About This Presentation

Practical Surveying
Profile Cross-Section
1- Report number ,, 6,,,
2-Report name
Profile and cross –section leveling.
Procedure of profile:
1 - Specify the direction of the longitudinal section
(path section) by selecting the location of the station, which should be equal in distances (15, 20, 2...


Slide Content

Cross-Sections
profile
Practical Surveying

1-Report number ,, 6,,,
2-Report name
cross –section leveling.Profile and

Procedure of profile:
1-Specify the direction of the longitudinal section
(path section) by selecting the location of the
station, which should be equal in distances (15, 20,
25, and 50) m according the nature of the earth's
surface.

•2 -Start leveling process by leveling the
stations from known Bench markand this
process is closed in order to confirm the
accuracy of the survey process

Cross-Sections
•Sections at right angles to the centerline of a proposed or
existing project such as a road
•Scale 1/50 or 1/100 for both horizontal and vertical axes.

Cross-Sections

APPARATUS
1-Level instrument
2-tripod
3-staff
4-tape
5-pin
6-range pole

OBJECT
Longitudinal leveling is an operation of doing a
leveling job to determine .
The profile of a ground surface along a given line
this is generally the center line of purposed
Alignment .such as
Highway , railway ,pipeline , and sewerage
CROSS-SECTION
Of the project station for calculation (cut and fill )
Area –volume of earth.

CALCULATION
1-Grade A = Ground A
2-Grade B= grade (A) + Slope ×Distance(A & B)
3-Grade C=grade(A) + Slope ×Distance (A & C)
-
-

Sta B.S I.S F.S
Distance
H.I R.L Remark
Left Center Right
B.M1 1.3 51.3 50
T.P1
B.M2
0+00 1.7 0+00
1.9 5
2.3 10
2.1 5
1.5 10
0+25 2.0 0+25
2.3 5
2.5 10
1.4 5
1.2 10
T.P 3.4 0.7
0+50 0.5 0+50
1.0 5
1.8 10
2.4 5
3.1 10
B.M2 3.9

TABLE
Not
e
FillCutR.L
Grade
R.L
Ground
H.IRight
(m)
Center
(m)
Left
(m)
F.SI.SB.SST