Horizontal Liner y los retos del trabajo

Gualalpe 18 views 30 slides Sep 23, 2024
Slide 1
Slide 1 of 30
Slide 1
1
Slide 2
2
Slide 3
3
Slide 4
4
Slide 5
5
Slide 6
6
Slide 7
7
Slide 8
8
Slide 9
9
Slide 10
10
Slide 11
11
Slide 12
12
Slide 13
13
Slide 14
14
Slide 15
15
Slide 16
16
Slide 17
17
Slide 18
18
Slide 19
19
Slide 20
20
Slide 21
21
Slide 22
22
Slide 23
23
Slide 24
24
Slide 25
25
Slide 26
26
Slide 27
27
Slide 28
28
Slide 29
29
Slide 30
30

About This Presentation

Liner Horizontal y los retos


Slide Content

CO S L MÉXICO S.A. DE C.V . Horizontal liner 7” Cementing Job @4,498 md / 2,748 mv Uchbal 2 - PAE Gulf Driller 8 02.2022 1

PREFACE A casing string that does not extend to the top of the wellbore, but instead is anchored or hanged from inside the bottom of the previous casing string ( Schlumberger , s.f .). Reduce costs X High risk Drilling Liners Production L iner Stub Liner Scab Liner 2

DEVIATED LINERS Why to drill highly deviated or even horizontal liners ? To avoid mechanical and physical inestability , also to aislate zones so no comunication of fluids take place. Avoid water channeling , better oil production , less number of wells to exploit a field (Nelson, E.B. Well Cementing , 1983). 3

Wellbore Challenges Cuttings deposition Standoff Slurry Design Challenges No free fluid No sedimentation Fluid loss Control Long 4 hrs . Static Time Cementing Job Challenges Well circulation Casing rotation while cementing No gas influx Minimize transition time No lost circulation CHALLENGES FOR A GOOD HORIZONTAL CEMENTING JOB 4

WELL DESIGN – LINER 7” – UCHBAL 2 Fluid Position Job Design MUD PROPERTIES Type : Oil Based Mud Base: Diesel Density: (g/cm3) 1.50 PV (cP) /YP (lb/100ft2) : 28 / 18 SLURRY PROPERTIES Volume (bbl/m3): 43.98 / 06.99 CMT Ton: 9.71 Neat H Cement + Expansive Material Length (m): 500 Yield (L/sk) 36.53 Water Req (L/sk): 18.45 Mix Water (L/sk) 20.39 BASIC INFORMATION Casing Depth (m): 4,498 md / 2,478 mv Top Of Cement (m): 3,998 md / 2,468 mv BHST (°C): 78 BHCT (°C): 71 Spacer (g/cm3): 1.60 Excess : 0% Angle : 89° 5

ACTUAL OPERATION – LINER 7” – UCHBAL 2 Cementing Job Schedule Stage Event Density (g/cm³) Volume ( bbl ) Q ( bpm ) E/T (min) Accumulated Time (min) Back Pressure (psi) MPC – ECD (g/cm³) Observations 1 Spacer 1.60 100.00 4 25.00 25.00 20 1.66 HPU Pumped 2 1st Dart Release - - - 60.00 85.00 500 1.65 HPU tanks wash / Slurry Pre-mix 3 Slurry 1.95 43.98 4 11.00 96.00 20 1.67 Check Density with pressurized balance 4 2nd Dart Release - - - 10.00 106.00 500 1.65 Check Indicator 5 Spacer 1.60 20.00 4 05.00 111.00 20 1.67 HPU Pumped 6-1 O.B.M 1.50 219.00 5 43.80 154.80 20 1.68 HPU Pumped - 1st Dart / Plug Landing 6-2 O.B.M 1.50 45.00 5 09.00 163.80 20 1.68 2nd Dart / Plug La nding 6-3 O.B.M 1.50 51.00 5 10.20 174.00 20 1.68 – 1.69 HPU Pumped 6-4 O.B.M 1.50 55.76 4 13.94 187.94 20 1.67 – 1.72 HPU Pumped / End of Displacement 7 Liner Releasing Procedure - - - 240 428.00 500 1.65 Liner Releasing Procedure 07:08     Operation Total Time 07:08 ( hh:mm ) 6

ACTUAL OPERATION – LINER 7” – UCHBAL 2 Cementing Job Graph 7

BEST PRACTICES FOR HORIZONTAL LINER CEMENTING Mud removal : Imperative to a successful cementing job . 8

BEST PRACTICES FOR HORIZONTAL LINER CEMENTING Mud removal : Lab Tests . COMPATIBILITY TEST PERFORMED WITH RIG SAMPLES 9

BEST PRACTICES FOR HORIZONTAL LINER CEMENTING Mud removal : Mechanical OBM Removal . 10

BEST PRACTICES FOR HORIZONTAL LINER CEMENTING Pipe Rotation : Imperative , since the hole require more mechanical action to obtain maximal removal of cutting beds on the low side of the hole (Nelson, E.B. Well Cementing , 1983). 11

BEST PRACTICES FOR HORIZONTAL LINER CEMENTING Drilling Shoe 12

BEST PRACTICES FOR HORIZONTAL LINER CEMENTING Centralization : Proper centralization will enhance displacement by providing a uniform flow path of slurry . On horizontal wells rigid centralizers should be used rather tan bow springs ; also it is not uncommon to run 2 centralizers per joint (Un Siglo de Perforación, tomo 7, Ingeniería de Cementaciones). 13

BEST PRACTICES FOR HORIZONTAL LINER CEMENTING Centralization : Centralizers Proposed to Operation . 14

BEST PRACTICES FOR HORIZONTAL LINER CEMENTING Centralization : Stand-Off Graph . 15

BEST PRACTICES FOR HORIZONTAL LINER CEMENTING Centralization : Because 8 ½” section was under sidetrack client decided not to run centralizers . 16

Fluid Loss : The slurry design should contain a fluid- loss aditive providing less than 50 cc/30 min BEST PRACTICES FOR HORIZONTAL LINER CEMENTING 17

Thickening Time: Type of Liner Hanger required 04 h static time after operational time ( static time to be used as contingency during ball gravitation ): Achieved by selecting right retarder concentration , not sacrificing UCA results . BEST PRACTICES FOR HORIZONTAL LINER CEMENTING Special Test Run Expansion SGSA Crush Test Sedimentation Acoustic Impedance Sensibility : +/- 05°C Sensibility : +/- 1000 psi 18

Overlap with previous liner / casing : Provide 150 m overlap with previous casing , mínimum of 100 m (Un Siglo de Perforación, tomo 7, Ingeniería de Cementaciones ). BEST PRACTICES FOR HORIZONTAL LINER CEMENTING 19

Job Simulation : using CEMPRO+ with latest well and job parameters , so the software can model the job accordingly BEST PRACTICES FOR HORIZONTAL LINER CEMENTING 20

Prior to Job: Well was circulated about 4:10 h, with Q= 3 bpm , wich represents 1.2 full well capacity . Spacer Pumping : Pressure was 500 psi over simulated pressure , this probably because real hole diameter . 1st Dart Release : Meanwhile , slurry pre-mix started . During Slurry Pumping : Pressure 350-400 psi over simulated pressure , density achieved . 2nd Dart Release : Meanwhile , Spacer was received in HPU displacement tanks . Spacer / Displacement : Pumped according program . Dart landings ( with 2,700 and 2,300 psi) were observed , so a better on-program displacement could be done. Final Pressure : Pumping ends with 1,200 psi and 500 of over-pressure confirmation . Floating Equipment Test: Proceeds to check flow back, releasing trapped pressure and returning 02 bbl to HPU displacement tanks . Packer activation : Released Stainless Steel 2.5” ball and waited for gravitation . When landed , pressure up to 6,000 psi. Observing and testing hanger expansion . POST JOB ANALYSIS 21

Tagged TOC: Tagged TOC @4,435 m with 5 Ton of WOB. Liner Integrity Test: Performed possitive pressure test with 2,500 psi, Ok. POST JOB RESULTS Liner Integrity Test Microscopic sample of oil-impregned rock from Pay Zone 22

RESOURCES 23 Internal Procedure : Accordingly to COSL México Quality Assurance , a plan to prepare a whole operation is needed . Design Engineering Department / Technical Representative : Will deliver client’s specific requests to each process line. Also , will deliver calcs , simulations and technical specs prior the operation to Operative Staff. Lab : Tests will be generated , according client , well and operation needs . Material and Equipment Yard Personnel : People in charge of preparing equipment and additives needed for the job . Cement Plant Staff: Personnel that will perform the BOR delivered by DED. Logistics Department : Will provide the deliver plan of material and equipment to client . Also , are the people in charge of recovering rig samples for lab tests . Operative Staff: People that will execute the operation in situ. Field Engineer : Person in charge to deliver a quality service to client , and to sign b illing docs. Management Department : In charge of verifying and approving requests, as well as assigning staff for each area. HSE Department: Compliance SSPA requirements for the client.

RESOURCES 24 Internal Procedure : Accordingly to COSL México Quality Assurance , a plan to prepare a whole operation is needed . Design Engineering Department / Technical Representative : Will deliver client’s specific requests to each process line. Also , will deliver calcs , simulations and technical specs prior the operation to Operative Staff. Lab : LAR’s will be generated , according client , well and operation needs . Material and Equipment Yard Personnel : People in charge of preparing equipment and additives needed for the job . Cement Plant Staff: Personnel that will perform the BOR delivered by DED. Logistics Department : Will provide the deliver plan of material and equipment to client . Also , are the people in charge of recovering rig samples for lab tests . Operative Staff: People that will execute the operation in situ. Field Engineer : Person in charge to deliver a quality service to client , and to sign b illing docs. Management Department : In charge of verifying and approving requests, as well as assigning staff for each area. HSE Department: Compliance SSPA requirements for the client.

RESOURCES 25 Internal Procedure : Accordingly to COSL México Quality Assurance , a plan to prepare the whole operation is needed . Design Engineering Department / Technical Representative : Will deliver client’s specific requests to each process line. Also , will deliver calcs , simulations and technical specs prior the operation to Operative Staff. Lab : LAR’s will be generated , according client , well and operation needs . Material and Equipment Yard Personnel : People in charge of preparing equipment and additives needed for the job . Cement Plant Staff: Personnel that will perform the BOR delivered by DED. Logistics Department : Will provide the deliver plan of material and equipment to client . Also , are the people in charge of recovering rig samples for lab tests . Operative Staff: People that will execute the operation in situ. Field Engineer : Person in charge to deliver a quality service to client , and to sign b illing docs. Management Department : In charge of verifying and approving requests, as well as assigning staff for each area. HSE Department: Compliance SSPA requirements for the client.

RESOURCES 26 Internal Procedure : Accordingly to COSL México Quality Assurance , a plan to prepare a whole operation is needed . Design Engineering Department / Technical Representative : Will deliver client’s specific requests to each process line. Also , will deliver calcs , simulations and technical specs prior the operation to Operative Staff. Lab : LAR’s will be generated , according client , well and operation needs . Material and Equipment Yard Personnel : People in charge of preparing equipment and additives needed for the job . Cement Plant Staff: Personnel that will perform the BOR delivered by DED. Logistics Department : Will provide the deliver plan of material and equipment to client . Also , are the people in charge of recovering rig samples for lab tests . Operative Staff: People that will execute the operation in situ. Field Engineer : Person in charge to deliver a quality service to client , and to sign b illing docs. Management Department : In charge of verifying and approving requests, as well as assigning staff for each area. HSE Department: Compliance SSPA requirements for the client.

RESOURCES 27

RESOURCES 28 Internal Procedure : Accordingly to COSL México Quality Assurance , a plan to prepare a whole operation is needed . Design Engineering Department / Technical Representative : Will deliver client’s specific requests to each process line. Also , will deliver calcs , simulations and technical specs prior the operation to Operative Staff. Lab : LAR’s will be generated , according client , well and operation needs . Material and Equipment Yard Personnel : People in charge of preparing equipment and additives needed for the job . Cement Plant Staff: Personnel that will perform the BOR delivered by DED. Logistics Department : Will provide the deliver plan of material and equipment to client . Also , are the people in charge of recovering rig samples for lab tests . Operative Staff: People that will execute the operation in situ. Field Engineer : Person in charge to deliver a quality service to client , and to sign b illing docs. Management Department : In charge of verifying and approving requests, as well as assigning staff for each area. HSE Department: Compliance SSPA requirements for the client.

RESOURCES Internal Procedure : Accordingly to COSL México Quality Assurance , a plan to prepare a whole operation is needed . Design Engineering Department / Technical Representative : Will deliver client’s specific requests to each process line. Also , will deliver calcs , simulations and technical specs prior the operation to Operative Staff. Lab : LAR’s will be generated , according client , well and operation needs . Material and Equipment Yard Personnel : People in charge of preparing equipment and additives needed for the job . Cement Plant Staff: Personnel that will perform the BOR delivered by DED. Logistics Department : Will provide the deliver plan of material and equipment to client . Also , are the people in charge of recovering rig samples for lab tests . Operative Staff: People that will execute the operation in situ. Field Engineer : Person in charge to deliver a quality service to client , and to sign b illing docs. Management Department : In charge of verifying and approving requests, as well as assigning staff for each area. HSE Department: Compliance SSPA requirements for the client. 29

Thank you! 30