Project Overview Much-Needed Affordable Housing/Housing and Community-Oriented Design
221 apartment rental homes; including 19 affordable 4 stories Two-levels of underground parking; 384 parking spaces 294 bike parking stations 5,000 sq ft publicly accessible green and open space Much-Needed Affordable Housing/Housing and Community-Oriented Design Project Overview
Increasing the Number of Street Trees Our team will be removing 36 trees on the project site and replacing them with 102 new trees. Maximizing Benefits
Dedicating a Rideshare Drop-Off/ Pick Up Area Maximizing Benefits As a volunteered condition, a dedicated rideshare drop off/pick up located outside separate from the the street to preserve the path of travel.
Enhancing Walkability and Safety Clean up / design / installation of beautified landscaping Creation / improvement of sidewalks Installation of enhanced lighting Maximizing Benefits
Implementing Community-Sensitive Construction Measures: Parking Construction worker parking will be will be prohibited on residential streets around the project site Minimizing Impacts
Implementing Community-Sensitive Construction Measures: Pile Driving Reduction Minimizing Impacts Pile install is required for foundation support of the building. La Terra dedicated time and resources to redesign of the foundation to reduce the required number of piles from 100 to only 3. As a result, the pile driving is reduced to a 2-4 day construction process, while still maintaining the structural stability of the building.
Construction hours will comply with LAMC allowed hours indicated in their “Good Neighbor Construction Practices” guidelines We will collectively coordinate with neighbors to best attempt to schedule construction activity that may be intrusive to avoid early morning hours on Saturdays Implementing Community-Sensitive Construction Measures: Hours Minimizing Impacts
LADOT Preferential Parking LADOT Preferential Parking: Area Overview Above: Map of the community-proposed streets for the LADOT Preferential Parking District. Please note, this process will be initiated and lead by residents working in conjunction with LADOT
LADOT Preferential Parking: Process LADOT Preferential Parking