Solution for leachate treatment plant


Slide Content

PROPOSAL FOR LEACHATE TREATMENT PLANT (LTP) Greenviro Solution Sdn . Bhd. www. airb. com. my

DIVERSIFIED INFRASTRUCTURE CONGLOMERATE MMC`s Group of Companies

AIRB GROUP OF COMPANIES Aliran Utilities Sdn Bhd water infrastructure expert Industrial Water Solutions covering Membrane Technology Operations and Maintenance of Water Treatment Plants (Perak) Ancillary water business such as Asset Management and Non-Revenue Water

Asset Management, NRW and GIS Development of Asset Management System, GIS and also NRW reduction program Wastewater / Sewerage Treatment Plant Design, Build, Operate, Upgrade Project Finance Option for Project Financing based on type of project Water Treatment Plant Engineering & Construction, Operation & Maintenance, Rehabilitation of Plant Wastewater Recycling Reclamation of Wastewater to Clean Water for various Desalination Design, Build, Operate, Rehabilitation 4 AIRB has gather solid know how and technical competency in engineering for over 28 years of experienced in water industry AIRB CAPABILITIES Full Spectrum of integrated water solution provider

Wastewater Treatment Plant Upgrading and Operation & Maintenance (O&M) of Wastewater Recycling Plant at Chicken Processing Plant, Klang (1.3 MLD) F3WT Reverse Osmosis Water Treatment Plant at Top Glove, Klang for Phase 1 ( 7.9MLD) & Phase 2 (2.8MLD) Sunway Water Supply Treatment Plant (8.0MLD) Drilling, Develop, Construct, Operate, and Maintain Underground Water Treatment Plant and Supply for Palm Oil Production Plant ( 0.8MLD ) Langat Sewerage Plant & Langat 2 Water Treatment Plant. CENTRAL REGION (KL & SELANGOR) NEGERI SEMBILAN Design, Build, Operation & Maintenance (O&M) of three (2) Wastewater Recycling Plants for Glove Manufacturing plant (Capacity: 3.0 MLD): Design and Built of 70m3/hour Wastewater Treatment Plant at Avecena Gloves, Sendayan Develop, Construct, operate, and maintain Reclamation Plant and Supply Treated Water at Goodgloves , Sendayan . OVERVIEW OF PROJECT IN MALAYSIA Past Project Overview 5 JOHOR Construction of Water Treatment Plants in Johor. Design, Build, Operation & Maintenance (O&M) of Wastewater Recycling Plants for electronics manufacturing plant. (1.4 MLD) Wastewater Upgrade and Recycling for Chicken Processing Plant at Bandar Tenggara, Johor (0.5 MLD) Wastewater Recycling Plant at Kontena Nasional Berhad , Pasir Gudang. Construction of Water Treatment Plants in Johor. Industrial Wastewater Treatment & Wastewater Potable Water Treatment System / Package Plant Asset Management Project, Engineering & Construction (MMCES) LEGEND

Proposed for Leachate Treatment System Proposed for Leachate Treatment Plant ( LTP ) 350 m 3 /day (To be discharged to the nearest drain ) Leachate The estimated area required can be confirmed during detail engineering. Supply treated water Source of water Area of Leachate Treatment Plant TECHNICAL PROPOSAL Introduction Parameter Initial Raw value, mg/L pH 3.9-4.6 BOD 4200 COD 76972 TSS 1915 Arsenic 0.12 Pb 0.15 Cu 0.24 Mn 2.26 Zn 5.7 Fe 124.9 Formaldehyde, CH2O 2.8 Phenol, C6H6O 0.642 Sulfide 0.99 O&G 644 AN 183.4 Color 500 Raw Water Characteristics

TECHNICAL PROPOSAL Process Flow Diagram (PFD) Leachate Treatment Plant - Process Flow Diagram EQ Oil Interceptor UASB Anoxic Tank DAF Chemical Reaction Tank Aeration Tank Screening ACF Treated Water Tank MMF SLUDGE CAKE DISPOSAL Filtrate to EQ Stripping Tank Clarifier Coagulation Tank Flocculation Tank 350 m 3 /day To Nearest Drain Biogas Flares RAS WAS Sludge Holding Tank Dewatering Parameter Initial value, mg/L pH 7 BOD 16.26 COD 212.81 TSS 0.18 Arsenic 0.03 Pb 0.02 Cu 0.04 Mn 0.10 Zn 0.91 Fe 3.36 Formaldehyde, CH2O 0.20 Phenol, C6H6O 0.001 Sulfide 0.25 O&G 2.42 AN 1.69 Color 30 Sludge Holding Tank Dewatering SLUDGE CAKE DISPOSAL UF UF Waste Recycled Water

TECHNICAL PROPOSAL Scope of Supply - Equipment Dimension  No.  Equipment Quantity Effective Volume, m3 1 Equalization Tank (EQ) 1 Lot 100 2 Screening Tank 1 Lot 1.5 3 Oil Interceptor 1 Lot 6.0 4 Chemical Reaction Tank 1 Lot 20.0 5 Coagulation Tank 1 Lot 5.5 6 Flocculation Tank 1 Lot 10.0 7 Dissolved Air Flotation (DAF) 1 Lot 24.0 8 Upflow Anaerobic Sludge Blanket 1 Lot 525.0 9 Anoxic Tank 1 Lot 333.33 10 Aeration Tank 1 Lot 1000.00 11 Lamella Clarifier 1 Lot 60.0 12 Stripping Tank 1 Lot 500.0 13 Activated Carbon Filtration (ACF) 1 Lot 8.75 14 Multimedia Filtration (MMF) 1 Lot 3.0 15 Ultrafiltration System 1 Lot 0.078 16 Treated Water Tank 1 Lot 50.0 17 Sludge Holding Tank 1 (Metal Sludge) 1 Lot 40 18 Sludge Holding Tank 1 (Biological Sludge) 1 Lot 50 19 Screw Press, Metal Sludge 1 Lot 15 – 20 kg DS/h 20 Screw Press, Biological Sludge 1 Lot 20 – 25 kg DS/h Pre-Treatment – Physical Chemical Process – Biological Process – Advanced Process – Dewatering process

Wastewater reclamation is the process of converting wastewater into potable/non-potable water to be reused for beneficial purposes WASTEWATER RECLAMATION TREATMENT SOLUTION Sustainability of our water resources through technology innovations Wastewater Reclamation System Technologies: Dissolved Air Flotation (DAF) Sand Filter Carbon Filter Multimedia FIlter Ultrafiltration (UF) Reverse Osmosis (RO) AIRB utilizes innovative green approach through wastewater treatment technologies for many resolutions: Industrial use ( eg : processes) E nvironmental restoration Agriculture Cleaning/washing Benefits: Minimize operating cost Self-sustaining of water supply and environment Reduce water bills

Wastewater reclamation is the process of converting wastewater into potable/non-potable water to be reused for beneficial purposes WASTEWATER RECLAMATION TREATMENT SOLUTION Sustainability of our water resources through technology innovations Wastewater Reclamation System Technologies: Dissolved Air Flotation (DAF) Sand Filter Carbon Filter Multimedia FIlter Ultrafiltration (UF) Reverse Osmosis (RO) AIRB utilizes innovative green approach through wastewater treatment technologies for many resolutions: Industrial use ( eg : processes) E nvironmental restoration Agriculture Cleaning/washing Benefits: Minimize operating cost Self-sustaining of water supply and environment Reduce water bills

Wastewater reclamation is the process of converting wastewater into potable/non-potable water to be reused for beneficial purposes WASTEWATER RECLAMATION TREATMENT SOLUTION Sustainability of our water resources through technology innovations Wastewater Reclamation System Technologies: Dissolved Air Flotation (DAF) Sand Filter Carbon Filter Multimedia FIlter Ultrafiltration (UF) Reverse Osmosis (RO) AIRB utilizes innovative green approach through wastewater treatment technologies for many resolutions: Industrial use ( eg : processes) E nvironmental restoration Agriculture Cleaning/washing Benefits: Minimize operating cost Self-sustaining of water supply and environment Reduce water bills

COMMERCIAL PROPOSAL Overall Costing for 8 months construction period Engineering, Procurement, Construction and Commissioning (EPCC) CA P E X Project lead time of this plant shall cape at maximum 8 months from date of PO confirmation. Lead time includes civil and structural works. The Works performed by AIRB is subject to a warranty period of 12 months from the completion date. The payment milestones shall be as follows; 20% - Down payment upon confirmation of order 10% - Upon submission of detail engineering 25 % - Upon order of major equipment 15% - Upon delivery of major equipment 25% - upon installation of major equipment 5% - upon completion of testing and commissioning Item Unit Price, RM Details Design and Submission of regulatory approval 1 lot Equipment Cost 1 lot 4,810,000.00 Installation & Overall Piping 1 lot Electrical work, Instrumentation, Testing & Commissioning, etc. 1 lot Civil & Structural works 1 lot Testing & Commissioning 1 lot 6,310,000.00

TECHNICAL PROPOSAL Operation Team Organizational Chart Project Manager Ts. Maizan Aza Mohamed Yusop Project Engineer Mohd Zahin Mazlan Project Planner Nurasyikin Mohamad Fauzi Safety, Health & Officer Mohamed Farhan Samsuddin Project Coordinator Mohd Danial Mohd Adenan Operation Team Organizational Chart Consultant Prof. Dr.Rakmi

Project schedule for 12 months construction period Gantt Chart Items/Duration Months 1 2 3 4 5 6 7 8 Contract / LOA awarded Engineering & Design Civil & Structural Works Fabrication Delivery & Installation Testing & Commissioning Acceptance TECHNICAL PROPOSAL Project Schedule 9 10 11 12

THANK YOU Aliran Ihsan Resources Berhad | Business Development +603 2280 0493 | [email protected]