New Microsoft PowerPoint Presentation.pptx

munirHussain41 7 views 23 slides Jul 10, 2024
Slide 1
Slide 1 of 23
Slide 1
1
Slide 2
2
Slide 3
3
Slide 4
4
Slide 5
5
Slide 6
6
Slide 7
7
Slide 8
8
Slide 9
9
Slide 10
10
Slide 11
11
Slide 12
12
Slide 13
13
Slide 14
14
Slide 15
15
Slide 16
16
Slide 17
17
Slide 18
18
Slide 19
19
Slide 20
20
Slide 21
21
Slide 22
22
Slide 23
23

About This Presentation

Overall Progress


Slide Content

Construction of Blacktopped Roads in Gwadar & Lasbela Progress Report as of 13th June 2024 Presented by: Cameos Consultant

Purpose: Update on the construction progress of blacktopped roads in Gwadar and Lasbela. Total Projects: 22 roads with a combined length of 110.87 km. Introduction

No. Name of Road Length (KM) 1 AHMED KHAN JAMALI TO JUMA KHAN JAMALI LOHI 13.525 2 SORH ROAD FROM JAMIA MASJID TO HASSAN CHUTTA VILLAGE 8.325 3 COASTAL HIGHWAY TO SERKI VILLAGE 25.000 4 COASTAL HIGHWAY TO CHUR BANDAR 11.680 5 COASTAL HIGHWAY TO SHATANGI 2.800 6 KALMAT LINK ROAD TO LANDING SITE ISPIAK 5.620 7 KAPARA KARELA TO LANDING SITE 4.500 8 SANARI BADOK ROAD TO LANDING SITE 2.800 9 GANZ LINK ROAD TO GANZ DEEDAG MOUNTAIN 2.450 10 COASTAL HIGHWAY TO PANWAN 1.975 11 LOHI TO DUREJI 13.500 12 KALMAT GORESUNT ROAD 4.150 13 LANDING SITE TO MAIN ROAD GADDANI 2.023 14 SAPAT ROAD LASBELA 1.700 15 UMAR GOTH DANDA BELA 2.285 16 BARA BAGH ROAD TO HAJI MOOSA GOTH BELA 1.970 17 BURYA MUHAMMAD ISHAQ GOTH BELA 1.155

Details Status Total Length 11.68 km Project Start Date November 2023 Highway Works Clearing & Grubbing Completed Embankment 8 km Sub-base Course 6 km Aggregate Base & Surfacing Not Started Structures Works Pipe Culverts 22/36 Box Culverts 3/8 Gazebo 0/2 Parking 0/1 Ancillary Work Not Started Causeways Not Started Physical Work Progress 35% Progress Summary - Coastal Highway to Chur Bandar

Details Status Total Length 2.80 km Project Start Date November 2023 Highway Works Clearing & Grubbing Completed Embankment Completed Sub-base Course Completed Aggregate Base & Base Course Completed Surfacing In Progress Structures Works Pipe Culverts 8/8 Box Culverts 1/1 Physical Work Progress 80% Progress Summary - Coastal Highway to Shatangi

Details Status Total Length 5.62 km Project Start Date November 2023 Highway Works Clearing & Grubbing Completed Embankment Completed Sub-base Course Completed Aggregate Base & Base Course Completed Surfacing Completed Structures Works Pipe Culverts 8/8 Box Culverts 7/7 Parking 1/1 Ancillary Work In Progress Physical Work Progress 99% Progress Summary - Kalmat Link Road to Landing Site Ispiak

Details Status Total Length 4.50 km Project Start Date November 2023 Highway Works Clearing & Grubbing Completed Embankment 3 km Sub-base Course 500 m Aggregate Base & Surfacing Not Started Structures Works Pipe Culverts 0/32 Box Culverts 0/6 Gazebo 0/2 Parking 0/1 Ancillary Work Not Started Causeways Not Started Physical Work Progress 24% Progress Summary - Kapara Karela to Landing Site

Details Status Total Length 2.80 km Project Start Date November 2023 Highway Works Clearing & Grubbing Completed Embankment 1.5 km Sub-base Course In Progress Aggregate Base & Surfacing Not Started Structures Works Pipe Culverts 0/10 Box Culverts 0/4 Gazebo 0/2 Parking 0/1 Ancillary Work Not Started Causeways Not Started Physical Work Progress 22% Progress Summary - Sanari Badok Road to Landing Site

Details Status Total Length 2.45 km Project Start Date November 2023 Highway Works Clearing & Grubbing Completed Embankment Completed Sub-base Course 1 km Aggregate Base & Surfacing Not Started Structures Works Pipe Culverts 12/14 Box Culverts 0/5 Ancillary Work Not Started Causeways Not Started Physical Work Progress 32% Progress Summary - Ganz Link Road to Ganz Deedag Mountain

Details Status Total Length 1.975 km Project Start Date August 2023 Highway Works Clearing & Grubbing Completed Embankment Completed Sub-base Course Completed Aggregate Base & Base Course Completed Surfacing Completed Structures Works Pipe Culverts 4/4 Gazebo 1/1 Ancillary Work Completed Physical Work Progress 100% Progress Summary - Coastal Highway to Panwan

Details Status Total Length 13.5 km Project Start Date August 2023 Highway Works Clearing & Grubbing Completed Embankment Completed Sub-base Course Completed Aggregate Base & Surfacing In Progress Structures Works Pipe Culverts 43/43 Box Culverts 10/10 Causeways 5/5 Ancillary Work Not Started Physical Work Progress 45% Progress Summary - Lohi to Dureji

Details Status Total Length 8.3 km Project Start Date August 2023 Highway Works Clearing & Grubbing Completed Embankment Completed Sub-base Course 7 km Aggregate Base & Surfacing In Progress Structures Works Pipe Culverts 3/6 Box Culverts 12/20 Causeway In Progress Ancillary Work Not Started Physical Work Progress 45% Progress Summary - Jamia to Hassan Chutta Village

Details Status Total Length 25 km Project Start Date August 2023 Highway Works Clearing & Grubbing Completed Embankment 9 km Sub-base Course 7 km Aggregate Base & Surfacing Not Started Structures Works Pipe Culverts 22/37 Box Culverts 4/8 Retaining Walls 0/2 Parking 0/1 Ancillary Work Not Started Physical Work Progress 41% Progress Summary - Coastal Highway to Sirki Village

Details Status Total Length 4.150km Project Start Date November 2023 Highway Works Clearing & Grubbing Completed Embankment Completed Sub-base Course Completed Aggregate Base & Surfacing Completed Structures Works Pipe Culverts 3/3 Box Culverts 1/1 Parking 0/1 Ancillary Work Not started Physical Work Progress 70% Progress Summary - Kalmat Goresunt Road

Name of Road Total Length (KM) Physical Work Progress Landing Site to Main Road Gaddani 2.023 16% Sapat Road Lasbela 1.700 18% Umar Goth Danda Bela 2.285 17% Bara Bagh Road to Haji Moosa Goth Bela 1.970 21% Burya Muhammad Ishaq Goth Bela 1.155 15% Recent Projects Overview

Earth work damages Structure damages Damages

Use of clay in embankment construction Use of substandard roadside materials Earth work damages

1.Earthen Embankment Damages RD Wise S# Description Unit Length Width H/D Qty 1 RD 1+800 to 2+200 Cum 400 6.48 1.50 3888.0 2 RD 2+300 to 2+700 Cum 400 6.48 1.50 3888.0 3 Side Cutting Cum 4000 2.00 1.50 12000.0 4 RD 2+800 to 3+600 Cum 800 6.20 0.90 4464.0 5 RD 3+700 to 5+200 Cum 1500 4.00 0.75 4500.0 6 RD 7+400 to 7+950 Cum 550 6.20 0.60 2046.0 7 RD 8+000 to 12+200 Cum 4200 6.18 0.70 18169.2 Total Qty 48955.2 S# Description Unit Rate Qty Amount 1 Earthen Embankment Cum 464.1 48955 22,717,661 2.Sub Base Damages RD Wise S# Description Unit Length Width H/D Qty 1 RD 2+300 to 2+500 Cum 200 5.48 0.15 164.40 2 Cutting Erosion Cum 4000 4.00 0.15 2400.00 3 RD 2+800 to 3+600 Cum 800 5.48 0.15 657.60 4 RD 3+700 to 5+200 Cum 1500 5.00 0.15 1125.00 5 RD 7+400 to 7+950 Cum 550 5.48 0.15 452.10 6 RD 8+000 to 12+200 Cum 4200 5.48 0.15 3452.40 Total Qty 8251.50 S# Description Unit Rate Qty Amount 1 Sub Base Cum 1001 8251.5 8,259,752 2 Carriage Upto 5th KM Cum 138.4 1013.3 701,169   Total amount 8,960,921 .Earthen Embankment Damages

Structure Works Sr # Description Unit Qty Amount 1 RCC Box Culvert 4 Cell @ 2 Nos Lump sum 2 5,000,000 2 RCC Box Culvert 9 Cell @ 1 Nos Lump sum 1 2,500,000 3 Pipe Culvert Single Cell @ 32 Nos Lump sum 34 12,000,000 4 RCC Box Culvert 2 Cell @ 1 Nos Lump sum 1 3,000,000   Total amount 22,500,000   G.Total (1+2+3) 54,178,581 Structure damages

Flood (Feb 2024) Flood (March 2024) Damages Causes

Fuel Shortage Security reasons Flood Rain Delay causes

Replace inadequate materials with those meeting required specifications for durability and stability. Implement proper construction techniques and quality control measures. Construct wing walls promptly to protect embankments from erosion, ensuring they are designed and built according to engineering standards. Replace damaged wing wall sections with high-quality materials meeting durability and strength specifications. Ensure all materials meet specified standards and requirements. Verify quality, composition, and suitability before use. Implement a robust quality control process, including material testing and verification. Stop using substandard roadside materials and replace with high-quality fill materials meeting project specifications. Regularly monitor embankment condition and drainage performance to address settlement risks promptly Recommendations

Erosion and Sediment Control Dust Control Noise Control Water Quality Protection Waste Management Air Quality Control Environmental Control Plan for Road Construction