PELATIHAN COST ESTIMATOR
Jakarta, 26 Juni 2024
GROUP ENGINEERING AND TECHNOLOGY
PT PERUSAHAAN GAS NEGARA TBK
BUSINESS CASE AND FEASIBILITY STUDY
Source:
Evaluation and Funding of Capital Projects in Mining F. K. Crundwell ( 2016)
ENGINEERING ESTIMATE
Source : AACE Cost Estimate Classification System
Preliminary Design
Project Location Selection
•Ketersediaan lahan & ROW pipeline
•Ketersediaan infrastruktur existing
•Kedalaman perairan untuk sandar & tambat kapal
•Metocean & klimatologi
Engineering Estimate AACE Class Minimum
COST ESTIMATE CLASSIFICATION
Depends on the level of detail of each phase, the estimating level of may
determine the decision to continue with a project or more detail shall be
performed.
Remarks:
Blank = None
S = Started
P = Preliminary
C = Completed
ACCURACY LEVEL
Understanding the risk (level of accuracy) of each
phase during deciding to continue with a project may
help in anticipating what to be done to mitigate the
changes.
Class5
Class3
Class2
Class1
30%to100%-20%to-50%
20%to50%-15%to-30%
AccuracyRange
10%to30%-10%to-20%
5% to20%-5%to -15%
3% to15%-3%to -10%
Class4
OutofProjectManagerAuthority
RefertoRisk
PERHITUNGAN COST ESTIMATE
HARGA
TOTAL
TYPE OF COST
TypeofCost
1.DirectCost
2.IndirectCost
3.Fixed
4.Variable
TYPE OF COST
DirectCost
A cost that can be completely attributed to
the production of specific goods or services
-Resource Requirement
Manpower, tool, material
-Project Schedule (duration)
-Risk Register
Risk response which required to be
accommodated to plan
-Quality Management Plan
Cost of Quality
Indirect Cost
Costs that are not directly accountable to
a cost object (such as a particular project,
facility, function or product)
-Resource Requirement
Permit, temporary facilities, etc.
-Project Schedule (duration)
-RiskRegister
Riskresponsewhichrequired
tobe accommodatedtoplan
-QualityManagementPlan
CostofQuality
Overhead Cost
Expenses associated with running a business
that can't be linked to creating or producing a
product or service
-Resource Requirement
Corporate supporting, office rent
-Project Schedule (duration)
-CompanyPortfolio
NumberofProject,BusinessStrategy
COST ESTIMATE METHOD
ParametricEstimating(EndUnitor Physical)
Analogous Estimating (Top Down)
Use values, or attributes of previous projects that
are similar to current project.
Ex: In estimating 100 MW Power Generation Project in South Sumatra
Area, the cost of 90 MW Power Generation Project in North Sumatra
can be used.
Bottom Up Estimating
Three Point Estimating
Estimation done by considering estimation
uncertainty and risk, using three estimates to
define range.
Ex: Record shows 1 Dia-Inch piping work in North
Sumatra is 3$. The cost for 765 Dia-Inch piping
work in South Sumatra approximately 765 x 3 =
2,295$
Estimation done on the greatest level of specified detail.
100% rule apply when Cost Aggregation is performed.
Ex: See Cost Aggregation
Use a statistical relationship between relevant
historical data and other variable to calculate.
COST ESTIMATE METHOD
Capacity Method
Estimation done which relies to non-linear relationship
between capacity and cost.
Rough guideline,n = 0.6 – 0.7
CAPACITYFACTOR-Thepowern<1.0(usually)!
COST
BFACTOR
B
COST FACTOR
n
A
=
A
PERATURAN KEUNTUNGAN – HPS
Sumber :
Peraturan Lembaga Kebijakan Pengadaan Barang/Jasa Pemerintah Republik Indonesia Nomor 12
Tahun 2021 Tentang Pedoman Pelaksanaan Pengadaan Barang/Jasa Pemerintah Melalui Penyedia
HARGA JUAL GAS BUMI MELALUI PIPA
Sumber :
PERATURAN MENTERI ENERGI DAN SUMBER DAYA MINERAL REPUBLIK INDONESIA NOMOR 14 TAHUN 2019
TENTANG PERUBAHAN ATAS PERATURAN MENTERI ENERGI DAN SUMBER DAYA MINERAL NOMOR 58 TAHUN 2017
TENTANG HARGA JUAL GAS BUMI MELALUI PIPA PADA KEGIATAN USAHA HILIR MINYAK DAN GAS BUMI
APLIKASI HARGA
SATUAN
OBJECTIVE APLIKASI HARSAT
HARGA SATUAN
Identifikasi GoalsBusiness Initiative/Improvement
Belum tersedianya sistem database terkait harga
satuan material jaringan dan konstruksi, yang
bisa diakses dan digunakan dengan mudah oleh
semua Perwira PGN
Penyediaan aplikasi database harga
satuan material jaringan dan
konstruksi untuk pekerjaan pipeline
dan beyond pipeline (CNG & LNG) yang
dilengkapi dengan data pendukungnya
Tersedianya aplikasi database Harga Satuan.
Dengan adanya aplikasi database harga
satuan material jaringan dan
konstruksi, Perwira PGN dapat dengan mudah
mendapatkan informasi harga satuan material,
jaringan dan harga satuan konstrArahauksi
dengan cepat yang diperlukan dalam membuat
perhitungan biaya pekerjaan untuk pipeline
dan beyond pipeline, serta dapat membuat
rencana anggaran biaya atas pekerjaan terkait
dan terdokumentasi dengan baik
LINGKUP HARGA SATUAN
1.Harga Satuan Material Jaringan Pipeline
2.Harga SatuanMaterial Beyond Pipeline
3.Arithmetic Trend Harga Material Jaringan
ENGINEERING
1.Harga Satuan Material Konstruksi
2.Harga SatuanKonstruksiDan EstimasiDistribusiPipa Baja Dan PE
3.Harga Satuan Konstruksi Dan Estimasi Instalasi Pipa Baja & PE
4.Harga Satuan Konstruksi Dan Estimasi Pipa PA12
5.Harga Satuan Estimasi Pipa Premier
6.Harga Satuan Konstruksi dan Estimasi Beyond Pipeline
7.Dashboard Rules Of Thumb
8.Arithmetic Trend Harga Konstruksi
CONSTRUCTION
Aplikasi Database Harga Satuan Material Jaringan dan Konstruksi untuk pekerjaan pipeline dan beyond pipeline (CNG
dan LNG) yang dilengkapi data pendukungnya
WEBSITE
PENYUSUNAN HSMJ 2025
LINGKUP HARGA SATUAN
FLOW CHART PERHITUNGAN HSMJ
LINGKUP HARGA SATUAN
HARGA SATUAN MATERIAL KONSTRUKSI
LINGKUP HARGA SATUAN
HARGA SATUAN MATERIAL KONSTRUKSI
HARGA SATUAN ESTIMASI
HARGA SATUAN KONSTRUKSI
HARGA SATUAN KONSTRUKSI
SEBARAN WILAYAH AHS KONSTRUKSI
ALUR DATA HARSAT
Database komponen Analisa Harga Satuan
Daftar Asumsi
Daftar Kegiatan
Daftar Tenaga Kerja
Daftar Alat
Daftar Material
Daftar Harga
Lainnya
Analisa Harga Satuan Pekerjaan
Asumsi
Perhitungan
Scope Pekerjaan
Referensi
Scope Pekerjaan
Produktivitas
Kerja
Komponen
Tenaga Kerja
Komponen Alat
Komponen
Material
Komponen
Lainnya
Biaya Tenaga
Kerja
Biaya Alat
Biaya Material
Biaya Lainnya
Harga Satuan Pekerjaan
Daftar
Analisa Harga Satuan
Pekerjaan
Rekapitulasi
Harga Satuan Pekerjaan
Rencana Anggaran
Biaya
Daftar Alat K3PL
Harga Satuan Material
Jaringan
Daftar Harga Satuan
Material Jaringan
Simulasi Rencana
Anggaran Biaya
Harga Satuan
Estimasi