DULANG-A
Location
No. of item do not
meet code check
requirement
Remarks
Item
description
No.
Topside
Upper Deck Member UC >1.0 1 Primary Beam at west of Upper Deck. The member UC >1.0 due
to PAR loads. Strengthening is required.
Row B Member UC >1.0 1 Diagonal Truss member at Row B below skid beam. The member
UC > 1.0 due to KM-1 rig mud package weight. Strengthening is
required.
Substructure
EL (+) 3.658m Member UC >1.0 1 The members UC >1.0 due to updated metocean data
Reduction of Corrosion Allowance
EL (+) 3.658m Member UC >1.0 1 The members UC >1.0 due to updated metocean data
Reduction of Corrosion Allowance
Summary of Analysis Findings:-
Member
Member
Group
Max UC
Load
Case
Member
Section
Location Remarks
Strengthening with
Channel section
Strengthening
with built –up tee
section
Upper Deck
9513-9512 G0 1.262
<1.19>
OP13 W36x135 Primary beam at
west of Upper
Deck.
Mitigation required
as UC exceeded
code check due to
the PAR pin load
9513-9000 K2 1.461
<1.35>
OP1860.96 Ø cm
x 3.175 cm
Diagonal Truss
member at Row B
below skid beam.
Mitigation required
as UC exceeded
code check due to
the PAR pin load
TOPSIDE
Dulang A
Note: < > denotes refined UC
Length = 5m
Beam : W36 x 135 - Strengthened with built –up tee section
Dulang A
Built-up
Tee
Added
Length = 3m
Tubular : 609.6mm x 31.75mm w.t - Strengthened with Channel section
Dulang A
Channels
Added
Member
Member
Group Max UC
Load
Case Member Section Location Remarks
Reduction of
Corrosion
Allowance
*22- 20 E33 1.001 OP15 26.705 Ø cm x
0.627cm
Caisson Stub
EL (+) 3.658
Mitigation is
required.
Corrosion
allowance reduced
from 6 to 3mm.
New UC = 0.67
*113- 124 ET2 1.130 OP19 21.907 Ø cm x
0.952cm
Electrical Tube
Stub
EL (+) 3.658
Mitigation is
required.
Corrosion
allowance reduced
from 6 to 3mm.
New UC = 0.85
SUBSTRUCTURE
MEMBER U.C
Dulang A
DULANG-B
Location
No. of item do not
meet code check
requirement
Remarks
Item
description
No.
Topside
Production Deck Row L-6 Member UC >1.0 1 The members UC >1.0 due to PAR loads and KM-1 rig mud
package weight.
Production Roof Deck at
EL. (+) 26500mm
Member UC>1.0 6
Member Vertical
Deflection >
Allowable
1
The member UC >1.0 due to PAR loads and KM-1 rig mud
package weight.
Substructure
Seadeck at EL. (+) 3.658mMember UC>1.0 2 The members UC >1.0 due to updated metocean data and new
full dynamic inertia load.
All the members are located at splash zone with 3mm and 6mm
corrosion allowance considered in the analysis.
Joint UC>1.0 4
Row A Member UC>1.0 1
Row B Member UC>1.0 2
Row 2 Member UC>1.0 2
Row 3 Member UC>1.0 2
Pile & Foundation Pile UC>1.0 NilThe foundation FOS (1.96) < 2.0 for operating condition due to
updated metocean data and new full dynamic inertia load.
Fdn FOS<2.0
Fdn FOS<1.5
1
Nil
Summary of Analysis Findings:-
Member
Member
Group
Max
UC
Load
Case
Member
Section
Location Remarks
Strengthening
with skid beam
extension
Strengthening
with built –up
tee section
8316-9834 M3C 7.70CS02 W24x68
Cantilever beam at row
L-6, west of Production
Roof Deck.
The bending
stress in major
axis of the
members do not
meet code check
requirement.
Mitigation is
required.
9834-9831 M3C 6.99OP19 W24x68
Cantilever beam at row
L-6, west of Production
Roof Deck.
8315-9830 M3A 1.67OP14 W24x94
Cantilever beam at row
L-6, east of Production
Roof Deck.
8329-9835 M3C 1.48OP16 W24x68
Cantilever beam in
between row L-5 & L-6,
west of Production Roof
Deck.
8314-982Y M3A 1.60 OP13 W24x94
Cantilever beam at row
L-5, east of Production
Roof Deck.
9832-9836 M3D 2.92OP16 W18x35
Secondary beam at west
of Production Roof
Deck.
9836-9831 M3D 11.95OP11 W18x35
Secondary beam at west
of Production Roof
Deck.
TOPSIDE
Dulang B
1
1
1
1
1
1
1 1
1 1
This W24x94 to
be replaced with
beam same size
as skid beam.
Beam : W24 x 117 & W24x68 - Strengthened with built –up tee section
Section 1-1
Dulang B
Built-up
Tee
Added
JACKET
LINK
Dulang B
DULANG-C
Location
No. of item do not
meet code check
requirement
Remarks
Item
description
No.
Topside
Upper Deck (9030-9034) Member UC >1.0 1 Primary Beam at west of Upper Deck. The member UC >1.0 due
to PAR loads. Strengthening is required.
Row B (8001-9030) Member UC >1.0 1 Diagonal Truss member at Row B below skid beam. The member
UC > 1.0 due to PAR loads. Strengthening is required.
Substructure
Row 1 (2000-1220) Member UC >1.0 1 The members UC >1.0 due to updated metocean data
Direction Sectors wave is considered for STORM
CONDITION only
Row 1 (3251-4000) Member UC >1.0 1 The members UC >1.0 due to updated metocean data
Direction Sectors wave is considered for STORM
CONDITION only
Row 1 (3251-4900) Member UC >1.0 1 The members UC >1.0 due to updated metocean data
Direction Sectors wave is considered for STORM
CONDITION only
Summary of Analysis Findings:-
TOPSIDE
Member
Member
Group
Max UC
Load
Case
Member
Section
Location Remarks
Strengthening with
Channel section
Strengthening with
built –up tee section
9030-9034 W33 1.280
<1.24>
OP13 W36x135 Primary beam
at west of
Upper Deck.
Mitigation required as
UC exceeded code
check due to the PAR
pin load
8001-9030 T01 1.264
<1.15>
OP1860.96 Ø cm x
3.175 cm
Diagonal
Truss member
at Row B
below skid
beam.
Mitigation required as
UC exceeded code
check due to the PAR
pin load
Dulang C
Note: < > denotes refined UC
Length = 5m
Beam : W36 x 135 - Strengthened with built –up tee section
Dulang C
Built-up
Tee Added
Length = 3m
Tubular : 609.6mm x 31.75mm w.t - Strengthened with Channel section
Dulang C
Channels
Added
SUBSTRUCTURE
Member
Member
Group
Max UC
Load
Case
Member
Section
Location Remarks
Direction Sectors wave is
considered for STORM
CONDITION only
2000-1220 Y02 1.027 ST1466.040 Ø cm
x 2.54 cm
Diagonal member at Row 1
between EL. (-)48158mm
and EL. (-) 77500mm.
Mitigation is
required
To be mitigated
New UC = 0.75
3251-4000 Y12 1.017 ST14 45.72 Ø cm
x 2.54 cm
Diagonal member at Row 1
between EL. (-)9144mm
and EL. (-) 27127mm.
Mitigation is
required
To be mitigated
New UC = 0.76
3251-4900 Y15 1.001 ST07 45.72 Ø cm
x 2.54 cm
Diagonal member at Row 1
between EL. (-)9144mm
and EL. (-) 27127mm.
Mitigation is
required
To be mitigated
New UC = 0.94
MEMBER U.C
Dulang C
Row 1
Dulang C
DULANG-D
Summary of Analysis Findings:-
Location
No. of item do not
meet code check
requirement
Remarks
Item descriptionNo.
Topside
Upper Deck and Row B Member UC >1.0 1 The members UC >1.0 due to PAR loads and KM-1 rig mud
package weight. Strengthening is required for this member.
Row B Member UC >1.0 1 The members UC >1.0 due to PAR loads and KM-1 rig mud
package weight. Strengthening is required for this member.
Substructure
Pile & Foundation Pile UC>1.0 NilThere are two foundations with FOS < 2.0 (A1=1.91 & B1=1.94) for
operating condition with rig load. Ageing effect study for pile ultimate
capacity is to be carried out. A 5% increment in the pile capacity is
needed to achieve FOS of 2.0.
Fdn FOS<2.0
Fdn FOS<1.5
2
Nil
Member
Member
Group
Max UC
Load
Case
Member
Section
Location Remarks
Strengthening with
channel section
Strengthening
with built –up tee
section
Upper Deck
8001-9030 T01
1.284
<1.104>
OP18
60.96 Ø cm x
3.175 cm
Truss member at
Row B below skid
beam.
Mitigation required
as UC exceeded
code check criteria
due to PAR pin load
9030-9034 W33
1.254
<1.220>
OP13 W36x135
Primary beam at
west of Upper Deck.
Mitigation required
as UC exceeded
code check criteria
due to PAR pin load
TOPSIDE
Note: < > denotes refined UC
Dulang D
1 1
Beam : W36 x 135 - Strengthened with built –up tee section
Section 1-1
Dulang D
Built-up
Tee
Added
Section 2-2
Tubular : 609.6mm x 31.75mm w.t - Strengthened with Channel section