Metode pengiriman cargo heavy menuju lokasi (site)

kidykids 152 views 44 slides Jul 15, 2024
Slide 1
Slide 1 of 44
Slide 1
1
Slide 2
2
Slide 3
3
Slide 4
4
Slide 5
5
Slide 6
6
Slide 7
7
Slide 8
8
Slide 9
9
Slide 10
10
Slide 11
11
Slide 12
12
Slide 13
13
Slide 14
14
Slide 15
15
Slide 16
16
Slide 17
17
Slide 18
18
Slide 19
19
Slide 20
20
Slide 21
21
Slide 22
22
Slide 23
23
Slide 24
24
Slide 25
25
Slide 26
26
Slide 27
27
Slide 28
28
Slide 29
29
Slide 30
30
Slide 31
31
Slide 32
32
Slide 33
33
Slide 34
34
Slide 35
35
Slide 36
36
Slide 37
37
Slide 38
38
Slide 39
39
Slide 40
40
Slide 41
41
Slide 42
42
Slide 43
43
Slide 44
44

About This Presentation

metode pengiriman barang menggiunakan multi axle dari jakarta menuju jambi


Slide Content

Transportation Plan JADESTONE ENERGY (LEMANG) Akatara , Jambi Method Statement Proposal of Transport / Handling by Trans Marpinggan

Table Of Content Equipment List Packing List Route Plan Type Of Transport / Load Distribution (6 axles, 9 axles,12 axles) Tentative stowage plan Method and Handling Similar Experience

Heavy Lift Transport / Handling 12 Axles (1 unit) FH 16 F 12 Scania 1. EQUIPMENT LIST 10 Axles (2 units)

Heavy Lift Transport / Handling List Equipment Jacking and Sliding 1. EQUIPMENT LIST

1. EQUIPMENT LIST Ship Particular

2. Cargo List A. Pasuruan B. Ciwandan C. Singapore

3. Route Plan S i t e L o c a t i o n B e t a ra Jetty C oo rdi n ate L o ca t ion Akatara Site 0°59'24.20"S - 103°20'0.48"E Betara Staging Port 1°0’20.84"S - 103°23’01.91"E 3 rd Junction 2 nd Junction Tru ss B ri dge Distance Transport duration times Lowest Vertical Obstacle Transport Route : 11 Km. : 3 Hrs (Estimated) : 5,2 m (Sei Teluk Serdang Bridge). : Betara Jetty – Jl. Lintas Kuala Tungkal Jambi – Jl. Parit Lapis – Akatara Site. Kuala Tungkal Jambi 1 st Junction 3

Bridge and Obstacle

Betara Staging area Name of jet ty : Betara St ag i n g P o rt. Jett y o wn er Jetty d ims Jetty De pth Coo rdi n ate : Petrochina International Jabung Ltd. : - Berthing Position (21m x 8m). Beaching Position (13 x 10,5m). : - 1,5m for Beaching area. 2,5m for Berthing area. : 1°0’20.84"S - 103°23’01.91"E. Estuary Beaching Jetty Alongside Jetty

Betara Staging area

Berthing position / Alongside Jetty Dimension : Length 21m x Width 8m. Depth : 2,5m Jetty Hei gh t : 1, 5 m Betara Staging area

Beaching position D i m ens i on Depth J e t t y H e i ght : 13,5m x 10,5m. : 1,5m. : 1,6m. Berthing position / beaching position Dimension : Length 21m x Width 8m. Depth : 2,5m Jetty Hei gh t : 1, 5 m Betara Staging area

Temporary Stagging Area 5000 M2

Plan Position Storage area Barge Position

Storage Overview

Storage Overview

Storage Overview

Stool-elephant leg

B e t ara S t a g ing P o r t 9 m 19

Gate B e t ara S t a g ing P o r t 20

Junction #1 From Betara Jetty 21

B r i dg e # 1 Bridge #1 Dimension : Length 1 2 m x Width 4,5m. Type Bridge : Steel beam and Pipe Bridge. Total Span : 1 Span. Mitigation Plan Need Cover Bridge by Steel Plate 22 Cover by steel plate

B r i dg e # 1 23

B r i dg e # 2 Bridge #2 Dimension : Length 7, 5 m x Width 4,5m. Type Bridge : Steel beam and Pipe Bridge. Total Span : 1 Span. Mitigation Plan Need Cover Bridge by Steel Plate Cover by steel plate

B r i dg e # 2

B r i dg e # 3 NN Bridge #3 Dimension : Length 8 ,4 m x Width 8 m. Type Bridge : Steel beam and Pipe Bridge. Total Span : 1 Span. Mitigation Plan Need covered by steel false bridge for Modular trailer configuration passing this bridge . Cover by steel plate

B r i dg e # 3 27

28 Junction #2 From Betara Jetty Need to be removed Need to be removed Need to be removed Need to be removed T Junction Mitigation : Need to remove Action : TBA

29 Junction #2 From Batara Jetty Maneuver simulation for cargo with length 21 meter

4. Type Of Transport/ Load Distribution by multi Axles 6 Axles

4. Type Of Transport/ Load Distribution by multi Axles 9 Axles

4. Type Of Transport/ Load Distribution by multi Axles 12 Axles

5. Tentative stowage plan On Barge

5. Tentative stowage plan On Barge

5. Tentative stowage plan On Barge TENTATIVE STOWAGE PLAN BRAGE 230FT SINGAPORE-BETARA JETTY

6. Flow of Operation Staging Cargo on Suport at Temporary Storage area Receiving Cargo at Factory BBI Pasuruan (FOT) Roll OFF Cargo from Barge at Betara Barge Sailing from Pasuruan to Betara Jetty Transport from Factory to Jetty Roll ON Cargo to Barge Staging Cargo on Support Transport Cargo By Multi Axle A. Cargo from Pasuruan

Staging Cargo on Suport at temporary Storage area Receiving Cargo at Factory Ciwandan Roll OFF Cargo from Barge at Betara Barge Sailing from Ciwandan to Betara Jetty Transport from Factory to ciwandan port Roll ON Cargo to Barge Staging Cargo on Support Transport Cargo By Multi Axle B. Cargo from Ciwandan 6. Flow of Operation

Staging Cargo on Suport at Storage area Receiving Cargo from Singapore on Betara Jetty Jacking Cargo on Barge Insert Multi Axle Under GEG Roll of Cargo from Barge Transport Cargo By Multi Axle C. Cargo from Singapore 6. Flow of Operation

B. Insert Multi Axle Under H-Beam 6. Method and Handling Operation

6. Method and Handling Operation A. Jacking up cargo on deck barge for Gas Engine Generator

D. Temporary Storage 6. Method and Handling Operation

C. Transport GEG by Multi Axle 6. Method and Handling Operation

C. Roll off from barge 6. Method and Handling Operation Barge Barge OR

TERIMA KASIH