Project sample internet cafe.pptxffffffgh

kidane16mihret1 6 views 26 slides Aug 19, 2024
Slide 1
Slide 1 of 26
Slide 1
1
Slide 2
2
Slide 3
3
Slide 4
4
Slide 5
5
Slide 6
6
Slide 7
7
Slide 8
8
Slide 9
9
Slide 10
10
Slide 11
11
Slide 12
12
Slide 13
13
Slide 14
14
Slide 15
15
Slide 16
16
Slide 17
17
Slide 18
18
Slide 19
19
Slide 20
20
Slide 21
21
Slide 22
22
Slide 23
23
Slide 24
24
Slide 25
25
Slide 26
26

About This Presentation

ssdgdgf


Slide Content

ICT C o C Sector: ICT HNS Level IV Project proposal for Internet Cafe Abren Endeg

ICT C o C ICT COC Level 3 HNS Create project proposal for internet café Abren Endeg Task 1- Planning and Organizing Project work

ICT C o C Contents Phases of the project Activities to be performed. Duration for each activity. Required man power and responsible body. Abren Endeg

ICT C o C 1 -: Phases of the project Abren Endeg

ICT C o C 2-: Activity to be performed Abren Endeg Analyze the existing LAN/WAN infrastructure of the organization. Prepare a proposal for the optimization / re organization and development of the data infrastructure:

ICT C o C Conti.. Abren Endeg Prepare training plan for IT staff for deployment and maintenance For IT support and Network Administrators

ICT C o C 3 -: Duration for each activity Abren Endeg This is containing in project phase in different time tables. 1, 1 day: - for surveying the project site and proposing 2, 5 days: - will be purchasing of devices and equipment’s 3, 7 days: - for Trucking 4, 6 days: - for Cabling 5, 3 days: - for Crimping 6, 9 days: - for Configuration of client and server

ICT C o C 4-: Required man power and Responsible body Abren Endeg Network technicians, Network Engineers, who assist man power for drilling the wall etc. 3 IT officers for crimping and installation and configuration 1 IT manager for the Management.

ICT C o C Abren Endeg Task2.Identifying Network and Internet Infrastructure resources Servers   Brand name of manufacture Capacity   Database Server Dell 8GB RAM. Application Server “ 8GB RAM. Mail Server “ 8GB RAM. Web server “ 8GB RAM.

ICT C o C Hardware needed to built the infrastructure Abren Endeg Servers Router rack switch patch panel Cables UTP CAT 6e , Fiber Network toolkits

ICT C o C Software needed to build the infrastructure Abren Endeg Microsoft exchange server 2010 or latest for centralized messaging system Kaspersky server-based antivirus for server virus protection Windows Server 2008, Windows 7, MS office 2010,SQL server.

ICT C o C Abren Endeg Task3:-Preparing Logical Design of an IT Infrastructure Solution

ICT C o C Abren Endeg

ICT C o C Abren Endeg Task4:-Assisting in Policy development of client support and maintenance There should be a permanent employee of It support officer who will maintain whenever the Network and hard ware failure occurs.

ICT C o C HNS Level II I training presentation for server configuration Abren Endeg

Server configuration training Contents requirements for configuration Install windows observation and check UP configure server window Abren Endeg

Server configuration training Conti… Create Ous , Groups, Users and Computers Join clients computer to the domain remote access share folders deny and allow users from accessing Saturday and Sunday Abren Endeg

Server configuration training Requirements for configuration Hardware : 3 computers, USB/CD ,3 UTP cable ,switch Abren Endeg Software: Windows , Drivers

Server configuration training Install Windows Install Window server on the Specified server Computer Abren Endeg Install windows 7 on clients computer

Server configuration training Observation and checkup check all physical connections and drivers Abren Endeg T est the UTP cable

Server configuration training Configure server Window 1 Assign IP address for server Pc Abren Endeg 2 Name the server computer eg Misrakk001 3 Install AD and promote it by using the command DCPROMO 4 Install DHCP with the given IP address scopes

Server configuration training Create Ous , Groups, Users and Computers Abren Endeg Active Directory domain users and computers

Server configuration training Join clients computer to the domain Abren Endeg Name the clients computer by the given name and the Domain Eg computer name Misrak -Textile and Domain name COC.LOCAL

Server configuration training Remote access Abren Endeg Install Remote desktop services and enable remote setting on server computer Enable remote setting and access the server pc remotely on clients computer

Server configuration training Share Folder Abren Endeg create folder on server PC and share for users with permission Access the shared folder on clients pc

Server configuration training Deny users from accessing Saturday and Sunday Abren Endeg Go to server pc AD and manage users logon hours