Metode pengiriman cargo heavy menuju lokasi (site)
kidykids
152 views
44 slides
Jul 15, 2024
Slide 1 of 44
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
About This Presentation
metode pengiriman barang menggiunakan multi axle dari jakarta menuju jambi
Size: 18.51 MB
Language: en
Added: Jul 15, 2024
Slides: 44 pages
Slide Content
Transportation Plan JADESTONE ENERGY (LEMANG) Akatara , Jambi Method Statement Proposal of Transport / Handling by Trans Marpinggan
Table Of Content Equipment List Packing List Route Plan Type Of Transport / Load Distribution (6 axles, 9 axles,12 axles) Tentative stowage plan Method and Handling Similar Experience
Heavy Lift Transport / Handling 12 Axles (1 unit) FH 16 F 12 Scania 1. EQUIPMENT LIST 10 Axles (2 units)
Heavy Lift Transport / Handling List Equipment Jacking and Sliding 1. EQUIPMENT LIST
1. EQUIPMENT LIST Ship Particular
2. Cargo List A. Pasuruan B. Ciwandan C. Singapore
3. Route Plan S i t e L o c a t i o n B e t a ra Jetty C oo rdi n ate L o ca t ion Akatara Site 0°59'24.20"S - 103°20'0.48"E Betara Staging Port 1°0’20.84"S - 103°23’01.91"E 3 rd Junction 2 nd Junction Tru ss B ri dge Distance Transport duration times Lowest Vertical Obstacle Transport Route : 11 Km. : 3 Hrs (Estimated) : 5,2 m (Sei Teluk Serdang Bridge). : Betara Jetty – Jl. Lintas Kuala Tungkal Jambi – Jl. Parit Lapis – Akatara Site. Kuala Tungkal Jambi 1 st Junction 3
Bridge and Obstacle
Betara Staging area Name of jet ty : Betara St ag i n g P o rt. Jett y o wn er Jetty d ims Jetty De pth Coo rdi n ate : Petrochina International Jabung Ltd. : - Berthing Position (21m x 8m). Beaching Position (13 x 10,5m). : - 1,5m for Beaching area. 2,5m for Berthing area. : 1°0’20.84"S - 103°23’01.91"E. Estuary Beaching Jetty Alongside Jetty
Betara Staging area
Berthing position / Alongside Jetty Dimension : Length 21m x Width 8m. Depth : 2,5m Jetty Hei gh t : 1, 5 m Betara Staging area
Beaching position D i m ens i on Depth J e t t y H e i ght : 13,5m x 10,5m. : 1,5m. : 1,6m. Berthing position / beaching position Dimension : Length 21m x Width 8m. Depth : 2,5m Jetty Hei gh t : 1, 5 m Betara Staging area
Temporary Stagging Area 5000 M2
Plan Position Storage area Barge Position
Storage Overview
Storage Overview
Storage Overview
Stool-elephant leg
B e t ara S t a g ing P o r t 9 m 19
Gate B e t ara S t a g ing P o r t 20
Junction #1 From Betara Jetty 21
B r i dg e # 1 Bridge #1 Dimension : Length 1 2 m x Width 4,5m. Type Bridge : Steel beam and Pipe Bridge. Total Span : 1 Span. Mitigation Plan Need Cover Bridge by Steel Plate 22 Cover by steel plate
B r i dg e # 1 23
B r i dg e # 2 Bridge #2 Dimension : Length 7, 5 m x Width 4,5m. Type Bridge : Steel beam and Pipe Bridge. Total Span : 1 Span. Mitigation Plan Need Cover Bridge by Steel Plate Cover by steel plate
B r i dg e # 2
B r i dg e # 3 NN Bridge #3 Dimension : Length 8 ,4 m x Width 8 m. Type Bridge : Steel beam and Pipe Bridge. Total Span : 1 Span. Mitigation Plan Need covered by steel false bridge for Modular trailer configuration passing this bridge . Cover by steel plate
B r i dg e # 3 27
28 Junction #2 From Betara Jetty Need to be removed Need to be removed Need to be removed Need to be removed T Junction Mitigation : Need to remove Action : TBA
29 Junction #2 From Batara Jetty Maneuver simulation for cargo with length 21 meter
4. Type Of Transport/ Load Distribution by multi Axles 6 Axles
4. Type Of Transport/ Load Distribution by multi Axles 9 Axles
4. Type Of Transport/ Load Distribution by multi Axles 12 Axles
5. Tentative stowage plan On Barge
5. Tentative stowage plan On Barge
5. Tentative stowage plan On Barge TENTATIVE STOWAGE PLAN BRAGE 230FT SINGAPORE-BETARA JETTY
6. Flow of Operation Staging Cargo on Suport at Temporary Storage area Receiving Cargo at Factory BBI Pasuruan (FOT) Roll OFF Cargo from Barge at Betara Barge Sailing from Pasuruan to Betara Jetty Transport from Factory to Jetty Roll ON Cargo to Barge Staging Cargo on Support Transport Cargo By Multi Axle A. Cargo from Pasuruan
Staging Cargo on Suport at temporary Storage area Receiving Cargo at Factory Ciwandan Roll OFF Cargo from Barge at Betara Barge Sailing from Ciwandan to Betara Jetty Transport from Factory to ciwandan port Roll ON Cargo to Barge Staging Cargo on Support Transport Cargo By Multi Axle B. Cargo from Ciwandan 6. Flow of Operation
Staging Cargo on Suport at Storage area Receiving Cargo from Singapore on Betara Jetty Jacking Cargo on Barge Insert Multi Axle Under GEG Roll of Cargo from Barge Transport Cargo By Multi Axle C. Cargo from Singapore 6. Flow of Operation
B. Insert Multi Axle Under H-Beam 6. Method and Handling Operation
6. Method and Handling Operation A. Jacking up cargo on deck barge for Gas Engine Generator
D. Temporary Storage 6. Method and Handling Operation
C. Transport GEG by Multi Axle 6. Method and Handling Operation
C. Roll off from barge 6. Method and Handling Operation Barge Barge OR