Condition of Public Transportation
Industry
1.Use of Defective and Unfit Vehicles
2.RecklessDriving
3.Non-compliance to Traffic Laws
4.RoadTrafficAccidents (RTA)
5.LimitedBusRoutes
6.Unorganized Fare Collection System
1. Use of Defective and Unfit
Vehicles
Presenceoflargenumberofdefectiveand
unfitvehiclesonthestreetisanalarming
issuefortheroadusers.Thepublicbuses
commonlyhavewornouttires,loosewheel
nuts,overloadedaxle,faultybreak,faulty
indicatorandheadlight,absenceofhorn,
refurbishedengineetc.AccordingtoBRTA
(2021),totalof4,79,320vehicleswithout
fitnesscertificatesarerunningonthe
streetsofDhaka.
Photo: The Daily Star, Jan 26, 2021
Condition of Road Transport
Infrastructure
1.Mixed Flow Operation
2.Inadequate Road Area
3.AbsenceofCyclelaneandPedestrianWalkway
4.Lack of Parking Facility
5.AbsenceofModalIntegration
6.Waterlogging
6. Waterlogging
Waterlogging is a very uniqueproblem faced
by the transportation system of Dhaka.
Mainly due to clogging of drains by improper
dumping of waste is the main reason behind
waterlogging on city streets. Besides,
improper cross-slope design and difficulty in
predicting rainfall amount while drainage
facility design are also responsible behind
this problem.
Photo: The Daily Star, July 20, 2020
Recommendation
1.Emphasizing on increasing fleet size of public transport.
2.Ensuringpropermanagement
3.Comprehensivefarestructure attained by implementing data driven cost models
4.Makingpublictransportssafe,reliable,accessible,modernandcomfortable.
5.Ensuring modal integrationbetweenwaterway, railway and land transport.
6.Building up the political goodwill
7.Revisionofroutestructures,vehicle schedules on bi-yearly basis.
8.Provision of lane for NMVT and proper walkway for pedestrians.
9.Encouraging people on walking and cycling by making infrastructural developments.
Ongoing Initiatives
Ongoing Initiatives
1.Improvement of pedestrian walkway
2.Highoccupancyarticulated and double
decker bus service
3.Commutertrainserviceconnecting
Dhakaandotherdistricts.
4.Construction of MRT and BRT.
5.Introduction of Water Bus/Taxi.
Components of BRT Project
1.Construction of 20.5 Km Road (1+1 BRT lane. 2+2 Mixed lane, NMT lane)
2.4.5 KM elevated section, 6 Flyover, 12 lane TongiBridge
3.114 link roads ,high-capacity drainage system and 10 kitchen markets
4.25 Station, 2 Terminal , 1 Depot
5.Rolling stock, ITS and Control center
Source:AsianDevelopment Bank (ADB)
BRTService Planning
Source: Dhaka Transport Coordination Authority -DTCA
Components of MRT Project
Source: Dhaka Transport Coordination Authority -DTCA
MRT
Implementation
Plan 2025
Source: Dhaka Transport Coordination Authority -DTCA
MRT
Implementation
Plan 2035
Source: Dhaka Transport Coordination Authority -DTCA
Future Plan
Circular
Waterway
Project
Challenges
1.Allocationoffund
2.Co-ordination between different government and non-government agencies
3.Landuseplanning
4.Engineering challenges
5.Integrated approachagainst traditional fragmented approach
6.Economical viability