ALLOW TO REMOVE
EXISTING SCREENS AND
MAKE GOOD TO WALLS &
FLOOR.
ALLOW TO STRIP OUT ALL
EXISTING RAISED LEVEL
AND MAKE GOOD TO
AFFECTED AREAS. ALLOW
TO MAKE GOOD FLOOR
READY TO RECEIVE NEW
FLOOR FINISH.
RETAIN EXISTING SERVICE
DUCT AND STUDWORK.
ALLOW TO BUILD NEW
RECLAIMED BRICKWORK
WALLS AS SHOWN.
ALLOW TO FORM NEW
STUDWORK WALLS AS
SHOWN, WITH SKIMMED
PLASTER FINISH.
ALLOW TO
CAREFULLY DEMOLISH
EXISTING WALL AS
SHOWN AND MAKE
GOOD.
ALLOW TO
CAREFULLY DEMOLISH
EXISTING WALLS AS
SHOWN AND MAKE
GOOD.
ALLOW TO REMOVE
EXISTING DOOR &
FRAME AND MAKE
GOOD.
ALLOW TO FORM
NEW STUD WALL AS
SHOWN, SKIMMED
PLASTER FINISH.
ALLOW FOR NEW
DOORWAY.
ALLOW TO FORM
NEW STUDWORK
WALLS AS SHOWN,
SKIMMED PLASTER
FINISH.
ALLOW TO CAREFULLY
REMOVE EXISTING
COLUMN AND MAKE
GOOD.
ALLOW TO CAREFULLY REMOVE EXISTING
COLUMN AND MAKE GOOD.
ALLOW TO REMOVE ALL
EXISTING BAR SERVERY
AND MAKE GOOD TO
AFFECTED AREAS.
APPROXIMATE
POSITION OF NEW
WHB, ALLOW FOR
CONNECTION INTO
DRAINAGE RUN.
ALLOW TO REMOVE ALL
EXISTING BAR SERVERY
AND MAKE GOOD TO
AFFECTED AREAS.
ALLOW TO REMOVE ALL EXISTING
BAR SERVERY AND MAKE GOOD
TO AFFECTED AREAS.
NEW BAR SERVERY AND
BACKFITTING, REFER TO
DWGS 07 & 08.
NEW SCREEN, REFER
TO DWG 010.
NEW SCREEN, REFER
TO DWG 010.
NEW PLINTH, REFER
TO DWG 010.
NEW PLINTH,
REFER TO DWG
010.
NEW SCREEN REFER TO
DWG 010. ALLOW TO
FORM 2NO. NEW
STUDWORK PIERS AS
SHOWN.
NEW PLINTH, REFER
TO DWG 010.
ALLOW TO
REMOVE
EXISTING
SCREEN AND
MAKE GOOD.
NEW PLINTHS, REFER
TO DWG 010.
ALLOW TO FORM NEW
STUDWORK NIB FOR NEW PLINTHS,
REFER TO DWG 010 FOR DETAILS.
ALLOW TO
REMOVE
EXISTING
SCREEN AND
MAKE GOOD.
NEW
SCREEN,
REFER TO
DWG 010.
ALLOW TO
REMOVE
EXISTING
SCREEN AND
MAKE GOOD.
NEW SCREEN AND
DRINKSHELF,
REFER TO DWG
010.
NEW ATM
ENCLOSURE REFER
DRAWING No 11
ALLOW TO
REMOVE
EXISTING
SCREEN AND
MAKE GOOD.
ALLOW TO INFILL GAP WITH
STUDWORK, SKIMMED
PLASTER FINISH.
ALLOW TO
FORM NEW
COLUMN FROM
BRADSTONE.
NEW SCREEN,
REFER TO DWG
010.
ALLOW TO DEMOLISH
SECTIONS OF EXISTING
COLUMNS AS SHOWN
AND MAKE GOOD.
NEW SCREENS, REFER
TO DWG 010.
ALLOW TO REMOVE
EXISTING NIB AND
MAKE GOOD.
NEW SCREEN,
REFER TO DWG
010.
ALLOW TO
REMOVE
EXISTING
SCREEN AND
MAKE GOOD.
NEW SCREEN,
REFER TO DWG
010.
ALLOW TO
REMOVE
EXISTING
SCREEN AND
MAKE GOOD.
NEW SOLID STUD
WALL PREPARED TO
RECEIVE NEW DECS
ALLOW TO REMOVE
EXISTING SCREEN AND
MAKE GOOD.
ALLOW TO FORM NEW
STUDWORK WALLS AS
SHOWN WITH SKIMMED
PLASTER FINISH.
NEW SCREENS,
REFER TO DWG
010.
NEW PLINTH, REFER
TO DWG 010.
ALLOW TO FORM NEW STUDWORK
NIB FOR NEW SCREEN & PLINTH, REFER
TO DWG 010 FOR DETAILS.
NEW SCREEN,
REFER TO DWG
010.
ALLOW TO CAREFULLY
DEMOLISH EXISTING WALLS
AS SHOWN, MAKE GOOD
TO AFFECTED AREAS.
NEW SCREEN,
REFER TO DWG
010.
ALLOW TO
FORM NEW
COLUMN FROM
BRADSTONE.
ALLOW TO FORM
NEW COLUMN
FROM BRADSTONE,
TO ENCLOSE NEW
STRUCTURAL STEEL
ALLOW TO
CAREFULLY
DEMOLISH EXISTING
WALL AS SHOWN
REMOVE DOOR &
FRAME, MAKE
GOOD TO
AFFECTED AREAS.
ALLOW TO FORM
NEW STUDWORK
WALLS AS SHOWN,
SKIMMED PLASTER
FINISH.
NEW SCREENS,
REFER TO DWG
010.
ALLOW TO STRIP
OUT EXISTING
BATHROOM AND
CAP OFF EXISTING
SERVICES,
CAREFULLY
DEMOLISH EXISTING
WALLS AS SHOWN
AND MAKE GOOD.
ALLOW TO INFILL
REDUNDANT
DOORWAY WITH
NEW STUDWORK,
SKIMMED PLASTER
FINISH.
ALLOW TO FORM
NEW STUDWORK
COLUMN AS
SHOWN, SKIMMED
PLASTER FINISH.
ALLOW TO DEMOLISH EXISTING WALLS
AND SERVICE DUCT AS SHOWN.
ALLOW TO RE-ROUTE SERVICES.
ALLOW TO FORM
NEW WALL FROM
BRADSTONE
STONEWORK.
NEW SCREEN,
REFER TO DWG
010.
NEW PLINTH,
REFER TO DWG
010.
ALLOW TO DEMOLISH
EXISTING SCREEN & WALLS
AND MAKE GOOD. REROUT
EXISTING SEVICES INTO NEW
STUD WALL
ALLOW TO INFILL REDUNDANT DOORWAY
WITH STUDWORK, SKIMMED PLASTER FINISH.
ALLOW TO REMOVE
EXISTING DOOR &
FRAME AND MAKE
GOOD
ALLOW TO FORM NEW
STUDWORK WALLS AS
SHOWN, SKIMMED PLASTER
FINISH.
FOR TOILET DETAILS REFER
TO DWG 012.
ALLOW TO FORM
NEW OPENING
THROUGH, MAKE
GOOD FOR NEW
DOOR.
ALLOW TO
FORM NEW
OPENING
THROUGH,
MAKE
GOOD FOR
NEW DOOR.
ALLOW TO REPLACE
EXISTING GLAZING WITH
NEW OBSCURE
GLAZING.
ALLOW
TO FORM
NEW
WALLS IN
STUDWORK
AS
SHOWN.
ALLOW TO
DEMOLISH EXISTING
WALLS AS SHOWN &
MAKE GOOD.
NEW SCREENS,
REFER TO DWG 010.
ALLOW TO FORM
NEW WALLS IN
STUDWORK AS
SHOWN.
ALLOW TO STRIP OUT ALL
REDUNDANT
SANITARYWARE AND CAP
OFF REDUNDANT SERVICES.
ALLOW TO STRIP OUT ALL
REDUNDANT
SANITARYWARE AND CAP
OFF REDUNDANT SERVICES.
ALLOW TO REMOVE
EXISTING SCREENS &
MAKE GOOD.
ALLOW TO DEMOLISH
EXISTING WALLS AS
SHOWN & MAKE GOOD.
NEW SCREEN,
REFER TO DWG 010.
ALLOW TO STRIP
OUT ALL
REDUNDANT
SANITARYWARE
AND CAP OFF
REDUNDANT
SERVICES.
ALLOW TO
REMOVE EXISTING
SCREENS & MAKE
GOOD.
NEW PLINTHS, REFER
TO DWG 010.
NEW STUDWORK WALLS AS
SHOWN, SKIMMED PLASTER
FINISH.
NEW SCREEN, REFER
TO DWG 010.
ALLOW TO FORM
2NO NEW
RECLAIMED
BRICKWORK PIERS
AS SHOWN.
NEW PLINTH, REFER
TO DWG 010.
NEW SCREEN,
REFER TO DWG 010.
NEW POSEUR
DINING SHELF, REFER
TO DWG 011.
FOR TOILET DETAILS
REFER TO DWG 012.
ALLOW TO REMOVE
EXISTING SCREEN &
MAKE GOOD.
NEW FIREPLACE,
REFER TO DWG
013.
ALLOW FOR NEW 100mm UPVC PIPES
CONNECTED INTO ALL NEW SANITARYWARE
INTO NEW STUB STACK WITH AIR ADMITANCE
VALVE. ALLOW FOR NEW EXTERNAL BELOW
GROUND DRAINAGE TO EXISTING MANHOLE.
(SUBJECT TO SITE INSPECTION)
NEW DRAINAGE AS
PER NOTE ABOVE.
EXISTING FIRE ESCAPE
RETAINED, ALLOW TO
REPLACE EXISTING
DOORS.
ALLOW TO REPLACE
EXISTING GLAZING WITH
NEW OPAQUE GLAZING
TO DESIGNERS
APPROVAL.
REMOVE DOOR
AND BLOCK UP
EXISTING OPENING,
PREPARE TO
RECEIVE NEW DECS
REMOVE DOOR
AND BLOCK UP
EXISTING OPENING,
PREPARE TO
RECEIVE NEW DECS
RETAIN EXISTING WINDOW, REGLAZE
WITH BLACK GLASS. BLOCK UP
INTERNALLY WITH STUD FRAME AND
PB CLADDING. SKIM ENTIRE WALL IN
PREP FOR NEW DECS
NEW CABINETRY
REFER DRAWING No11
NEW STUD WALLS TO
COMPLETELY
ENCLOSE NEW
STRUCTURAL STEEL
COLUMNS AS PER
ENGINEERS SPEC
CONSTRUCT NEW
FEATURE LOG STORE IN
STUD FRAME AND
PLASTERBOARD CLAD
WALLS TO RECEIVE
SKIM AND DECS.
SINGLE HEIGHT BRICK
PLINTH AND 250mm
DEEP PB CLAD SOFFIT.
NEW WALLS TO
COMPLETELY
ENCLOSE NEW
STRUCTURAL STEEL
COLUMNS AS PER
ENGINEERS SPEC
GENTS
LADIES
DISABLED
WC
RED ROOM
BLUE ROOM
PURPLE ROOM
AREA 10
AREA 13
AREA 9
AREA 6
AREA 7
AREA 8
AREA 4
AREA 5
BROWN ROOM
BAR
BAR SERVERY
AREA 2 AREA 1
KITCHEN
LOBBY
KITCHEN
LIVING ROOM
ENTRANCE
AREA 11
AREA 12
AREA 4
AREA 6
BAR
LOBBY
ALLOW TO INFILL GAP WITH SW
FRAMEWORK CLAD IN
PLASTERBOARD SKIMMED AND
PAINTED FINISH TO MATCH
ELSEWHERE.
ALLOW TO FIT
SOLID ASH SHELF
TO REAR GAP
BEHIND FIXED
SEATING.
TIMBER STUD PARTITION-30 MINUTES
NEW PARTITION OF 89x38mm SW HEAD AND SOLE PLATES
WITH 89x38mm SW STUDS @ 600mm c\/c AND 89x38mm SW
NOGGINS @ 1200mm c\/c.FACE EACH SIDE WITH ONE LAYER
12.5mm GYPROC WALLBOARD PLASTERBOARD,JOINTS TO BE TAPED
FINISH WITH SKIM PLASTER TO RECEIVE DECORATION.
ACHIEVES HALF HOUR FIRE RESISTANCE.
WHERE RUN OF STUD PARTITION IS PARALLEL WITH JOIST
RUN ON TIMBER FLOOR EXPOSE FLOOR AND DOUBLE UP
JOIST UNDER.
FIRE PROTECTION-STEELWORK
PART F-VENTILATION
TOILETS:ELECTRICAL CONTRACTOR TO SUPPLY AND FIX
EXTRACT FAN WITH PLASTIC DUCTING AS REQUIRED TO TOILETS.
FAN TO BE SWITCHED TO TOILET LIGHTS AND TO ACHIEVE
3 AIR CHANGES PER HOUR.
TRADING AREA:MECHANICAL ENGINEER TO ADVISE UPON
PROVISION AND CAPACITY OF EXTRACT FANS.
KITCHEN:CATERING CONTRACTOR TO ADVISE UPON EXTRACTION
HOOD FOR COOKER AND VENTILATION FANS.
MANAGERS BATHROOM:ELECTRICAL CONTRACTOR TO SUPPLY
AND FIX EXTRACT FAN ,AND PLASTIC DUCTING AS REQUIRED
FAN TO BE PULL CORD OPERATED AND TO EXTRACTAT A RATE
OF 15 LITRES\/SECOND.
MANAGERS KITCHEN:ELECTRICAL CONTRACTOR TO SUPPLY
AND FIX EXTRACT FAN AND PLASTIC DUCTING AS REQUIRED.
FAN TO BE CORD OPERATED AND TO EXTRACT AT A RATE OF
60 LITRES\/SECOND.MAIN CONTRACTOR TO SUPPLY AND FIX
TRICKLE VENTILATOR FREE AREA MIN 4000mmSQ.
MAIN CONTRACTOR TO FORM OPENINGS INWALLS\/ROOFS FOR
FANS,TOGETHER WITH LINTELS,DPCS AND CAVITY TRAY.
NEW WINDOWS TO MANAGERS FLAT TO HAVE TRICKLE
VENTILATOR FREE AREA MIN 4000mmSQ.
PART N-GLAZING
NEW GLAZING TO DOORS TO BE OF 6mm TOUGHENED SAFETY
GLASS TO BS6206 1981, TO A MINIMUM HEIGHT OF 1500mm
REF TO DOOR SCHEDULE FOR FULL DETAILS
NEW GLAZING TO WINDOWS TO BE 6mm TOUGHENED SAFETY
GLASS AS BEFORE TO MIN HEIGHT OF 800mm
GLAZED SCREENS WITH LEADED GLASS TO BE BACKED WITH
SHEET OF TOUGHENED GLASS.
PART H-DRAINAGE ABOVE GROUND
PLUMBING SIZES:
WASHBASIN 40mm DIA 3M MAX RUN
SINK 50mm DIA 4M MAX RUN
BATH 50mm DIA 4M MAX RUN
SHOWER 50mm DIA 4M MAX RUN
WASHMACHINE 50mm DIA 4M MAX RUN
GLASSWASH 50mm DIA 4M MAX RUN
URINALS 50mm DIA 4M MAX RUN
PIPEWORK TO BE IN UPVC TO BS 4514.WASTE RUNS TO BE
CONNECTED TO 100mm DIA SOIL AND VENT STACK EXTENDED
UP MIN 900mm ABOVE ANY OPENING WITHIN 3M AND FINISHED
WITH BALLOON GRATE.
100mmSTUB STACKS TO BE FITTED WITH AN AIR ADMITTANCE
VALVE TO A BBA CERTIFICATE.
ALL APPLIANCES TO HAVE MIN 75mm DEEP SEAL TRAPS.
APPLIANCE WASTES TO BE TAKEN TO A TRAPPED GULLY IN
FLOOR \/GROUND, TO BE FITTED WITH A SEALING PLATE.
PART H-DRAINAGE BELOW GROUND
NEW DRAINAGE IN GROUND TO BE VITREOUS CLAY PIPEWORK
OF 100mm DIA LAID TO FALL 1:80 (UNLESS OTHERWISE NOTED
ON DRAWING).CLAY PIPES TO BS 85
PIPE WORK IN FLOOR TO HAVE MIN 150mm CONCRETE BED AND
WHERE PIPE PASSES THROUGH WALL OR FOUNDATION FORM
OPENING THROUGH AND LINTEL OVER.PIPE TO HAVE MIN 50mm
CLEAR SPACE AROUND.MASK EACH SIDE OF OPENING WITH RIGID
SHEETING AS RODENT BARRIER.
WHERE PIPE RUNS WITHIN 1M OF BUILDING FOUNDATION,ENCASE
PIPE WITH 150mm CONCRETE BED AND SURROUND TO LEVEL OF
FOUNDATION UNDERSIDE.
PIPE RUN IN OPEN GROUND TO HAVE MIN 150mm PEA GRAVEL
BED AND SURROUND.
NEW MANHOLES TO MIN INTERNAL SIZE OF 1200x750mm WITH
MIN 600x600mm COVER.EXACT SIZE AS DRAWING.
MANHOLES CONSTRUCTED OF 215mm SEMI-ENGINEERING
BRICKWORK TO BS 3921,BUILT OFF 150mm CONCRETE SLAB
WITH CONCRETE FLAUNCHING TO PIPEWORK.
INTERNAL PIPEWORK TO HAVE DOUBLE SEAL COVER WITH
NEOPRENE GASKET.COVER TO BE RECESSED TO ACCEPT FLOOR
PART M-DISABLED
REFER TO DRAWINGS FOR PROVISION OF ACCESS INCLUDING
MINIMUM DIMENSIONS OF LOBBIES AND RAMPS AND OF
PARTICULAR DETAILS TO HANDRAILS AND TACTILE
DISABLED TOILET TO DIMENSIONS SHOWN BELOW.
DEMOLITION
CONTRACTOR TO DEMOLISH EXISTING STRUCTURE AS INDICATED
BY BROKEN LINE.ALLOW FOR PROTECTION OF REMAINING FABRIC,
AND FOR TEMPORARY SUPPORT OF STRUCTURE AS REQUIRED BY
STRUCTURAL ENGINEER.CART AWAY DEBRIS AND MAKE GOOD TO
AFFECTED SURFACES.
PART B-FIRE NOTES
FIRE DOOR TO HALF HOUR FIRE RESISTANCE WITH
INTUMESCENT STRIPS AND COLD SMOKE SEAL BRUSHES.
FRAME \/LINING TO HAVE MINIMUM 38x15mm STOPS(FIXED
AT 300mm CENTRES MAX WITH COUNTER SUNK SCREWS
IF PLANTED).POSITIVE OVERHEAD DOOR CLOSER."FIRE
DOOR KEEP SHUT" NOTICE BOTH SIDES AT EYE LEVEL.
PANIC BOLT EMERGENCY DOOR IRONMONGERY,WITH"PUSH
BAR TO OPEN" NOTICE
H
S
HEAT DETECTOR
SMOKE DETECTOR
E
THREE HOUR NON-MAINTAINED EMERGENCY LIGHT FITTING.
BREAK GLASS FIRE ALARM CALL POINT.
"EXIT"
"EXIT,LEFT"
"EXIT,RIGHT"
"FIRE EXIT"
"FIRE EXIT,LEFT"
"FIRE EXIT,RIGHT"
ILLUMINATED 3 HOUR MAINTAINED
EMERGENCY EXIT SIGN.LEGENDS TO BE
TO BS 5499 PART 1 (THE GREEN MOVING
PERSON),EUROPEAN DIRECTIVE.
SURFACE SPREAD OF FLAME:WALLS AND CEILINGS TO BE
CLASS "0".CLASS "3" ITEMS(EG CURTAINS,DRAPES,TIMBER,
UPHOLSTERY ETC) TO BE UPGRADED TO CLASS"1" STANDARD
WITH PROPRIETRY TREATMENT TO A BBA CERTIFICATE
STANDARD.CONTRACTOR TO SUPPLY FIRE TEST CERTIFICATE
UPON COMPLETION OF TREATMENT.
NOTE THAT THE EXACT LOCATION OF EMERGENCY LIGHTING
AND DETECTORS SUBJECT TO FIRE OFFICERS REPORT.
PB
FD30S
VISION PANEL TO DOOR OF 6mm GEORGIAN WIRED POLISHED
PLATE GLASS,OR PILKINGTON "PYRAN" FIRE RESISTANT
GLASS,SET IN INTUMESCENT PUTTY WITH HARDWOOD BEADS.
VP
4.5kg DRY POWDER EXTINGUISHER
9 LITRE WATER EXTINGUISHER
1m FIRE BLANKET
ALL EXISTING EMERGENCY LIGHTING WHICH IS REMAINING TO
BE CHECKED AND CERTIFIED (QUALIFIED ELECTRICIAN) FOR
SERVICEABILITY
ALL EXISTING FD30S,AND FD60S FIRE DOORS TO BE CHECKED
FOR INTEGRITY ,IN PARTICULAR THE DOOR CLOSER AND
INTUMESCENT STRIP.
2
B
N6
N1
IP
FIRE ALARM INDICATOR PANEL
GENERAL FIRE NOTICE(FIRE
EVENT PROCEDURES)
"FIRE DOOR KEEP SHUT"NOTICE
N5 "FIRE DOORS KEEP CLEAR" NOTICE
AFFF FOAM EXTINGUISHER
CARBON DIOXIDE FIRE EXTINGUISHER
"FINAL FIRE EXIT"
"FINAL EXIT"
PROTECT STEELWORK WITH ONE
LAYER OF GYPROC 12.5MM FIRELINE
PLASTERBOARD FIXED TO GYPROC
Gyplyner "ENCASE" STEEL CLIP
SYSTEM FIXED IN ACCORDANCE WITH
MANUFACTURER'S INSTRUCTIONS.
WET CHEMICAL
wc
WHERE DOWNLIGHTERS ARE TO BE USED.
ALLOW FOR A SACRIFICIAL CEILING TO ALL AREAS OF CEILING
CEILING
ALLOW FOR AT LEAST 130-140mm DROP.
INTERIORS ARCHITECTURE
ADSDESIGN
3.The contractor is responsible for ensuring that all works comply with Local Authority
requirements and national regulations.
2.This drawing should be read in conjunction with relevant specifications and documentation
issued by ADS Design or third parties. the contractor is responsible for assimilating the
information and reporting descrepancies to ADS Design prior to commencement of works.
1.Do not scale from this drawing. All dimensions should be checked on site prior to
commencement of work or associated manufacturing.
JOB REFERENCE
DRAWING NUMBER
DRAWN
SHEET
DATE
SCALE
DRAWING TITLE
PROJECT
CLIENT
C
Copyright of this drawing is owned soley by ADS Design & Brand Development Ltd.This
document is confidential and as such its contents should be treated with the utmost care
and consideration, and in no circumstances should it be disclosed, distributed, published or
copied whether in part or in whole, without the prior consent of ADS Design and Brand
Development Ltd in writing.
ADS DESIGN & BRAND DEVELOPMENT
King John's Gallery, Mythe Road, Tewkesbury, GL20 6EB
Tel: +44 (0) 1684 851299 Fax: +44 (0) 1684 851298
email:
[email protected]
016
07041
Autocad2000\/
A1
Whitbread Plc.
Gateway, Eastleigh
1:50
June 07
Proposed Builders Work
B LOG STORE ADDED TO LOBBY. SCREENS IN
AREAS 12,4 & 9 AMENDED. 13\/7\/07KJA
A DISABLED WC LAYOUT REVISED, NEW
WINDOW IN AREA 5 OMITTED, EXISTING
RETAINED WITH WORKS, SCREEN IN AREA 13
REVISED TO INCORPORATE EXISTING
SERVICES DUCT, DOOR INTO FIRE EXIT
STAIRS BLOCKED UP, REVISIONS TO GENTS
WC.
11\/7\/07KJA
KJA19\/7\/07
AMENDMENT TO FIXED SEATING BY MAIN
ENTRANCE.
C