Gasværksvej26, DK 9000 Aalborg www.R-R-Consult.com www.LinkedIn.com/company/R&R-consult
[email protected]
CFD optimization of wet desulphurization process -PowerStation
Nordjyllandsværket–Courtesy Aalborg Forsyning
Considerable reduction of pump power and improved efficiency of the
desulphurization process was achieved based on our simulation.
One of our projects was to investigate the exhaust gas flow distribution in
the desulphurization plant. We found that, due to the complicated duct
structure for the exhaustflow, the flow distribution was very unevenly
distributed, and that resulted ina reduced efficiency for the
desulphurization process.
Wemodelledthecompleteexhaustflowandtheinjection,trackingand
evaporationoftheslurryflow.Basedonourworkandrecommendations,
changesweremadetotheexhaustflowpathandtheslurryinjection.The
resultofthiswasverysuccessfulwithanimproveddesulphurization
processandareductionofthepowerconsumptionfortheslurrypumps
by30percent.
Path lines from upstream and through desulphurization section –Colourrepresents speed
R&RConsultplayedakeyroleinmakingNordjyllandPowerStationthe
world’smostefficientcoal-firedCHPplant.TheplantisEurope’sfourth-
largestgeneratorofelectricityandownedbytheCityofAalborg.R&R
ConsulthavebeeninvolvedinseveralprojectsforNordjyllandsværket
concerningtheoptimizationofdifferentpartsoftheprocess.