Jaipur Development Authority has taken up an ambitious project of
Rejuvenation of Historical Dravyawati River in Jaipur. The river had gradually
converted into a wastewater nullah passing through the city of Jaipur and had
started to be known as Amanishah Nallah. It is being restored to its old pris...


Slide Content

JAIPUR ENGINEERING COLLEGE & RESEARCH CENTRE
(JECRC)

DRAVYAVATI =
RIVER-PROJECT

Asour THE PROJECT

DRAVYAVATIRIVER IS A
MAJOR SOUTH-FLOWING
RIVER IN RAJASTHAN. IT
ORIGINATES IN ON THE
WESTERN SLOPE OF
AMBER HILLS AND FLOWS
THROUGH JAIPUR CITY,
NORTH TO SOUTH OVER A
LENGTH OF 57.5 KM,

SIGNIFICANT SOURCE OF
WATER TO THE CITY.

WIDENING OF BAMBALA HIGH
LEVEL BRIDGE ON TONK ROAD,
JAIPUR

BRIEF DETAILS OF

PROJECT:

* PROJECT COST - 21.00 CR

® BRIDGE LENGTH - 134.00 M

+ EXISTING WIDTH OF BRIDGE -
26.00 M

+ TOTAL WIDENING - 11.00 M
ON BOTH SIDES.

* WIDENING OF CARRIAGE
WAY - 9.00M

+ LENGTH OF VIADUCT -
127.00M

+ SPAN - 5 NOS. @ 25.40M

+ TOTAL NO. OF PIERS - 10NOS.

+ PERIOD - 12 MONTHS

CONSTRUCTION OF FOUR-LANE
ROAD OVER BRIDGE

© NECESSITY

+ BUDGET ALLOCATION
+ TECHNICAL FEATURES
+ EXECUTION OF WORK
+ PRESENT PROGRESS

© HINDRANCE

HAWA SARAK
ELEVATED ROAD

PHYSICAL PROGRESS AS OF x

22.06.2017
+ 568 NO. OF PILES CAST OUT OF 623 q
+ 73 NO. OF PILE CAPS COMPLETED OUT OF 103

« 48 PIER CAST OUT OF 111.

FINANCIAL PROGRESS:

TILL 01.04.2018 THE FINANCIAL PROGRESS STANDS AT
RS. 42.00 CR. AFTER COMPLETION OF THIS PROJECT, AN
ADDITIONAL CORRIDOR WILL BE AVAILABLE IN THE
EAST-WEST DIRECTION IN WHICH PRESENTLY THERE
ARE VERY FEW ROADS. THE DEVELOPMENT OF THIS
CORRIDOR IS EXPECTED TO REDUCE TRAFFIC
CONGESTION IN THIS AREA.

JAHOTA ROB
DESCRIPTION:

.

.

THE ESTIMATED COST OF THIS WORK - IS RS.
61.00 CR.

DURATION OF THE PROJECT - 15 MONTHS.
ST. DT. OF COMMENCEMENT - 19.05.2016

ST. DT. OF COMPLETION - 18.11.2017

THE TOTAL LENGTH OF ROB - 785.18M
TOTAL WIDTH OF ROB -16.80M

LENGTH OF VIADUCT - 406.28M

SERVICE ROAD - 5.50M

WIDE ON BOTH SIDES OF THE BRIDGE.
TOTAL SPAN - 16 NO.

TOTAL PIER - 17NO.

LENGTH OF R.E WALL - 189,20M

TOWARDS JAHOTA SIDE AND 189.70M
TOWARDS RAMPURA SIDE LIMITED HEIGHT
SUBWAY - 7M X 2.7M

| SITAPURA IND. AREA |
Gaal "(2000 ACRES )

NGTH OF RO
IE WAY (ROW) =
PROJECT COST = 86.60 CRORI

DER AMOUNT = 77.27 CRORE

SED WORK

EXISTING 6-LANE RO/

H RCC MEDIAN WITH
111. IN 12
‘DIC

IN, THE CONSTRUCTION OF A

& COMMUNIC

WORK MAY

RK COMPLETED

[ SITAPURA IND. AREA
(2000 ACRES )
— =

=.