About This Presentation
Solar powerplant all cost.
Size: 952.46 KB
Language: en
Added: Oct 10, 2025
Slides: 7 pages
Slide Content
Costing of Solar Plant M r. Rabin Roy Capacity Building Program on Rooftop Solar PV
Introduction Solar Plant is defined by kWp Electrical Unit is kW Translation of kWp to kW Standard Test Condition A. 1000 W/m^2 B. Temp: 25 Degree C. AM: 1.5
Latitude and Longitude Contour /Area Roof Type Roof Strength Access to Roof Any Shadow Any other constrain to use the roof Access Road Inventory Condition Final decision of the client Site Assessment
Project Cost – BOQ Cost of site survey, report preparation – Preoperative Cost Cost of Design Cost of Materials Cost of Transportation Cost of Installation and Commissioning Cost of O & M Cost of Annual Maintenance Cost of New Replacement Cost of Fund Miscellaneous cost
Cost % of a Typical Project Sl No Heads of the Cost Typical % of Total cost in 100 kWp Solar Plant 1 Cost of site survey, report preparation – Preoperative Cost 1.0% 2 Cost of Design 2.0% 3 Cost of Materials 60.0% 4 Cost of Transportation 1.0% 5 Cost of Installation and Commissioning 6.0% 6 Cost of O & M 4.0% 7 Cost of Annual Maintenance for 5 years 5.0% 8 Cost of New Replacement for 25 Years 15.0% 9 Cost of Fund 3.9% 10 Miscellaneous cost 2.0%
BOQ and Cost % Project size 100 kWp BOQ % Solar P 55.83% Inverter in kWp 13.33% Structure 13.33% AJB 0.50% ACDB (Inverter Interfacing Panel) 0.50% ACDB (Grid Interfacing Panel) 1.67% Earthing chemical 0.50% Pit Cover 0.17% GI Strip 0.50% Earthing Electrode 0.33% Lightening Arrestor 0.50% DC cable from Solar Panel to AJB 0.83% DC cable from AJB to Inverter 0.17% AC cable from Inverter to ACDB 0.83% AC cable from ACDB to GIP 2.50% MC4 Connector Pair (Male+Female) 0.17% Branch Connector Pair (Male+Female) 0.08% Weather Monitoring Station 1.67% PC With Data Logging Arrangement 3.33% Energy Meter with CT arrangement 0.27% Water Cleaning System 2.58% Fire Bucket 0.07% Holding Stands For Fire Buckets 0.07% Fire Extinguisher 0.17% Company Sinage 0.05% Safety Signage 0.05% Total cost of materials 100.00%