For - Mr./Ms.
GOLD PACKAGE
MR : VAMSI
LOCATION :
C,V RAMAN NAGAR
COMPOUND WALL
INCLUDED
PLOT DIAMENSION
1400SQFT
BUILT-UP AREA
3300SQFT
PROJECT TYPE:
RESIDENTIAL(G+2)
TOTAL COST : 59,45,000
DESIGN & DRAWINGS
CIVIL WORKS
✓2D Floor Plan and 3D Elevation
✓Complete Architectural Designs
✓Structural Design as per IS Code
✓Electrical & Plumbing Layouts
✓Floor to Floor Height 10.5 Feet
✓Steel (500/550 TMT bars) –Sunvik or Meenakshi or Bhuwalka or Kamadhenu or
Equivalent
✓Cement (Grade 53 Pillar and Slab) Birla Shakti or Dalmia or Equivalent
✓Sand -Double Washed M sand & P Sand
✓Concrete –M20 grade RMC
✓Walls -Solid block Walls –6” & 4” thickness
✓UG Sump –Solid blocks wall with waterproof plastered with capacity of 2500 litres/1000
sqftof built up area
✓Living, Kitchen, Dining, Bedrooms & Others -Vitrified of Choice of Up to Rs.70/-sqft
✓Staircase -Granite of Rs.100/-Sqft
✓Balcony & parking -Antiskid Tiles of Up to Rs.50/-sqft
✓Bathroom Walls -Tiles of Up to Rs.50/-sqft up to 7 Feet Height
✓Bathroom Floor-Antiskid Tiles of Up to Rs.50/-sqft
✓Kitchen Dado -2 Feet height above countertop -Rs.50/-sqft
✓Kitchen Counter Slab -Granite of Rs.100/-sqft
✓Tiles can be chosen from Kajariaor SomanyOr Equivalent
✓Water Proofing -Dr.Fixit or Fosroc
FLOORING & TILES
✓Kitchen sink with accessories -SS (ISI Mark) Products Up to Rs.6,000/sqft
✓Kitchen Sink faucet -ISI Mark Products
✓CP & Sanitary Fittings -ISI Mark Products up to Rs.40,000/-
✓Utility Sink & accessories -Make Kaff or Franke or Futura or equivalent up to` Rs 6,000/-
FITTINGS
FITTINGS
✓Kitchen sink with accessories -SS (ISI Mark) Products Up to Rs.5,000/sqft
✓Kitchen Sink faucet -ISI Mark Products
✓CP & Sanitary Fittings -ISI Mark Products up to Rs.40,000/-of ParrywareOr Hindware
or Jaquarmake
DOOR & WINDOWS
✓Percentage of opening for Doors & Windows -18% of built up area maximum
✓Main Door -Teak Wood frame & shutter including hardware –Rs.25,000/-per Door -
Frame of thickness 5"X3"
✓Puja Door -Teak Wood frame & shutter including hardware Rs.15,000/-per Door
✓Internal Door -Sal wood frame & flush shutter including hardware Rs.8,000/-per Door
✓Bathroom Door -Frame & shutter including hardware –Rs.6,000/-per door
✓UPVC windows –5mm clear glass with MS Grills, Basic price: with MS grill –Rs.550/-per
Sqft
✓MS Gate -
FABRICATION
✓MS Gate -Up to Rs.450/-sqft
✓External Staircase & Balcony Railing -MS Gate Up to Rs.250/-sqft
✓Indoor Staircase -SS Railing with glass Up to Rs.350/-sqft Kitchen Utility Safety Grills -
MS Grill Up to 150 Sqft of Area
PAINTING
✓Internal wall & Ceiling –wall putty + primer coat + Tractor Emulsion brand Asian or Berger
✓External walls –primer coat + ACE weather proof paint brand Asian or Berger
✓MS Gate -Up to Rs.400/-sqft
✓External Staircase & Balcony Railing -MS Gate Up to Rs.160/-sqft
✓Indoor Staircase -SS Railings Up to Rs.280/-sqft
✓Kitchen Utility Safety Grills -MS Grill Up to 100 Sqft of Area
FABRICATION
✓Internal wall & Ceiling –wall putty + primer coat + Tractor Emulsion brand Asian or
Berger
✓External walls –primer coat + ACE weatherproof paint brand Asian or Berger
PAINTING
ELECTRICAL
✓Wires (Fire Proof) -Copper wire –Anchor or Equivalent
✓Switches & Switch Board -CONA/HIFI or equivalent
✓UPS Provision -Included
✓CCTV -Provision included
PLUMBING
FRONT ELEVATION
STRUCTURAL
WARRANTY
✓CPVC & PVC pipes -Supreme or Equivalent
✓OHT -1,000 Liters
✓10YEARSOFWARANTY
✓0.5% of the Project Cost
CLIENT & PARTNERS
TERMS & CONDITIONS
❖All prices mentioned above are inclusive of taxes
❖Any other taxes if levied by Central/State Government/Local Authorities shall be borne by the owner
❖Actual Built-up area/ Cost will be based on as per the floor plan finalized
❖Rates are calculated for works under the slab; any additional work is at additional cost
❖All laisoning fees and charges to the respective bodies to be borne by the client
❖Structure: The foundation shall be as per the structural drawings
❖Water and electricity necessary for & during the period of construction shall be provided by the
owner
❖Cost has been arrived assuming natural earth in excavation. If any concrete structure, stone, rock
slush or any other obstacle during the excavation which may require additional effort to dismantle
or handle, would cost additional to this quote
❖Handling of any unforeseen issues if arisen with neighbours, statutory bodies is the scope of the
owner.
❖Any additional work which has not been included in the quote, will be taken up as per the listed
price and applicable service charges
❖No of Toilets considered is limited to 2 Nos & Kitchen/Utility is 1 No per 1,000 Sft
TERMS & CONDITIONS
❖All statutory bodies like BBMP, BESCOM, BWSSB Including deposit & Bill Amount shall be the
responsibility of the owner
❖The payment shall be made as per the payment schedule in the Agreement
❖The area of the building shall be measured from outer to outer edge of the roof slab for all the floors
❖Plan sanction charges shall be borne by the owner
❖The building structure would be under warranty for 10 years
❖Age related cracks will not be covered under warranty, warranty invalid if alterations done
❖For the validity of the Quotation, the Agreement to be signed within 30 days from the date of booking,
if not the quote shall be null and void
❖The site and the road level are considered same for calculations, any difference and backfilling would
be at additional cost
❖Extraordinary excavation conditions like rock or loose soil will attract additional cost
❖Costs are calculated based on the assumption that space would be made available for labour shed and
storage. Any small quantity procurement will attract additional costs
TERMS & CONDITIONS
❖The packages are calculated considering the base price of raw materials
❖The pricing and specifications are calculated considering a minimum built up area of 1000 sqft per floor
❖Rates have been calculated considering the soil bearing capacity of minimum SC of 180 KN/M2 rates
could change as per the decrease in the SBC