DHAKA- ASHULIA- ELEVATED-EXPRESSWAY .pdf

MinhajulIslammahin 0 views 28 slides Oct 09, 2025
Slide 1
Slide 1 of 28
Slide 1
1
Slide 2
2
Slide 3
3
Slide 4
4
Slide 5
5
Slide 6
6
Slide 7
7
Slide 8
8
Slide 9
9
Slide 10
10
Slide 11
11
Slide 12
12
Slide 13
13
Slide 14
14
Slide 15
15
Slide 16
16
Slide 17
17
Slide 18
18
Slide 19
19
Slide 20
20
Slide 21
21
Slide 22
22
Slide 23
23
Slide 24
24
Slide 25
25
Slide 26
26
Slide 27
27
Slide 28
28

About This Presentation

It's report


Slide Content

DHAKA-ASHULIA ELEVATED
EXPRESSWAY
PRESENTED TO :
COURSE INSTRUCTOR-Dr. Md. FoisalHaque
Associate Professor, IUBAT

2
Group Members
Name Student ID
Md. Fahim Shahriar Shimanta21306107
Md. Faysal Ahamed Dewan
Refati
21306109
Farjana Akter 21306110
Nour Alam 22106005
Ahmed Jubayer Refat 22106006
Atol Nag 22106007
Md. Minhajul Islam Mahin22106008

Table of content
3 Presentation title 20XX
•1.Introduction and Innovative Safety Analysis Framework.
•2.Overview of Post-Tensioned Tendon Girders and Cost Analysis.
•3.Identified Safety Challenges.
•4.Evidence-Based Solutions.
•5. Case Studies and Lessons Learned.
•6.Conclusion and Recommendations.

PROJECT OBJECTIVES
4 Presentation title 20XX
•Enhance connectivity between Dhaka and Ashulia
•Reduce travel time and traffic congestion
•Stimulate economic growth

PROJECT OVERVIEW
5 Presentation title 20XX

CONSTRUCTION MATERIALS AND METHODS
6 Presentation title 20XX
Materials
1.High-strength
concrete
2.Reinforcing
steel
3.Bitumen
4. Post-tensioning
tendons
5. Geotextiles
Methods
•Pile foundation
•Segmental
construction
•Precast concrete
elements

IMPACT ON LOCAL
COMMUNITY

7 Presentation title 20XX
•Reduced travel time by 40%.
•Improved connectivity for
Ashulia and Dhaka residents.
•Enhanced economic activity
through better logistics.

SAFETY CHALLENGES
•Height-related risks
like falls of objects
•Heavy machinery operation:
Risks associated with cranes,
excavators, etc.
•Traffic management:
Maintaining traffic flow during
construction
8 Presentation title 20XX

SAFETY MEASURES
•Traffic
management plan:
Lane closures,
detours, traffic
signal adjustments
•Heavy machinery
safety: Operator
training, equipment
maintenance, safe
operating
procedures
•Fall protection
systems: Safety nets,
harnesses
9 Presentation title 20XX

10
SAFETY MEASURES
•Worker injuries due to fall hazards
•Material failures

11

POST TENSIONED
TENDONS
Function
Materials
•High-tensile steel strands

INNOVATIVE TECHNOLOGIES
•3D Modeling & BIM: Design, planning, and project management
•Precast Concrete Technology: Improved quality control, faster construction
•Advanced Construction Equipment: Self-erecting scaffolding, tunnel boring
machines

ENVIRONMENTAL IMPACT
• Air pollution
•Noise Pollution
•Waste disposal

COST BREAKDOWN

CONSTRUCTION TIMELINE

QUALITY
ASSURANCE
• Routine inspections to ensure compliance with
standards.
•Testing of materials before use
•Certification of completed girder segments.

KEY RISKS AND MITIGATION

CONSTRUCTION ETHICS

CASE STUDIES
•Bang Na Expressway, Thailand
•Mumbai Metro Elevated Corridor,
India (On advanced post-tensioning
techniques)
•Golden Gate Bridge, USA
(On the importance of quality control)

LESSONS LEARNED

RECOMMENDATIONS

•Safety challenges can be mitigated with proper strategies
CONCLUSION
•The Dhaka- Ashulia Elevated Expressway demonstrates
innovative engineering.
•Commitment to quality ensures long-term project
success.

REFERENCES
Dhaka- Ashulia Pre-Feasibility Report; https://shorturl.at/gjToJ
Feasibility Study - Dhaka
Dhaka-Ashulia elevated expressway's plans modified, project
costs rise ;https://shorturl.at/LBJuO
OSHA Safety Guidelines for Elevated Construction.