOINING METHODS
COLUMN TO COLUMN 9
COLUMN TO BEAM 9
BEAM TO WALL 10
BEAM TO SLAB 10
STAIRS AND CONNECTION 11
TRUSSES TO ROOF BEAM 12
ROOF FINISHES 12
CONTENTS

3
PROCEDURE 13
DRAWINGS 18
SCHEDULE 36
IBS SCORE 41
REFERENCES 44

4
ACKNOWLEDGMENT
Various parties have made the completion of this projection possible and hopefully a success. We would like to thank our lecturer Mr Rizal who had provided us
with the necessary theory in order to understand the Industrialized Building System (IBS), including organizing field trips for us   More importantly, we would like to
thank Mr Khairool our tutor for being willing to answer our questions even outside tutorial-designated hours. Mr Khairool’s suggestions definitely gave us new
perspective and made the writing of the report more concise.  I heartily thank the School of Architecture Building and Design (SABD) at Taylor’s University for giving
us this opportunity to carry out research on a topic that is going to become very important both locally and internationally when more and more prefabricated forms
of construction will be preferred.
We are also thankful to and fortunate enough to get constant encouragement, support and guidance from each other as group members, whom, without our various
contributions, would not be able to produce a report of quality.
OBJECTIVE
We would like to determine the many methods of constructing a building out of standardized system known as Industrial Building System (IBS), only very recently
implemented in our country. In Malaysia, the prefabrication technology is known as industrialized building system (IBS) which is defined as a complete process
system of construction works where almost all the component structures is manufactured onsite or offsite, and the product is transported to the site and to be
installed in the high precision coordinate joint as well as achieve high quality works, and accelerate the time of completion of the projects. The benefits of
prefabrication helped the Housing Ministries in various countries to fulfill the high demand for housing inMalaysia. Providing affordable homes are becoming a vital
issue to meet the increasing demand for houses with the increase in the population growth. The most popular IBS component used in Malaysia is precast
components. Over the years, the total number of IBS precast manufacturing has increased from 15 in 2009 to 36 factories in the year 2011.As a group, we would like
to demonstrate that creating a structure according to IBS is not impossible , this increasing this upward trend in the usage of IBS systems as it is extremely
efficient.

5
PRECAST CONCRETE
Our apartment block comprises of a hybrid system ; a combination of precast concrete system as well as a prefabricated timber framing. The prefabricated timber
will be used exclusively for the structure of the roof trusses as well as rafters whereas the rest of the structure is precast. This includes the foundation, external and
internal walling, flooring, columns and beams, as well as staircase.
PREFABRICATED TIMBER
Precast concrete is a construction product produced by casting concrete in reusable mould or form which is then cured in a controlled environment, transported to
the construction site a lifted to be set into place. A fully precast building is constructed by using various prefabricated elements required in the building structure.
PROPOSED IBS SYSTEM
ADVANTAGES DISADVANTAGES
Quality and strength assured since produced in controlled factory conditionsDifficult to produce non-regular organic shapes
Quality also easily monitored Requires transportation to site that may be costly
Material for production is cheap since material can be bought in bulkSome components are heavy and cranes are required to install
Same result in any weather conditions so appropriate mixes are achieved.
No setting time and immediate installation can take place.
Modularity of components is achieved very quickly
Less labour required
ADVANTAGES DISADVANTAGES
Lower cost than steel if finishes and wood type are not expensive Extra measures like waterproofing must be taken
Higher aesthetic value and gives warmer impression especially for residential homes.Subject to rot and quicker decay
Do not require extra carpentry space on site Wood is flammable so extra measures must be taken for fire proofing
Environmentally friendly material
Little limits on design
A roof truss consists of one or more triangular units constructed of pieces that are connected by joints. The triangular shape of the truss adds stability and support by
distributing weight away from the exterior walls. Timber roof trusses may be used in commercial applications, but they are generally used for residential construction,
which is why we considered it for our roof structure.

6
PRECAST FOUNDATION
PRECAST COLUMNS
BUILDING COMPONENTS
Precast columns These can be produced to have either single or multiple story corbel
to allow multiple levels of components such as walls and beams to sit on the
columns. This reduces installation time. However, we have chosen to utilize single
story corbel-columns of solid rectangular section.
Precast foundation was economical choice for us as the foundation footing has
reinforcement bars and regulators already present inside. Foundation is placed
directly on ground and brought to the appropriate height through the use of these
regulators (as noted in diagram) No concrete underpinning needs to be poured
since the regulators also lift the rebar from the terrain
Regulator
Our column choice
Precast components
•Foundation
•Columns
•Beams
•Slabs
•Walls
•Staircase
Prefabricated Timber components
•Roof Truss
Additional Components
•Standardized window size
•Standardized door size
•Standardized use of railings
•Toilet pods

7
PRECAST BEAM
PRECAST FLOOR SLABS
Hollow core slabs are prestressed concrete elements that are commonly used for floorings in homes and commercial buildings. As the name suggests, this type of
slab possesses voids called ‘cores’ that run through its entire length, with the main intention of reducing the overall slab weight. These cores can also be used as
service ducts. Steel strands are placed within the slabs running longitudinally as reinforcements, which allows slabs to have long spans without propping.
Furthermore, hollow core slabs possess high flexibility in design, and are available with a variety of notches, slots, and reinforcement arrangements.
L-Beams/ Spandrel
L-beams are prestressed concrete elements that, together with inverted
tee-beams, make up a flooring system. They are characterized by the L-
shaped cross-section from which the name is derived. Like inverted tee-
beams, L-beams provide ledgers for precast slab units to sit on. They are
commonly found at the external walls (the edges of the floor unit) or
around the staircase.
Solid Rectangular Beam
Solid Beams are some of the most commonly used type of beams used in both
smaller and larger scale construction. These come usually prestressed and in a
wide range of dimensions. These may not be conducive when high bending moment
is present as the shape is makes it inflexible. We have utilized these in our ground
floor whereby it is connection to the pad footing of the foundation.
We have used a combination of L-beans and solid beams after many changes to our structure throughout the design process. We had used L-beams for the ground
floor whereas the L-shape beams throughout the other floors. We found this shape to be versatile as it suited our design where we needed both walls and slab to sit
on the beams.
ADVANTAGES DISADVANTAGES
Maximum structural efficiency for every slab thicknessExpensive transportation to site and erection
Variety of shapes and sizes available, with long spans Large and heavy
Eliminates ducting work as system components can be hidden
Less vibration and strong acoustical performance

8
PRECAST WALLS
Our walls are solid rectangular-section walls. Some have prefabricated openings in order to allow for placement of window to be installed on site Cranes will be
needed to erect these walls and transportation to site can be quite costly. There are other types of precast walls like ribbed, double tee and mullion0ed but
PRECAST STAIRCASE
ADVANTAGES DISADVANTAGES
Rapid speed of erection Small margin for error
Maintaining cleanliness of site as production materials not
needed
Economics of scale demand regularly shaped buildings
Higher quality due to controlled measures taken in factory
ROOF FRAME
Our roof frame will be constructed with a series of prefabricated timber trusses. The primary shape
of the truss is a typical long-bearing truss shape which is ideal for longer spans of roof. Many of the
advantages and benefits are similar to that of using prefab timber in general
ADVANTAGES DISADVANTAGES
Higher quality due to controlled measures taken in factoryCan be expensive to transport
Can be installed much faster than in-situ stairs Difficult to produce complex shapes like spiral or curve
Unlike in situ stairs, precast stairs can be used directly
after installation by workers as no drying time is required.
The shape of our primary timber truss

9
COLUMN TO COLUMN
COLUMN TO BEAM
JOINING METHODS
Metal bearing plates and embedded anchor bolts are cast into the ends of
the columns. After column is mechanically joined, the connection is grouted
to ensure full load bearing between elements and to protect metal
components from corrosion.
With accurate placement, the weld plates are casted into beams and columns
respectively. A bearing plate is placed between the beam and column
connection. It is used to transfer concentrated compressive forces between
the two structural elements. The weld plates are welded after the beams and
columns are held into place, this is to fully secure the said connection.
Anchor bolts
connected to bearing
plates
COLUMN TO COLUMN
COLUMN
BEAM
BEAM TO COLUMN
METAL BEARING PLATES
METAL BEARING PLATES
SHIM
GROUT
CONCRETE
ANCHOR BOLT
WELD PLATES
BEARING
PLATES
COLUMN TO COLUMN
COLUMN
BEAM
BEAM TO COLUMN
METAL BEARING PLATES
METAL BEARING PLATES
SHIM
GROUT
CONCRETE
ANCHOR BOLT
WELD PLATES
BEARING
PLATES

10
BEAM TO WALL
BEAM TO SLAB
Precast walls are casted with connecting rebars left protruding which will
eventually connect to the holes casted into beams. After the elements are put
into place, the connection is grouted in order to secure its standing.
Precast hollow core slabs are placed onto the ledge of the L-shaped beam
and then the connection is grouted to hold it into place.
Diagram to show how L-beam, hollow core slab and
column is connected within our structure

11
STAIRCASE CONNECTIONS
Landing to wall connection - The landing slab sits on a
RSA (Rolled Steel Angle) that is bolted to the wall. A
Structural shim packer is placed between the RSA and
landing slab, it serves to level the landing slab before
commitment.
Stairs to slab connection - The stairs sits on a structural shim packer which sits on
the ledge casted into the floor slab. A hole is then bored through the step of the of
the stairs and the shim packer and stops when it reaches into the slab. A metal
dowel piece is then inserted into the hole and the hole is then sealed by grout.
LANDING TO WALL CONNECTION
STAIRS TO SLAB CONNECTION
FLOOR SLAB
FLOOR SLAB
CONNECT TO WALL
CONNECT TO WALL
CONNECT TO WALL
LANDING SLAB
WALL
ANCHOR BOLT
RSA (ROLLED STEEL ANGLE)
STRUCTURAL SHIM PACKERS
(10MM THICK)
STAIRS
FLOOR SLAB
STRUCTURAL SHIM PACKERS
(10MM THICK)
DOWEL HOLE
(30MM DIA.)
LANDING TO WALL
STAIRS TO SLAB
Due to our usage of straight flight staircase, we do not
have any integral landing connected at the factory.
Hence the two floor slabs and one landing slab are
needed
Straight flight stairs
The connection between the stairs and slab is of a typical notch joint as seen in
typical precast stairs
Example of notch joint at the
upper floor slab

12
TRUSSES TO ROOF BEAM
ROOF FINISHES
Two metal weld plates sandwiches the wooden rafter and is held together by
two-sided bolts. Weld plates are casted into concrete roof beam with
accurate placement. After the rafter sits in place on the beam, the weld
plates are welded together, the securing its placement allowing the rafter to
transfer loads to beam well.
Two metal weld plates sandwiches the
wooden rafter and is held together by
two-sided bolts. Weld plates are casted
into concrete roof beam with accurate
placement. After the rafter sits in place
on the beam, the weld plates are welded
together, the securing its placement
allowing the rafter to transfer loads to
beam well.
Example of joining between
timber battens and roof
tiles

13
PRODUCTION OF PRECAST CONCRETE PIECES
PROCEDURE
STEP 1 : Producing the reinforced-bar cages
for each component needed. Welding is
needed to join the parts
STEP 2 The reinforced cage is placed inside
a mould that is partially complete and
usually made of timber. Then the mould is
closed up
STEP 3 The specified concrete mix is poured
into the wooden mould. Sometimes
computers replace manual methods in
determining the amount needed
STEP 4 Compaction of concrete
using vibrator to achieve optimum
density. High frequency vibrators or
pokers may be used.
STEP 5 Moving precast
into storage area
STEP 6 Storage of high quality units
in order to prepare to be transported
STEP 7 AND 8 Transportation to site is done in a predetermined
sequence so construction can take place according to arrangement
INSTALLATION
PRODUCTION OF PREFABRICATED WOOD FRAME
STEP 1 : Custom
profiling
STEP 2 : Custom
milling
STEP 3 : Test fit
connections
STEP 4 : Factory
prestaining
STEP 5 : Testing
structural integrity of
joinery
STEP 6 : Completion
of joinery
STEP 7 :
Transportation to
site

14
STEP 1 1 STEP 1 2
STEP 1 3 STEP 1 4
Prefabricated pad foundation is placed on top of
excavated terrain with the installation of padfooting
columns with corbels
Rectangular section beams are placed on top of
corbels of columns accordingly
Hollow core precast slabs are then placed on top of
the rectangular beams. For the ground floor, cranes
may not be needed to install these
Precast walls are then installed on top of beams and
floor slabs of the ground floor. Usually a crane is
needed to place these with some manual assistance.
Toilet pod for ground floor also installed.

15
STEP 5 STEP 11
STEP 7 STEP 8
5 6
7 8
Columns with single story corbel are then placed on
top of the pad-footing columns
Crane is used to installed precast L shape / Spandrel
beams on top of columns
Staircase is installed using a crane to connect the
ground and first floor landing .
A crane will be needed to lift these heavy hollow core
slabs on to the beams and columns of the ground
floor.

16
STEP 9 STEP 01
STEP 11 STEP 12
9 10
11 12
Repetition of step 4 whereby windows are installed
using crane
Repetition of step 5 but instead ground floor columns
are connection to first floor columns
Repetition of step 6 but instead first floor L beams
are not placed on to first floor columns
Repetition of step 7. This time stairs used to connect
first floor to landing of second floor

17
STEP 13 STEP 14
STEP 15
After repeating steps 4 to 6 yet again, beams of the
second floor are then placed on to the walls.
The roof trusses are then installed on to the beams of
the upper floor. Rafters are installed also
The roof bracing is installed within the roof truss.
Additional components like doors and windows are
also installed via crane or manually. In addition, metal
railings are installed throughout areas without
external wall and by the staircase.
13 14
15

18
DRAWINGS

19
BEDROOM 1
TOILET 1
BEDROOM 2 BEDROOM 3
TOILET 2
KITCHEN
DININGROOM
LIVINGROOM
BEDROOM 1
TOILET 1
BEDROOM 2 BEDROOM 3
TOILET 2
KITCHEN
DININGROOM
LIVINGROOM
UP
1
2
3
4
5
6
7
8
9
ABCDEF
ARCHITECTURAL GROUND FLOOR PLANSCALE 1:100
3000
3000
3000
3000
3000
3000
1500
1500
21000
30003000 300030003000
1225
1500
1500
AA

20
BEDROOM 1
TOILET 1
BEDROOM 2 BEDROOM 3
TOILET 2
KITCHEN
DININGROOM
LIVINGROOM
BEDROOM 1
TOILET 1
BEDROOM 2 BEDROOM 3
TOILET 2
KITCHEN
DININGROOM
LIVINGROOM
UP
ARCHITECTURAL FIRST FLOOR PLANSCALE 1:100
1
2
3
4
5
6
7
8
9
ABCDEF
3000
3000
3000
3000
3000
3000
1500
1500
21000
30003000 300030003000
1225
1500
1500
AA

21
BEDROOM 1
TOILET 1
BEDROOM 2 BEDROOM 3
TOILET 2
KITCHEN
DININGROOM
LIVINGROOM
BEDROOM 1
TOILET 1
BEDROOM 2 BEDROOM 3
TOILET 2
KITCHEN
DININGROOM
LIVINGROOM
DOWN
ARCHITECTURAL SECOND FLOOR PLANSCALE 1:100
1
2
3
4
5
6
7
8
9
ABCDEF
3000
3000
3000
3000
3000
3000
1500
1500
21000
30003000 300030003000
1225
1500
1500
AA

22
ROOF PLANSCALE 1:100
1
2
3
4
5
6
7
8
9
ABCDEF
20100
17100
8100
23100
1500
1500
AA

23
1
2
3
4
5
6
7
8
9
ABCDEF
STRUCTURAL PLANSCALE 1:100
21000
30003000 300030003000
1500
3000
3000
3000
3000
3000
3000
1500
4500
1500
4500
1500

24
1
2
3
4
5
6
7
8
9
ABCDEF
STRUCTURAL FOUNDATION PLANSCALE 1:100
21000
30003000 300030003000
1500
3000
3000
3000
3000
3000
3000
1500
4500
1500
4500
1500

25
1
2
3
4
5
6
7
8
9
ABCDEF
STRUCTURAL FLOOR PLAN WITH FLOOR SLABSSCALE 1:100
21000
30003000 300030003000
1500
3000
3000
3000
3000
3000
3000
1500
4500
1500
4500
1500
void

26
B5
B5
STRUCTURAL FOUNDATION PLAN (COMPONENTS INDICATED)SCALE 1:100
B6
B6
B6
B6
B5
B7
B11
B7
B10
C1
C1
B5
B7
B5
B6
B6
B6
B5
B7
B11
B10 B10 B10

27
STRUCTURAL PLAN 1 (INDICATED COMPONENTS)SCALE 1:100
COMMONGROUND FLOORFIRST FLOORSECOND FLOOR
B5
B5
B2
B2
B6
B6
B11
B7
B10
C1
B10 B10 B10
B6
B6
B4
B7
B3
B5
B1
C1
C1C1
C1
C2
C2
C2
C3C3
C3
C3
C3 C3C3
C3
C3
C4C4
C6C5
C7
C7C7
C8
C8
C8
C7
C9C9
C9C9
C9
C9
C10C10
C9
C11
C9
C12
C13
C15
C15
C15 C15
C15
C15
C15
C15
C16
C16
C17 C18
C9
C15
C13
C13 C13
C14
C14C14

28
STRUCTURAL PLAN 2 (INDICATED COMPONENTS)SCALE 1:100
COMMONGROUND FLOORFIRST FLOORSECOND FLOOR
W1
W1
W7
W7
W4W10
W3W9
W3W9
W2W8
W2 W2W8W8
W6
W12
W5W11
W7
W7
W7W7
W7
W6
W12
W5W11
W4W4W4
W7

29
void
STRUCTURAL PLAN WITH FLOOR SLABS (INDICATED COMPONENTS)SCALE 1:100
F1
F1
F1
F1
F1
F1
F1
F1
F1
F1
F1
F1
F1
F1
F1
F2 F2F3
F3
F1
F1
F1
F1F1
F1
F1
F1
F4 F4
F4F4
F1
F1
F1
F1
F1
F1
F1
F1
F1F1 F1 F1
F1F1F1F1
F1
F1F1
F1
F3

30
BEDROOM 1
TOILET 1
BEDROOM 2 BEDROOM 3
TOILET 2
KITCHEN
DININGROOM
LIVINGROOM
BEDROOM 1
TOILET 1
BEDROOM 2 BEDROOM 3
TOILET 2
KITCHEN
DININGROOM
LIVINGROOM
UP
FLOOR PLAN (INDICATED COMPONENTS)SCALE 1:100
T1
T1
T4
T4
T2
T2
T3
T3
D1
D1
D1
D1
D1 D1
D1D1
D1
D1
D2
D2
D3
D3
D3D3
D3D3
D4
D4
D4
D4
D4D4
D4 D4

31
FRONT ELEVATIONSCALE 1:100
1
2
3
4
5
6
7
8
9
3000
3000
3000
3000
3000
3000
1500
1500
21300
3400 3200 3000
ROOF LEVEL1940
GROUND FLOOR LEVEL FIRST FLOOR LEVEL SECOND FLOOR LEVEL

32
SIDE ELEVATIONSCALE 1:100
A
B
C
D
E
F
3400 3200 3000
ROOF LEVEL1940
FIRST FLOOR LEVEL SECOND FLOOR LEVELGROUND FLOOR LEVEL

33
3400 3200 3000
ROOF LEVEL1940
FIRST FLOOR LEVEL SECOND FLOOR LEVELGROUND FLOOR LEVEL
SECTION A-ASCALE 1:100
A
B
C
D
E
F

34
EXTERIOR PERSPECTIVE
SCALE : N/A

35
SCHEDULE

36
DESCRIPTIONLENGTH (L x W x H)
GROUND FLOOR COLUMNS300 x 300 x 3400
QUANTITY
24
LOCATION
3400
500200
300
300
300
300
DESCRIPTIONLENGTH (L x W x H)QUANTITYLOCATION
300
300
DESCRIPTIONLENGTH (L x W x H)QUANTITYLOCATION
300
300
DESCRIPTIONLENGTH (L x W x H)QUANTITYLOCATION
300
200
500
3400
300
300
500
200
3400
300
300
500
200
3400
250
100
150
300
150
GROUND FLOOR COLUMNS300 x 300 x 3400GROUND FLOOR COLUMNS300 x 300 x 3400GROUND FLOOR COLUMNS300 x 150 x 3400 184812 A2, D1, D3, E1, A8, D7, D9, F 9
A3, A4, F3, A6, A7, F7A5, B2, B3, B4, B5, C2, C3, D2, E1, B6B7, B8, C7, C8, D8, E9C4, D4, C6, D6
DESCRIPTIONLENGTH (L x W x H)QUANTITYLOCATIONDESCRIPTIONLENGTH (L x W x H)QUANTITYLOCATION
300
150
300
150
500
3400
300
150
200
100
250
200
300
150
200
250
500
3400
100
GROUND FLOOR COLUMNSGROUND FLOOR COLUMNS300 x 150 x 3400GROUND FLOOR COLUMNS300 x 150 x 3400 66 F4, F6E4, E6
DESCRIPTIONLENGTH (L x W x H)
FIRST FLOOR COLUMNS
QUANTITYLOCATION
300
300
DESCRIPTIONLENGTH (L x W x H)QUANTITYLOCATION
300
300
DESCRIPTIONLENGTH (L x W x H)QUANTITYLOCATION
300
300
DESCRIPTIONLENGTH (L x W x H)QUANTITYLOCATION
300
150
3200
200
300
300
500
3200
200
300
300
500
300
300
3200
200
500
3200
200
500
300
150
300
250
300 x 300 x 3200FIRST FLOOR COLUMNS300 x 300 x 3200FIRST FLOOR COLUMNS300 x 300 x 3200FIRST FLOOR COLUMNS300 x 300 x 3200FIRST FLOOR COLUMNSFIRST FLOOR COLUMNS300 x 150 x 3200 18 244812 A2, D1, D3, E1, A8, D7, D9, F 9A3, A4, F3, A6, A7, F7A5, B2, B3, B4, B5, C2, C3, D2, E1, B6B7, B8, C7, C8, D8, E9C4, D4, C6, D6
200
DESCRIPTIONLENGTH (L x W x H)QUANTITYLOCATIONDESCRIPTIONLENGTH (L x W x H)QUANTITYLOCATION
300
150
300
150
3200
150
300
250
300
3200
500200
300
250
150
300
FIRST FLOOR COLUMNS300 x 150 x 3200FIRST FLOOR COLUMNS300 x 150 x 3200 66
F4, F6
E4, E6
C1C2C3C4
C5C6
C7C8C9
C10
C11C12
COLUMNS
GROUND FLOOR COLUMNS FIRST FLOOR COLUMNS

37
DESCRIPTIONLENGTH (L x W x H)QUANTITYLOCATION
A2, D1, D3, E1, A8, D7, D9, F 9
300
300
DESCRIPTIONLENGTH (L x W x H)QUANTITYLOCATION
300
300
DESCRIPTIONLENGTH (L x W x H)QUANTITYLOCATION
300
300
DESCRIPTIONLENGTH (L x W x H)QUANTITYLOCATION
300
150
300
300
200
3000
3000
200
300
300
3000
200
300
300
3000
250
200
300
300
300
300
200
300
300
150
SECOND FLOOR COLUMNS300 x 300 x 3000SECOND FLOOR COLUMNS300 x 300 x 3000SECOND FLOOR COLUMNS300 x 300 x 3000SECOND FLOOR COLUMNS300 x 150 x 3000 18 244812 A3, A4, F3, A6, A7, F7A5, B2, B3, B4, B5, C2, C3, D2, E1, B6B7, B8, C7, C8, D8, E9C4, D4, C6, D6
DESCRIPTIONLENGTH (L x W x H)QUANTITYLOCATIONDESCRIPTIONLENGTH (L x W x H)QUANTITYLOCATION
300
150
300
150
300
200
250
200
300
150
300
3000
3000
250
300
200
100
150
300
SECOND FLOOR COLUMNS300 x 150 x 3000SECOND FLOOR COLUMNS300 x 150 x 3000 66 F4, F6E4, E6
C13C14C15C16
C17C18
COLUMNS
SECOND FLOOR COLUMNS

38
DESCRIPTIONLENGTH (L x W x W x H)
L-SHAPE BEAM1200 x 300 x 150 x 500
QUANTITY
4
LOCATIONDESCRIPTION
L - SHAPE BEAM
QUANTITY
36
LOCATIONDESCRIPTION
L - SHAPE BEAM
QUANTITY
4
LOCATIONDESCRIPTION
L - SHAPE BEAM
QUANTITY
2
LOCATION LENGTH (L x W x W x H)
2700 x 300 x 150 x 500
LENGTH (L x W x W x H)
4200 x 300 x 150 x 500
LENGTH (L x W x W x H)
6000 x 300 x 150 x 500
1200
2700
4200
6000
500
150
150
500
150
150
500
150
150
500
150
150
B1B2B3B4
D-F1'/A-D2/A-D8/D-F8'/A2-8/F3-4/F6-7F 1'-3 / F 7-8' D1' - D2 / D8 - D8'GROUND & FIRST FLOORF 4 - 6 GROUND & FIRST FLOORGROUND & FIRST FLOORGROUND & FIRST FLOOR
DESCRIPTIONLENGTH (L x W x H)
SQUARE BEAM1200 x 300 x 300
QUANTITY
12
LOCATIONDESCRIPTIONLENGTH (L x W x H)
SQUARE BEAM2700 x 300 x 300
QUANTITY
96
LOCATIONDESCRIPTIONLENGTH (L x W x H)
SQUARE BEAM4200 x 300 x 300
QUANTITY
28
LOCATIONDESCRIPTIONLENGTH (L x W x H)
SQUARE BEAM4650 x 300 x 300
QUANTITY
2
LOCATION
1200
300
300
300
300
300
300
300
300
4650
300
4200
300
2700
B5B7B8
B6
B3'-4/B6-6'/D1'-D2/D8-D8'FOUNDATION & SECOND FLOORFOUNDATION & SECOND FLOORD-F1'/A-D2/A-D8/D-F8'/A2-8/F3-4/F6-7B4-5/ B5-6 /A6-B6/ B3'-3/ C3'-D3'/ B6'-C6'C6'-D6'FOUNDATION & SECOND FLOORF 1'-3 / F 7-8' / B2-3'/ B6'-8 /C2-3' / C6'-8D2-3' / D6'-8FOUNDATION & SECOND FLOORC4'-4
DESCRIPTIONLENGTH (L x W x H)
SQUARE BEAM5700 x 300 x 300
QUANTITY
2
LOCATIONDESCRIPTIONLENGTH (L x W x H)
SQUARE BEAM6000 x 300 x 300
QUANTITY
14
LOCATIONDESCRIPTIONLENGTH (L x W x H)
SQUARE BEAM7200 x 300 x 300
QUANTITY
8
LOCATION
300
300
300
300
300
300
7200
6000
5700
B9
B10B11
D4'-6C4-6 / E4-6 /F4 - 6E1'-1/ E6-8/ FOUNDATION & SECOND FLOORFOUNDATION & SECOND FLOORFOUNDATION & SECOND FLOOR
DESCRIPTIONLENGTH (L x W x H)
FLOOR SLAB3000 x 1000 x 200
QUANTITY
262
LOCATION
A2-A4-F4-F2, A6-A8-F8-F6, A4-A6-B6-B4
DESCRIPTIONLENGTH (L x W x H)
FLOOR SLAB3213 x 1000 x 200
QUANTITY
2
LOCATION
GROUND & FIRST E4-E4.5-F4.5-F4
DESCRIPTIONLENGTH (L x W x H)
FLOOR SLAB3462 x 1000 x 200
QUANTITY
2
LOCATION
B4-B4.5-C4.5-C4
DESCRIPTIONLENGTH (L x W x H)
FLOOR SLAB3000 x 1500 x 200
QUANTITY
12
LOCATION
D1-F1.5-F1.5-F1,D8-F9-F9-D8
3462
1000
3000
1500
3000
1000
200
200
200
3213
1000
200
B4-B6-F6-F4
F1
F2F3F4
BEAMS
L-SHAPE BEAM SOLID SQUARE BEAM
FLOOR SLABS

39
DESCRIPTIONLENGTH (L x W x H)
SOLID WALL2700 x 150 x 2900
QUANTITY
4
LOCATION
A2-B2,F3-F4,A8-B8,F6-F7
2700
2700
2900
150
DESCRIPTIONLENGTH (L x W x H)
SOLID WALL2700 x 150 x 2900 - (1200 X 1200)
QUANTITY
6
LOCATION
A2-A3,B2-C2,C2-D2,A7-A8,B8-C8.C8-D8
2700
2900
LENGTH (L x W x H)
2700 x 150 x 2900 - (2400 X 1200)
QUANTITY
8
LOCATION
2700
2900
A3-A4,A4-A5,D1-E1,E1-F1,A5-A6,A6-A7D9-E9,E9-F9
DESCRIPTION
SOLID WALL
1200
750
750
150
2400
150
150
900 12001200900
LENGTH (L x W x H)
SOLID WALL4200 x 150 x 2900
QUANTITY
2
LOCATION
F1-F3,F7-F9
DESCRIPTION
4200
150
2900
4200
150
LENGTH (L x W x H)
SOLID WALL4200 x 150 x 2900
QUANTITY
2
LOCATION
D1-D2,D8-D9
DESCRIPTION
2900
1200
150
1200
LENGTH (L x W x H)
SOLID WALL4200 x 150 x 2900 - (2400x1200)
QUANTITY
2
LOCATION
F1-F3,F7-F9
DESCRIPTION150
2900
4200
900
2400
900
DESCRIPTIONLENGTH (L x W x H)
SOLID WALL2700 x 150 x 2700
QUANTITY
35
LOCATION
A2-B2,F3-F4,A8-B8,F6-F7, B4-C4,C4-D4
2700
2700
2700
150
DESCRIPTIONLENGTH (L x W x H)
SOLID WALL2700 x 150 x 2700 - (1200 X 1200)
QUANTITY
12
LOCATION
A2-A3,B2-C2,C2-D2,A7-A8,B8-C8.C8-D8
2700
2700
LENGTH (L x W x H)
2700 x 150 x 2700 - (2400 X 1200)
QUANTITY
16
LOCATION
2700
2700
A3-A4,A4-A5,D1-E1,E1-F1,A5-A6,A6-A7D9-E9,E9-F9
DESCRIPTION
SOLID WALL
1200
750
750
150
2400
150
150
900 12001200900
LENGTH (L x W x H)
SOLID WALL4200 x 150 x 2700
QUANTITY
22
LOCATION
F1-F3,F7-F9,B2-B3,C2-C3,D2-D3
DESCRIPTION
4200
150
2700
150
4200
D4-E4,E4-F4,B6-C6,C6-D6,D6-E6,E6-F6A5-B5
LENGTH (L x W x H)
SOLID WALL1200 x 150 x 2700
QUANTITY
2
LOCATION
D1-D2.D8-D9
DESCRIPTION
2700
1200
150
1200
LENGTH (L x W x H)
SOLID WALL2700 x 150 x 2700 - (900X2100)
QUANTITY
12
LOCATION
B3-C3,C3-D3,B7-C7,V7-D7
DESCRIPTIONLENGTH (L x W x H)
SOLID WALL1200 x 150 x 2700 - (1600X2100)
QUANTITY
6
LOCATION
B4-B5,B5-B6
DESCRIPTIONLENGTH (L x W x H)
SOLID WALL1200 x 150 x 2700 - (900X2100)
QUANTITY
6
LOCATION
D3-D4,D6-D7
DESCRIPTION
2700
2700
50
1750
900
150
550
800
550
900
800
2700
2700
150
15090050
900
250
2700
1200
W1W2W3W4
W5W6
W7W8W9
W10
W11W12W13W14
WALLS
GROUND FLOOR (EXTERIOR) GROUND (INTERIOR) 1ST & 2ND FLOOR (INTERIOR +EXTERIOR)

40
LENGTH (L x W x H)
SOLID WALL4200 x 150 x 2700 - (2400x1200)
QUANTITY
4
LOCATION
F1-F3,F7-F9
DESCRIPTION
2700
4200
150
900
2400
900
DESCRIPTIONLENGTH (L x W x H)
DRY WALLING1150 x 150 x 2700
QUANTITY
6
LOCATION
A/B2-B2,A/B8-B8
1550
1150
2700
150
DESCRIPTIONLENGTH (L x W x H)
DRY WALLING1150 x 150 x 2700 - (900x2100)
QUANTITY
6
LOCATION
A/B3-B3,A/B7-B7
2700
2700
50
1750
900
150
900
DESCRIPTIONLENGTH (L x W x H)
DRY WALLING2700 x 150 x 2700 - (900x2100)
QUANTITY
6
LOCATION
E3-F3,E7-F7
15090050
900
200
2700
1150
DESCRIPTIONLENGTH (L x W x H)
DRY WALLING2700 x 150 x 2700
QUANTITY
30
LOCATION
A/B2-A/B3,B2-B3,E3-E4,F3-F4,E4-F4
2700
2700
2700
150
A/B7-A/B8,B7-B8,E6-E7,E6-F6, F6-F7
DESCRIPTIONLENGTH (L x W x H)
SINGLE LEAF WINDOW1200 x 150 x 1200
QUANTITY
18
LOCATION
A2-A3,B2-C2,C2-D2,A7-A8,B8-C8.C8-D8
DESCRIPTIONLENGTH (L x W x H)
DOUBLE LEAF WINDOW1200 x 150 x 2400
QUANTITY
30
LOCATION
A3-A4,A4-A5,D1-E1,E1-F1,A5-A6,A6-A7 D9-E9,E9-F9
150
150
850 200
850 200
DESCRIPTIONLENGTH (L x W x H)
SINGLE LEAF DOOR900 x 150 x 2100
QUANTITY
30
LOCATION
A/B3-B3,B3-C3,C3-D3,D3-D4,E3-F3
DESCRIPTIONLENGTH (L x W x H)
DOUBLE LEAF DOOR1600 x 150 x 2100
QUANTITY
6
LOCATION
B4-B5,B5-B6
900
900
800
50
100
1100
50
1100
50
50
1100
1200
2400
900
2100
1800
2100
A/B7-B7,B7-C7,C7-D7,D6-D7,E7-F7
800
800
W15
T1T2T3T4
D3
D1D2
D4
WALLS
GROUND (INTERIOR) 1ST & 2ND
FLOOR (INTERIOR +EXTERIOR)
TOILET POD DRY WALLING DOORS
ADDITIONAL COMPONENTS
WINDOWS

41
IBS SCORE

42
Elements Areas (m2) / Length (m)IBS FactorCoverage IBS Score
Part 1 : Structural ElementsPart 1 : Structural ElementsPart 1 : Structural ElementsPart 1 : Structural ElementsPart 1 : Structural Elements
GROUND FLOOR AREA
Precast beams + precast slabs + precast columns
FIRST FLOOR AREA
Precast beams + precast slabs + precast columns
SECOND FLOOR AREA
Precast beams + precast slabs + precast columns
ROOF AREA
Prefabricated timber roof truss
Part 1 Total
270m²
270m²
270m²
270m²
1082m²
1.0
1.0
1.0
1.0
270/ 1082
= 0.25
270/ 1082
= 0.25
270/ 1082
= 0.25
270/ 1082
= 0.25
1.0
50(0.25)(1.0)
=12.5
50(0.25)(1.0)
=12.5
50(0.25)(1.0)
=12.5
50(0.25)(1.0)
=12.5
50
Part 2 : Wall SystemsPart 2 : Wall SystemsPart 2 : Wall SystemsPart 2 : Wall SystemsPart 2 : Wall Systems
EXTERNAL WALL
GROUND FLOOR
Precast concrete panels
FIRST FLOOR
Precast concrete panels
SECOND FLOOR
Precast concrete panels
INTERNAL WALL
GROUND FLOOR
Dry Wall System
FIRST FLOOR
Dry Wall System
SECOND FLOOR
Dry Wall System
Part 2 Total
72m
72m
72m
270m
270m
270m
1026m
1.0
1.0
1.0
1.0
1.0
1.0
72/ 1026
= 0.07
72/ 1026
= 0.07
72/ 1026
= 0.07
270/ 1026
= 0.26
270/ 1026
= 0.26
270/ 1026
= 0.26
2.88
20(0.07)(1.0)
= 1.4
20(0.07)(1.0)
= 1.4
20(0.07)(1.0)
= 1.4
20(0.26)(1.0)
= 5.2
20(0.26)(1.0)
= 5.2
20(0.26)(1.0)
= 5.2
19.8

43
Part 3 : Other simplified construction solutions
Complies to MS1064
Part 3 : Other simplified construction solutions
Complies to MS1064
Part 3 : Other simplified construction solutions
Complies to MS1064
Part 3 : Other simplified construction solutions
Complies to MS1064
Part 3 : Other simplified construction solutions
Complies to MS1064
Beams (MS1064 Part 10)
Columns (MS1064 Part 10)
Slabs (MS 1064 Part 10)
Doors and Windows (MS 1064 Part 4)
Vertical repetition of structure
Part 3 total
60%
100%
60%
70%
100%
2
4
2
3
6
17
TOTAL IBS SCORE 86.8
Thus, CIDB had implemented the IBS Score in construction industry to measure the level of IBS usage in building and become part of the main monitor system of the IBS
construction industry. In the Budget 2005, the policies of the usage of IBS components in government building projects were increased from 30 percent currently to 50
percent commencing 2005. Housing developers who utilise IBS components exceeding 50 percent, will be given full exemption on levy imposed by CIDB. Government
requirement 70% of IBS components must be used in government projects. The two mandated policies cover for the housing (100% levy exemption with 50% IBS Score)
and government buildings (0.125% levy exemption with 70% IBS Score).
Since the IBS score for our apartment block is 86.8 > 70 , the levy will be exempted hypothetically.

44
1.Bhaddin Al-Naqshabandi, A study on the construction process (Precast
concrete, In-situ cast concrete, Shoring,
2.Underpinning) Retreived from https://www.slideshare.net/bhaddin/a-study-
on-the-construction-process-precast-concrete-insitu-cast-concrete-shoring-
underpinning on 3th October 2017
3.Retrieved from https://www.slideshare.net/shekhu001/precast-
construction on October 2nd 2017
4.Pujol, Products :Modular and  Industrial Construction : Columns, Retrieved
from http://eng.prefabricatspujol.com/products/modular-and-
industrialised-construction/health-center/columns.html on October 2nd
2017  
5.Hobbithouse Inc,  Glossary of Jointing Methods Retrieved from http://
www.hobbithouseinc.com/personal/woodpics/_joineryterms.htm on
October 2nd 2017
6.Retrieved from https://www.concretenetwork.com/concrete/
foundations.htm on October 1st 2017
7.Foundation Handbook, Construction Details, Retrieved from http://
foundationhandbook.ornl.gov/handbook/section4-1.shtml on October 1st
2017
8.http://preca.in/blog/9-uses-of-hollow-core-slab/
9.https://www.researchgate.net/publication/
225417520_Comparison_between_solid_and_hollow_reinforced_concrete_b
eams
10.http://www.yourhome.gov.au/materials/precast-concrete
11.http://research.iugaza.edu.ps/files/2142.PDF
12.IBSCentre. List of IBS Precast Concrete System Manufacturers [Online].
Available: http://ibsnet.econstruct.com.my/ibsnet_public/manufacturers/
index/page:4/manufact urer.keyword:Precast%20concrete%20system
13.A. Warszawski, Industrialized and Automated Building Systems. London: E &
FN Spon, 1999.
14.https://theconstructor.org/concrete/precast-concrete-process/6272/
REFERENCES
Tags