About This Presentation

H2020 research project on #deepretrofit for building facade using easy to install precast panels, innovative IT including #BIM with a novel business model


Slide Content

Retrofit Project

This project has received funding from the
European Union’s Horizon 2020 research and
innovation programme under grant agreement
No 636717
•EU Horizon 2020
•Jun 15 to Nov 18
•16 organisations
•7 countries
•€4.6 million (EU)
IMPRESS

This project has received funding from the
European Union’s Horizon 2020 research and
innovation programme under grant agreement
No 636717
IMPRESS will develop a new range of easy to install pre-fabricated
panels, to reduce energy demand while preserving or improving the
aesthetics of the building.
This will be done by:
Plan

This project has received funding from the
European Union’s Horizon 2020 research and
innovation programme under grant agreement
No 636717
Aims

This project has received funding from the
European Union’s Horizon 2020 research and
innovation programme under grant agreement
No 636717
High Level Methodology
Manufacturing Construction
Detailed
Design
Initiation
and
Viability
Operations
and
Maintenance
I II IIIIV V

This project has received funding from the
European Union’s Horizon 2020 research and
innovation programme under grant agreement
No 636717
Partner:
Sirus
Equipment:
Thermography
Sensors
Temperature/°C
% Relative Humidity/%RH
Carbon Dioxide/CO
2
Current/Pyranometer/Heat Flux
U Value,
Building Management Systems (BMS)
Software:
Flir/Testo/Kimo/Hioki
Task:
The building is monitored before, during
and after retrofit
Monitoring

This project has received funding from the
European Union’s Horizon 2020 research and
innovation programme under grant agreement
No 636717
Partner:
Geonardo
Equipment:
Faro 3D laser scanner
Software:
Faro
Task:
The building surface is
scanned from a range of
positions around the site to
the level of accuracy required
in the final 3D computer
model
3D Scan

This project has received funding from the
European Union’s Horizon 2020 research and
innovation programme under grant agreement
No 636717
Partner:
QUB, IES
Equipment:
Laptop/PC
Software:
AutoCAD, 3ds Max, Revit, Rhino
Task:
The point cloud data is imported in
to 3D CAD Software, transformed
to a mesh, and modelled from a
predefined library to produce a 3D
model of the cladding
3D Model

This project has received funding from the
European Union’s Horizon 2020 research and
innovation programme under grant agreement
No 636717
Partner:
QUB, Techrete, Sirus
Equipment:
Concrete mixer, shotcrete pump,
water treatment, constant
temperature room
Task:
The external layer of mix is poured
into the mould, the shear truss ties,
insulation and sensors inserted and
the internal layer of the sandwich
panel is poured.
Cast Panels

This project has received funding from the
European Union’s Horizon 2020 research and
innovation programme under grant agreement
No 636717
Partner:
Techrete
Equipment:
Heavy Lifting equipment
and specialised tools
Task:
Fittings such as windows,
vents and other
components are installed
in the panels at the factory
in advance of transport to
the site
Construction

This project has received funding from the
European Union’s Horizon 2020 research and
innovation programme under grant agreement
No 636717
Installation
Partner:
Techrete, Bergamo, Biesse
Equipment:
Specialised installation
equipment
Task:
The panels are fixed onto
the existing structure and
sealed with a novel
silicon/elastomeric jointing
system.

This project has received funding from the
European Union’s Horizon 2020 research and
innovation programme under grant agreement
No 636717
This project has received funding from the
European Union’s Horizon 2020 research and
innovation programme under grant agreement
No 636717
We measure

This project has received funding from the
European Union’s Horizon 2020 research and
innovation programme under grant agreement
No 636717
IMPRESS will develop a new range of easy to install pre-fabricated
panels, to reduce energy demand while preserving or improving the
aesthetics of the building.
This will be done by:
Plan

This project has received funding from the
European Union’s Horizon 2020 research and
innovation programme under grant agreement
No 636717
BIM Level 2

This project has received funding from the
European Union’s Horizon 2020 research and
innovation programme under grant agreement
No 636717
IMPRESS will develop a new range of easy to install pre-fabricated
panels, to reduce energy demand while preserving or improving the
aesthetics of the building.
This will be done by:
Plan

This project has received funding from the European Union’s
Horizon 2020 research and innovation programmeunder grant
agreement No 636717
Aesthetics
IMPRESS Business Model
Manufacturing
Construction
Design
Initiation &
Viability
Operations &
Maintenance
Tools
DST : Energy Simulation
Schedule
Fixed Cost
Energy
Performance
Bonus (1
-
5%)
Penalty (1
-
5%)
Quality
Retention/
Contingency
(10%)
Variable
CostEPC
Online Management Platform with BIM Level 2 and Auditing Tool
Bond
(100
-
0%)
Governance-Energy Services Company (ESCO)
ESCO OPTIONS
STAGES High Level Performance (KPI ) Financial Mechanism-Fixed Price + Incentive Fee
*Where
EPC=Energy
Performance
Contract

This project has received funding from the
European Union’s Horizon 2020 research and
innovation programme under grant agreement
No 636717
Go raibhmaithagaibh
with special thanks to
Roisin Hyde, QUB, Nick Purshouse, IES, Ralph Montaque
ArcDox & Ralph Bingham, MOLA Architecture
•http://www.project-impress.eu/
[email protected]
•T:+353 85 8555792
•@shirleyatsyspro