DEFECT REDUCTION PROJECT TRUE FAILURES ( Process Issues ) Customer: Tejas MODEL : RAC Vaibhav Srivastava
Project Charter Elements Elements Role Charter Case To reduce the failure occurring at Testing stage, aiming to get improved yield in Model RAC Problem / Opportunity Statement Failure at 19% rate found at Testing stages of RAC V2.9 cards in the month of February. Out of total defects 60% defects are related with soldering issue. Thus, defects are creating huge pending in TRC area impacting output, decreasing yield, and increasing wastage. Goals / Projected Benefits To reduce the soldering defects generated in SMT/MI during production to increase the yield and reduction in process waste. Goal Statement The goal of this project is define, measure, analyze, and minimize the process issue that contributes up to 60% out of total defects.
Project Charter Elements Elements Role Project Scope Successful execution of this project will lead to improved yield, less wastage, minimized rejection inventory, will save the cost spent on rework. Project Plan Pls refer Slide No. 4 for Project Plan Team Structure The fundamental departments of the project follows as PM – Mr. Rahul/Mr. Anshul Production – Parminder Quality – Amit/Devendra Quality - Vaibhav Testing – Govind TRC – Rahul Production - Lalit(MI)
Weeks WK 01 Dates 8 Apr’24 9 Apr’24 10 Apr’24 Define Measure Analyze Improve Control Milestone Reviews M1 Close Define Phase M2 Close Measure Phase M3 Close Analyze Phase M4 Close Improve Phase M5 Close Control Phase M1 M2 M3 M4 M5
DMAIC Project Plan
DMAIC Define Define: Part Issues 38 Programming Issues 96 Process Issues 144 Total Issues 278