Issue Date: _______________ Permit No: ____________
Permit Requested By: __________________ Company Name: ________________ Permit Accepted By: __________________ Company Name: ________________
Validity From: __________ To: _...
Issue Date: _______________ Permit No: ____________
Permit Requested By: __________________ Company Name: ________________ Permit Accepted By: __________________ Company Name: ________________
Validity From: __________ To: __________
1. Job Location: _____________________________________________________________
2. Job Description: __________________________________________________________
________________________________________________________________________________________________________________________________________________
3 Tools & Materials to be used:
❑Explosive Device ❑Sandblaster ❑Jack hammers
❑Hand Tools ❑Drill ❑Jack hammers
❑Powered Excavation Equipment ❑Powered cutting Saw ❑Ladder/Scaffolding
❑Air Heater ❑LPG Gas ❑Others
4- Details of potential hazards:
❑Falling from height ❑ Material Fall down ❑Skin Exposures
❑Electrocuted ❑ Slip and trip ❑Burn out due to fire/acid etc.
❑Exposure to Eye ❑ Inhalation of any Gas ❑Breathing Problem ❑Others
5- Details of precaution need to be taken:
❑Caution Signage to be placed ❑Proper fixture an erection of Scaffolding/Ladder
❑Excavated Area fencing ❑Electrical Isolation
❑Fire water supply isolation ❑Fire water tanker to be provided
❑Fire Extinguishers to be provided ❑Exhaust fan to be provided
❑Informed security Et Help Desk ❑Other
6- Details of protective equipment to be used or worn:
10- Signature of handover of responsibility between shifts, if needed.
11- Declaration by competent person in -charge of work that work is completed.
12- Signature of Maintenance / works representative ensuring that the work is
completed, site has been checked and that equipment and place may be reinstated / left
Safely isolated.
13- Signature of person issuing the permit / HSE representative which confirms that the
Site has been left in safe condition and the permit is cancelled.
14- Signature of the management representative signing off the permit to work.
REMARKS:-
Size: 559.57 KB
Language: en
Added: Apr 24, 2023
Slides: 2 pages
Slide Content
COLD WORK PERMIT
Page 1 of 2 Form # HSEQ- CWP (Rev 2 – Mar 23)
Issue Date: _______________ Permit No: ____________
Permit Requested By: __________________ Company Name: ________________
Permit Accepted By: __________________ Company Name: ________________
Validity From: __________ To: __________
1. Job Location: _____________________________________________________________
2. Job Description: __________________________________________________________
________________________________________________________________________
________________________________________________________________________
3 Tools & Materials to be used:
❑Falling from height ❑ Material Fall down ❑Skin Exposures
❑Electrocuted ❑ Slip and trip ❑Burn out due to fire/acid etc.
❑Exposure to Eye ❑ Inhalation of any Gas ❑Breathing Problem ❑Others
5- Details of precaution need to be taken:
❑Caution Signage to be placed ❑Proper fixture an erection of Scaffolding/Ladder
❑Excavated Area fencing ❑Electrical Isolation
❑Fire water supply isolation ❑Fire water tanker to be provided
❑Fire Extinguishers to be provided ❑Exhaust fan to be provided
❑Informed security Et Help Desk ❑Other
6- Details of protective equipment to be used or worn:
COLD WORK PERMIT
Page 2 of 2 Form # HSEQ- CWP (Rev 2 – Mar 23)
10- Signature of handover of responsibility between shifts, if needed.
11- Declaration by competent person in -charge of work that work is completed.
12- Signature of Maintenance / works representative ensuring that the work is
completed, site has been checked and that equipment and place may be reinstated / left
Safely isolated.
13- Signature of person issuing the permit / HSE representative which confirms that the
Site has been left in safe condition and the permit is cancelled.
14- Signature of the management representative signing off the permit to work.