Coal Handling System

24,617 views 32 slides Aug 21, 2016
Slide 1
Slide 1 of 32
Slide 1
1
Slide 2
2
Slide 3
3
Slide 4
4
Slide 5
5
Slide 6
6
Slide 7
7
Slide 8
8
Slide 9
9
Slide 10
10
Slide 11
11
Slide 12
12
Slide 13
13
Slide 14
14
Slide 15
15
Slide 16
16
Slide 17
17
Slide 18
18
Slide 19
19
Slide 20
20
Slide 21
21
Slide 22
22
Slide 23
23
Slide 24
24
Slide 25
25
Slide 26
26
Slide 27
27
Slide 28
28
Slide 29
29
Slide 30
30
Slide 31
31
Slide 32
32

About This Presentation

importance of coal handling system, necessity and requirement of coal handling system, various transportation means, methods and equipment's, advantages and disadvantages of various methods, coal unloading videos.


Slide Content

COAL HANDLING SYSTEM Shaikh Saif

Necessity of Coal Handling System A 600MW Power Plant handles about 7200 tons of coals per day. Coal handlings are to be flexible, reliable & capable of handling large quantities in less time than even before. Coal plays a vital role in electricity generation worldwide. Coal-fired power plants currently fuel 41% of global electricity. Shaikh Saif

Requirement of Good Coal Handling Plant It should have minimum maintenance It should be simple. It should be reliable Shaikh Saif

Coal Handling System Coal Delivery Unloading Transfer Outdoor Storage Covered Storage Inplant Handling Weighing Furnace Firing Preparation / Weighing Shaikh Saif

Out-Plant Handling.(Coal Delivery) Out plant handling means transfer of Coal from mine or port to storage of coal at plant site. Transportation by Rail: 4000 to 13000 tons per trip. Transportation by Ships: 45 million tonnes/year Transportation by Roads: Trucks etc. Transportation by belt & conveyors Transportation of Coal by Pipe line. Shaikh Saif

Unload of Coal at Site Unload from Rail cars Unloading from Ships Unloading equipment. Self unloading ship. Unloading from trucks (lifting trucks ) Shaikh Saif

Rail Car Unloading Rail car unloading featuring bottom dump by unloading bridge. Rail car unloading by means of Rotary Drum Shaikh Saif

Bottom Dump Unloading Shaikh Saif

Ship Unloading System Self Unloading Ships Unloading Equipment's. Shaikh Saif

Self Unloading Ship Shaikh Saif

Unloading Equipment's Shaikh Saif

Transportation by pipeline Shaikh Saif

Transportation through belt & conveyors Transfer of coal by rope, belt & conveyor is also used if the distance between the mines & power station is less than 10 km Conveying capacity was 600 tonnes per hour. The line was 270 meters long, with a vertical rise of 23 meters. It eliminated 115,000 truck journeys. Shaikh Saif

Coal Weighing All of our train weighing systems involves "Load Cell" technology which is the only genuinely recognized method of long term accurate & reliable train weighing & uses the exact principal as weighbridges, truck scales & every other general scale is based upon .(onboard coal weighing) Shaikh Saif

Coal Storage Storage of coal is undesirable because it costs more as there is, Risk of spontaneous combustion. Weathering. Possibility of loss deterioration during storage. Interest on capital cost of coal lying dormant. Cost of protecting the stored coal from deteriorating & so on. Shaikh Saif

Purpose of Storage of Coal To store the coal for a period of 30 – 80 days so that plant is never required to be shut-down. Storage of coal allows the purchaser to take the advantage of seasonal market fluctuation in prices of coal. Shaikh Saif

Outdoor Storage (dead storage) The coal is usually kept on ground in the form of pile exposed to outside weather. The coal is required to be protected from deterioration & weathering This is a long term storage i.e. 10% of annual consumption. Shaikh Saif

Closed or Live Storage In the closed or live storage the coal is stored for one or two days requirement of the power plant. This storage is used for the purpose of supplying the coal to the combustion equipment with negligible handling T he coal is usually stored in the vertical cylinder bunkers or coal bins. Shaikh Saif

Inplant Coal Handling The In-Plant coal handling system deals with feeding of coal from live storage to the furnace. It includes various equipment's for transfer of coal like belt conveyor, screw conveyor etc. & the equipment needed to weigh the quantity of coal for feed. In case of pulverized coal firing system, it requires large no. of equipment’s like chutes, pulverized mills, feeders, weighing machine, hoppers & automatic scales. Shaikh Saif

Points to Remember. Simple & sound, requiring minimum operations & transportation. No double handling of coal in plant. Handling unit should be centralized to facilitate inspection & maintenance. Electric motors can be used as driver of mechanism. Working parts should be enclosed to avoid abrasion & corrosion. System should be able to supply required quantity of coal as per demand. Shaikh Saif

Coal Preparation Shaikh Saif

Crushing of Coal Crushers are used to reduce the coal to optimum size. It is crushed into pieces of 25-30mm for stoker firing and 10-20mm for pulverized coal firing. Shaikh Saif

Vibrating Separator Size of vibrating separator is fitted after crusher to screen the coal crushed below set size. Oversized coal is returned to crusher for further proper crushing. Shaikh Saif

Transfer of Coal. Different equipment’s of coal transfer. Belt conveyors. Screw conveyors. Bucket elevators. Grab bucket elevators. Flight conveyors or scrapers. Skip hoist. Shaikh Saif

Belt Conveyors It consist of endless belt of suitable material running over pair of end drums supported at regular interval by series of rollers(idler). Max Inclination: 20degree. Running Speed: 400-500 RPM. Transport Capacity: 50-100ton/hour over long distance Shaikh Saif

Belt Conveyors (cont.) Advantages Low cost & power consumption. Smooth & clean operation. Cheap maintenance. Controlled rate of coal transfer. Shaikh Saif

Screw Conveyors It is used for shorter distance(30m). Totally enclosed from atmosphere. Coal dust can also be transferred easily. Diameter: 15-50cm. Speed: 70-120 rpm. Transfer Capacity: 100tons/hour. Shaikh Saif

Screw conveyors Shaikh Saif Advantages Cheap Requires small space, simple & tight. Dust tight. Disadvantages High power consumption per ton of coal transfer Wear and tear of screw is high. Shorter life

Bucket Elevator Coal is lifted vertical or near vertical direction. It carries the buckets fixed to a chain. B uckets are loaded with coal at bottom & discharges at the top. Shaikh Saif Limitation: The lift of coal is limited to about 30m. Inclination is limited to 60 degree with horizontal Transfer Capacity: 60 tons/hour.

Grab Bucket Elevator It lifts & transfer coal on a single rail or track from one point to the other. It can be used with crane or tower. Transfer Capacity: 50 tons/hour Advantages: Requires less power for operation and minimum maintenance. Used when other arrangements are not possible. Lesser operating cost. Disadvantages: Initial cost is high. Shaikh Saif

Flight Conveyor or Scrapers It is generally used for transfer of coal when filling of no. of storage bin under the conveyor is required. The coal is discharged in the bottom of trough. Transfer Capacity: 10-100 tons/hour. Advantage: Low capital cost. It can transfer both coal & ash. It can vary easily the rate of coal discharge. Disadvantages: High energy consumption & maintenance cost. High wear and tear due to dragging action. Shaikh Saif

Shaikh Saif