Introduction of LHB Coaches on IR
•24importedACchaircarsarrivedinIndiain2000-01undera
TOTandpurchaseagreementbetweenIRandM/sALSTOM.
•TrainNo.2003/2004NewDelhi–LucknowShatabdi;
introducedinserviceon29.5.2001.
Exterior View of LHB Coach
Interior View of LHB Coach
AC Chair Car
With Centre Table
Holding
Premium Services Running With LHB Stock
Train No. From To No. of Rakes
Shatabdi Trains
12005/06 NDLS KLK 1
12001/02 NDLS BPL
6
12003/04 NDLS LKO
12011/12 NDLS KLK
12013/14 NDLS ASR
12017/18 NDLS DDN
Rajdhani Trains
12235/36 NDLS DBRT
3
12435/36 NDLS DBRT
12423/24 NDLS DBRT 5
12431/32 NZM TVC 3
Duronto Train
12213/14 DEE YPR 1
Salient Features
•Speed - 160 kmph ( Fit up to180Kmph
& upgradeable to 200Kmph)
•Length over body - 23.54m
•Width of carbody - 3.24m
•Length over buffers - 24.00m
•Wheel base - 2.56m
•Minimum radius of curve - 175 m
•Car height above rail level- 4.039m
•Wheels - Monoblock
Dia : 915mm -845mm
•Distance between center pivot- 14.90m
LHB Coach –A Superior Alternative
Parameter ICF Design LHB Design
Cost Rs. 1.0 crore approx. Rs.1.75 Cr. approx ( Rs. 5.5 Cr. For
imported version)
Speed potential 130 Kmph 160 Kmph
Codal life 25 years 35 years
POH periodicity 18 months 36 months
Body construction Corten steel necessitating
heavy corrosion repair(s)
Austenitic/Ferritic Stainless steel
with almost no corrosion
Ride index 3.2 at 130 Kmph 2.5 at 160 Kmph
Coach Tare weight Approx. 43 tonnes Approx. 41 tonnes
Brake system Conventional clasp brakeDisc brake
Noise and Sound
insulation
Average Superior (85-110 dB)
Aesthetics and interiorsMedium size windows
LP sheet panels
Large panoramic windows
FRP panel
Toilet system Open discharge toilets Controlled discharge toilets
Coupling Conventional screw couplingCenter Buffer Coupler
Bogie-FIAT
•Y shaped frame with tubular cross beam, All coil spring
•Articulated Axle Guidance with control arm
•Lesser wheel base -2560mm in ICF design 2896mm
•Anti -roll bar
•Cartridge Tapered Roller Bearing
•Disc Brakes -Disc dia 640 mm with pads on both side
Bogie-FIAT
Primary Vertical dampers - 4 nos per bogie
( axle -bogie frame)
Secondary vertical dampers - 2 nos per bogie
(bogie frame -bolster)
Lateral shock absorber - 2 nos
( bogie frame -bolster)
Yaw dampers - 2 per coach
Water Supply & Pump Controls
Water Tanks ( 2Nos.)- 685 ltrs each ( Underslung )
Auxiliary Tank - 30 ltrs on each toilet
(Roof Mounted)
PumpControlsystem - Tocontrol&monitor
watercircuit
Schematic Diagram of Water Supply System
Control Discharge Toilet Systems
•Types-Euro Toilets & Oriental Toilet System
•Intermediate tank storage -speed < 30 kmph (10 -15
flushes)
•Water pressurised flushing -4 bar
•Manual over-ride control for discharge
CONTROL DISCHARGE TOILET
Control Panel of CDTS
Control Discharge Toilet System
Issuesinmaintenance
•Jammingofslidesvalves–Qualityofwater,scales,etc.
•Ingressofundesiredforeignmaterialsi.e.papercups,
napkins,bottles,etc.
•Lackofregularmaterialsupporti.e.solenoidvalves,slides,
etc.
Center Buffer Coupler
Features & Safeguards in Operations
Double headed restrictor to prevent vertical uncoupling
of CBC knuckles in between loco and front coach
Clear Tell-tale recess which
ensures that the lock is fully
dropped
TELL TALE LOCK
Locking arrangement for
manual uncoupling
handle
Maintenance Issues –Bogie & Under Gear
•Wheel shelling
•Breakage of brake disc
•Roller bearing failures
•Jerk during running
Frequent Wheel Turning Due to Wheel Shelling
Asurveywasconductedonpopulationof316LHBcoaches
andresultfoundisasunder:
No. of tyre turning after
POH/ IOH
No. of coaches tyre
turned
Average time for tyre
turning (in days)
6 times 1 57
5 times 5 98
4 times 12 114
3 times 26 139
2 times 40 156
1 times 88 238
No turning 144 211 ( After POH/IOH)
Overall average 316
200
*TakingintoaccountapproximateaveragerunningperLHBcoachas20,000KMS
PermonththeapproximateaverageKMSearningbeforeturningcomesto1.5LackKMS
Crack/ Breakage Of LHB Wheel Disc
Breakage of Brake Disc
No. of coaches
surveyed
FTIL KNORR
341 173 168
Population of brake discBROKEN CLAMPING BRACKET
OF BRAKE DISC
Enroute Detachment Due to Failure of
UIC-130 CTRB in LHB Coaches
Year
No. of
instances
Average
holding
Failure in type
of coaches
Make of
assembly
2009-10 1 214 LWSCZAC TIMKEN
2010-11 2 299
1-LWSCZAC
1-LWACCN
Both TIMKEN
2011-12 2 357 2-LWSCZAC Both TIMKEN
2012-13
( Up to
July. 12)
1 416 1-LWACCN SKF
Jerk During Running
•Heavyjerksarebeingfelt,particularlyduringsudden
acceleration&brakingofthetrain.
•Toreducetheproblem,preloadindraftgearofCBChas
beenreducedby50KNto30KNinFTILmake.Thishas
resultedinamarginalimprovementonly.
•NewdesignofCBCdraftgearisunderfieldtrialsandis
expectedtocontroltheproblemconsiderably.
Areas Needing Regular Maintenance Attention
DOORS
•Vestibule
•Passenger Cabin Door
•Lavatory Door
•Pantry Door
•Luggage door in power car
Transition Doors
Working Out/Breakage of Holding Bracket of
Wire Rope of Vestibule Doors
Elastic Wire Grazing with Bracket Resulting
Breakage
Jamming / Rattling of Pantry Doors
Bolts getting loose
frequently
Failure of Reclining Mechanism / Breakage of
Foot Rest
Working Out of Elastic Band of Magazine Bag
Breakage of Retainers of Roller Blind
Working Out of Window Glass Outer Profile
Problem in Maintenance
ALLouvers in Compartment Sliding Door, Pantry Sliding Door
and Lavatory Door are Prone to Theft
Window Shutters are being provided in
Coaches after the theft.
AL. Louvers are prone to theft
S.N. Description Number of Items
1 TotalNo.ofLHBStockItems 133
2 RCFbasedItems 35
3
YearviseVettedDemandofRCFBased'A'Category(Imported)&'B'category(Vital
Indigenous)Items
FortheYear(2010-11) 25No.(AmountRs.97,48,806)
FortheYear(2011-12) DemandnotacceptedbyRCF
FortheYear(2012-13) 18No.(AmountRs.2,33,09,167)
4 FreeSupplyItemsalongwithnewLHBRakes
SupplyFor4(3Raj.+1Stb.)rakes
stillpendingwithRCF
5
NumberofLHBITEMSprocuredunderNon
StockDuringyear2010-11
56No.(AmountRs.80,67,197).
MajorconstrainsinprocurementislimitedavailabilityofVendorsforsubassemblies
requiredbyopenline.
Overview Of LHB Material for DLI Division
Critical Stock Items Affecting LHB Coach
Maintenance
S.
No.
PL No. Feeding
store depot
Material Imprest
for six
month
Supply
( Jan,12
to Jun,12)
133501002 JUDW Primary Vertical
Damper
138 0
230990154 JUDW Brake Pad 35mm 2760 1687
333500459 JUDW Lateral Damper 28 0
430993076 JUDW Sealed Window Glass
(1419x819x18.4mm)
360 212
530993076 JUDW Sealed Window Glass
(1417x817x18mm)
180 90