Metro Mentors details engineer Enterprise.pptx

sumittaisei77 23 views 14 slides Jun 21, 2024
Slide 1
Slide 1 of 14
Slide 1
1
Slide 2
2
Slide 3
3
Slide 4
4
Slide 5
5
Slide 6
6
Slide 7
7
Slide 8
8
Slide 9
9
Slide 10
10
Slide 11
11
Slide 12
12
Slide 13
13
Slide 14
14

About This Presentation

Metro Construction scope


Slide Content

INTRODUCTION :- Companies : Upcoming & Existing Infrastructure companies interested to take projects in Railway related Contracts as investment is increasing in Metro, Rapid Metro, Bullet Train, Dedicated Freight Corridors, Orbital railways, Station Redevelopments .

Problem From Companies Point of views - Companies don’t get easily qualified staffs having Knowledge of Metro Constructions works. As per contracts a special requirement of client that staff should work in Metro related projects with certain years of Experience.

Problem From Enginners Points of Views – The main reasons is that in our Engineering education system not a dedicated subject related with Metro construction ( Underground & Elevated) No Institute & Mentorship is available who dedicatedly guide them related with construction of Metro works .

Here comes the SOLUTIONS :- - Metros Mentors will help in educating the Non Metro Engineers & Fresh Engineers for increasing the knowledge related with Metro Construction .

Future of railways works Metro Future - Operational   Routes : 746.25 km Under Construction Routes : 475.32 km Approved Routes : 463.64 km Proposed Routes: 1045 km Bullet Train - Diamond Quadrilateral Proposed Routes: 7000 km

Future of railways works Dedicated Freight Corridor :- Total Proposed – 3700 KM Railway Redevelopment Projects :- Total – 508 No’s

WHY NEED To JOIN This Metro mentor Dedicated Course for Metro Construction Mentoring Salary is almost 1.3 Times to 1.5 Times more in Metro Construction At least 5000 Engineers are required in near future at Entry & Mid level. Metro Projects are mostly in Metro Cities , Tier 1 & Tier 2 Casting Yards are near to City for Bullet Train . Spend Quality time with Family in Cities One Project construction will take at least 3 to 4 Years As Highway , Dam , Power Plants and Industries are away of cities , there Quality family Time is less.

STEPS To Construct Elevated Metro Temporary Works Site Survey & Marking of Alignment Soil Survey Design Finalization Utilities Identifications & Shifting’s Building Conditions Survey Setup of Temporary Office , Batching Plants , Segment Casting Yards Permanent Works Piling works Pile Cap Pier Pier Cap Casting Of Segments ( Mould Making , Stressing, Shifting) Installation of Bearings ( Neoprene & Elastomeric) Erection of Segments ( Various type of Launcher) Station Constructions Interface & Services ( MEP) & Railway Track laying CMRS & Final handover

STEPS To Construct Under Ground Metro – Temporary Works Site Survey & Marking of Alignment Soil Survey Design Finalization Utilities identifications & shifting’s Building Conditions Survey Setup of Temporary Office , Batching Plants , Launching Shafts Permanent Works ( Station) Top Down Method ( Station Construction) D-wall , Excavation , Roof Slab , Concourse Slab , Base slab , Platform Slab Finishing , Interface of Services ( MEP) & Railway Track laying CMRS & Final handover

STEPS To Construct Under Ground Metro Permanent Works ( Station) Bottom Up Method ( Station Construction) Piling works ( Secant Piles, Soldier piles, Rock Bolt & Shotcrete) Excavation ( Strut & Waller , Soil & Rock Anchoring) Base Slab , Retaining wall , Concourse Slab, Roof Slab, Finishing , Interface of Services (MEP) & Railway Track laying CMRS & Final handover TUNNELING WORKS NATM TBM – ( EPBM, Rock TBM , Mix Soil TBM)

Elevated Metro Final Station

STEPS TO DEVELOPE METRO ENGINEER (1) RAW ENGINEER (2) STUDY OF ELEVATED METRO WORKS (3) STUDY OF U.GROUND STATION WORKS (4) METRO EXPERT

Vision:- Next Two years our aim is to develop thousands of Engineers who are able to work in Upcoming Railway related works in India & Abroad by filling up the gap between Requirements & Availability .