About This Presentation

Solar powerplant all cost.


Slide Content

Costing of Solar Plant M r. Rabin Roy Capacity Building Program on Rooftop Solar PV

Introduction Solar Plant is defined by kWp Electrical Unit is kW Translation of kWp to kW Standard Test Condition A. 1000 W/m^2 B. Temp: 25 Degree C. AM: 1.5

Latitude and Longitude Contour /Area Roof Type Roof Strength Access to Roof Any Shadow Any other constrain to use the roof Access Road Inventory Condition Final decision of the client Site Assessment

Project Cost – BOQ Cost of site survey, report preparation – Preoperative Cost Cost of Design Cost of Materials Cost of Transportation Cost of Installation and Commissioning Cost of O & M Cost of Annual Maintenance Cost of New Replacement Cost of Fund Miscellaneous cost

Cost % of a Typical Project Sl No Heads of the Cost Typical % of Total cost in 100 kWp Solar Plant 1 Cost of site survey, report preparation – Preoperative Cost 1.0%     2 Cost of Design 2.0%     3 Cost of Materials 60.0%     4 Cost of Transportation 1.0%     5 Cost of Installation and Commissioning 6.0%     6 Cost of O & M 4.0%     7 Cost of Annual Maintenance for 5 years 5.0%     8 Cost of New Replacement for 25 Years 15.0%     9 Cost of Fund 3.9%     10 Miscellaneous cost 2.0%    

BOQ and Cost % Project size 100 kWp BOQ %   Solar P 55.83%   Inverter in kWp 13.33%   Structure 13.33%   AJB 0.50%   ACDB (Inverter Interfacing Panel) 0.50%   ACDB (Grid Interfacing Panel) 1.67%   Earthing chemical 0.50%   Pit Cover 0.17%   GI Strip 0.50%   Earthing Electrode 0.33%   Lightening Arrestor 0.50%   DC cable from Solar Panel to AJB 0.83%   DC cable from AJB to Inverter 0.17%   AC cable from Inverter to ACDB 0.83%   AC cable from ACDB to GIP 2.50%   MC4 Connector Pair (Male+Female) 0.17%   Branch Connector Pair (Male+Female) 0.08%   Weather Monitoring Station 1.67%   PC With Data Logging Arrangement 3.33%   Energy Meter with CT arrangement 0.27%   Water Cleaning System 2.58%   Fire Bucket 0.07%   Holding Stands For Fire Buckets 0.07%   Fire Extinguisher 0.17%   Company Sinage 0.05%   Safety Signage 0.05%   Total cost of materials 100.00%  