About This Presentation

Trained and medically fit for you to work at height


Slide Content






JOB SAFETY ANALYSIS
Doc. No.:
Rev.: 00
Date:
Page: 1 of 2

Project: Ajyal international School Project
Project#: Area:Dist Ajyal Dammam Saudi Arabia

General Comments: Proper PPE, TBT should be conducted before start the job,
Access control authority would be DEL Site Manager/Site Engineer

Date: Supervisor:
Job Description: Work at Height
Item
Detail of
Activity
Equipment &
Tools used
Risk Involved Control Measure
Responsible
Person
Severity
Rating


1






2





3




4














TRANSPORTING
SCAFFOLDING
MATERIAL AT
SITE.



UNLOADING OF
SCAFFOLDING
MATERIAL.


STORAGE OF
SCAFFOLD
MATERIAL.


ERECTION &
DISMANTLING
OF
SCAFFOLDING.




● VEHICLES.



● SCAFFOLDI
NG
MATERIALS
. (PIPES,
JOINTS,
PLANKS,
BASE
PLATE, TOE
BOARD &
etc.)



● .LEVEL
STRIP,
HAMMER,
METER TAP
& ROPE.


● MATERIAL CAN FALL.
● PERSONAL INJURY.
● UNAUTHORIZED /
UNTRAINED/
INEXPERIENCED
PERSONNEL ON THE JOB
● UNEVEN GROUND
● FAULTY/ POOR
CONDITION SCAFFOLDING
MATERIAL
● IMPROPER
SCAFFOLDING ERECTION
● TAG SYSTEM NOT
FOLLOWED.
● WRONG MATERIAL
HANDLING/ FALLING OBJECT
● PERSONNEL INJURY.
● PERSONNEL FALL.
● OBJECT FALL.
● PROPERTY LOSS
















● MATERIAL WILL BE FASTENED PROPERLY BEFORE
TRANSPORTING TO SITE.
● ONLY EXPERIENCED, SKILLED AND TRAINED
PERSON SHOULD BE ALLOWED
● ALL HANDTOOLS SHOULD BE INSPECTED PRIOR TO
START OF JOB
● SCAFFOLDING PIPES WITH CORROSION SHOULD NOT
BE USED.

● MATERIAL WILL BE UNLOADED WITH BOOM TRUCK
● CERTIFIED BOOM TRUCK OPERATOR WILL CARRY
OUT THE TASK.

● MATERIAL WILL BE STORED IN A DESIGNATED AREA.
● MATERIAL WILL BE STORED ON SCAFFOLD RACKS.
● HARD BARRICADE AND SIGNAGE WILL BE PROVIDED

● GROUND SURFACE SHOULD BE LEVELED
● RED TAG MUST BE PLACED/ HANGED AT THE START
OF SCAFFOLDING
● ENSURE VERTICAL PIPES ALLIGNMENT AND CHECK
IT WITH HAND LEVEL
● ENSURE ALL JOINTS ARE PROPERLY TIGHTENED
● USE BRACING PIPES AND OUTERRIGGERS PIPES
WHERE NECESSARY.
● ONLY CERTIFIED SCAFFOLDERS WILL PERFORM THE
JOB.
● SCAFFOLDERS WILL BE TRAINED ON SAFE WORKING
AT HEIGHT.
● ABOVE 1.8M HEIGHT SAFETY HARNESS WILL BE
WITH DOUBLE LANYARD. 100%TIE OFF WILL BE
ENSURED.
● SCAFFOLD PLATFORM WILL NOT BE OVERLOADED.
● HAND RAIL AND TOE BOARDS WILL BE INSTALLED
WITH SCAFFOLDING PLATFORM.
● ALL EMPLOYEES WILL WORK WITH PROPER PPES.


Area I/C
(Authorized
Person).

3

2

3

3

3

2


3


3



3


3

● ELECTRIC SHOCK DUE
TO POWER LINE
● LADDER SHOULD BE CONSTRUCTED AT SUITABLE.

● METAL PLANKS SHOULD BE PROERLY PLACED ON
PIPES WITH HOOKS AND USE BINDING WIRE FOR
BINDIND WHERE NECESSARY
● NO PERSON SHOULD GO IN DROP ZONE.
SCAFFOLDING AREA.
● AREA SHOULD BARRICATED WHILE ERECTION OR
DISMENTLING THE PLATFORM.

● AREA MUST BE CHECKED & FREE FROM ELECTRICAL
WIRES BEFORE ASSEMBLING TO THE CRANE.

OVERHEAD
ELECTRICAL
POWER LINES

● SCAFFOLD
STRUCTUR
E

● PERSONAL INJURY
● PROPERTY LOSS

● ENSURE OVERHEAD CLEARANCE WHILE
OPERATING THE EQUIPMENT

Area
Representative


5

NIGHT WORKING
ACTIVITIES






● LIGHTS
● STANDS
Trdsssssdrttt

● HAND INJURY/EYE
INJURY
● ELECTRIC SHOCK /
ELECTROCUTION
● IMPROPER ILLUMINATION
● PERSONAL INJURY
● PROPERTY LOSS




● ENSURE WORKERS ARE COMPLYING PPE’S
REQUIRED.
● EXTINGUISHER MUST BE PRESENT AT ALL
TIME
● LIGHT SHOULD BE PROPER PRIOR TO START
THE WORK.
● ALL POWER CABLES SHOULD BE INSPECTED
AND INSULATED.
● LIGHTS SHOULD BE INSTALLED OVER HEAD
HEIGHT TO AVOID GLARING TO PERSONAL.
● IF GENERATOR USE FOR ELECTRICITY SHOULD BE
PROPERLY GROUNDED
● ALL TOWER CRANE LIGHTS SHOULD BE CHECKED
AND USE WHEREVER NECESSARY.



Area I/C
(Authorized
Person).


2


3


2


3





6




HOUSEKEEPING




MANUAL CLEANING
OF AREA






● HOUSEKEEPING
● AREA BARRICADING
● PPE
● PROPERTY LOSS
● SLIP/TRIP
● FALL FROM HEIGHT






AREA IN-
CHARGE


3
2
3

Severity Rating : (1) First Aid / Minor Property Damage (2) Recordable Accident / Property Damage

(3) Lost Time Accident / Major Property Loss (4) Catastrophic Accident

Are you aware of, and do you have the correct PPE? What are the risks? How do controlled risks?


_______________________________ __________________________
AREA ENGINEER / SUPERVISOR HSE REPRESENTATIVE
Tags