REQUIREMENTS REGARDING INTERIORS -NEED TO CONVERT 850SQ.FT.TERRACE AREA IN TO 2 BEDROOMS,LIVING ROOM,BALCONY AND A TOILET WHICH WILL BE ACCESABLE FROM BEDROOM AS WELL FROM COMMON AREA. -ALL NECCESSORY ELECTRICAL WORK,POP WORK,PLUMBING,TILING,CONSTRUCTING DUMMY WALLS(PARTITIONS)FABRICATION WORK FOR COLOR COATED SHEETS COVERING POP (DIDN’T GET FSI TO CONSTUCT ANY EXTARA WORK IN RCC-NO RCC CEILING ,NO RCC WALLS) AND RENOVATION WORK FOR THE 2 BHK FLAT CONNECTING TERRACE FLAT. -FURNITURE DESIGNING,PAINTING,WALL PUNNING,WATERPROOFING WORK INCLUDED. CONDITIONS: -BRICK WORK WILL NOT BE ALLOW. -RCC WORK NOT PERMMITED -BUILDING ELEVATION SHOULD NOT BE CHANGE WHILE ENCLOSING THE TERRACE AREA. FINAL BUDGET REACHED 20,00000/-
FURNITURE LAYOUT
CONSTRUCTING WINDOW WINDOW AND OUTER GLASS PARTITION IN GUEST BEDROOM WINDOW AND OUTER GLASS PARTITION IN MASTER BEDROOM
COLOR COATED SHEET COVERING THE POP BEFORE AFTER BRICK WORK DONE FOR FILLING THE GAPS BETWEEN WALL AND ROOFING.
KADAPPA WORK KADAPPA FIXED ABOVE THE WALL TO FILL THE GAP BETWEEN WALL AND ROOFING.
KADAPPA WORK-DETAILING KADAPPA FIXED ABOVE THE WALL TO FILL THE GAP BETWEEN WALL AND ROOFING.’Z’BRACKETS OF 5MM THICKNESS HAVE BEEN USED FOR THE JOINERY. VERTICAL KADAPPA 5MM ‘Z’ BRACKETS BRICK WALL POP WINDOW FFL
KADAPPA WORK-DETAILING KADAPPA FIXED ABOVE THE WALL TO FILL THE GAP BETWEEN WALL AND ROOFING.’Z’BRACKETS OF 5MM THICKNESS HAVE BEEN USED FOR THE JOINERY.
P op work pictures
P op work pictures
PLUMBING WORK
PLUMBING WORK
PLUMBING WORK
TOILET
E lectrical layout
G uest bedroom-plan
S tudy table+wall hung book shelf
S tudy table+wall hung book shelf column
S ofa/bed
S ofa/bed
L iving room-plan
sofa
C enter table
LIVING ROOM
LIVING ROOM
LIVING ROOM
LIVING ROOM
KITCHEN Breakfast counter accessible from family room