Question Paper for 4M Change and Abnormal Condition
1. What do You Mean By 4M ?
A) Man , Machine , Material , Method
B) Man , Machine, Movement, Method
C) Machine , Material , Money , Man
D) Man , Muda , Material Machine
2. How much type of 4M ?
A) 4
B) 3
C) 1
D) 5
3. How much type of Criteria for 4M
A) 1
B) 2
C) 5
D) 6
4. What is A Process ?
A) A set of Activity which converts Input Material into Output Material
B) A System of Achieving Goals
C) A System of Converting
D) A tool used for identify causes
5. What is Planned Change ?
A) When We have information about any change within The Organization
B) A system for Monitoring OEE
C) A System for Monitoring Man
D) When We have information about any change within The Organization
6. What is Abnormal Condition ?
A) When We have information about any change within The Organization
B) When any Undesired condition occurs against defined Procedure , It is called Abnormal
Condition.
C) When We do not have information about any change within the organization , It is called
Unplanned Change
D) A set of Activity which converts Raw Material into Finished goods.
7. What do You mean by Method ?
A) The Method by which A product is being produced.
B) Who works in a process to manufacture a Use full Product
C) Raw Material which is being used for manufacture the Product
D) By Which a Product is being manufactured.
8. What is Objective of 4M Change Monitoring ?
A) To verify the process
B) To Return The Process to Normal before Safety System and Defects are Engaged
C) To Facilitate Resources
D) To Check Material for any Non Confirming
9. What is the Process Flow of Unplanned Change ?
A) Set-Up Approval – Start Production
B) Set-Up Approval – Start Production – Retro Active Checking
C) Raw Material – Slitting Process – Roll Forming – Packing – Dispatch
D) None of the Above
10. What is the Process Flow of Abnormal Condition ?.
A) Set-Up Approval – Start Production
B) Start Production – Identify Suspected Lot
C) Set-Up Approval – Start Production – Identify Suspected Lot
D) None of the Above
11. What is Our Process at GB Enterprises Pvt. Ltd.
A) Raw Material – Slitting Process – Roll Forming – Packing – Dispatch
B) Dispatch – Slitting Process – Packing – Roll Forming
C) Raw Material – Roll Forming – Dispatch
D) Packing - Dispatch
12. What do You mean by PDCA Cycle ?
A) Plan , Do, Check , Admission
B) Plan , Determination , Check , Act
C) Plan , Do, Check , Act
D) None of the Above
13. What is the Process Flow of Communication in case of any Abnormal Condition.
A) Operator – Incharge – Plant Head
B) Plant Head-Supervisor-Incharge
C) Operator – Supervisor – Incharge – Plant Head
D) None of the Above
14. “Does he follow standard” This Is example of which category of 4M ?
A) Material
B) Man
C) Machine
D) Method
15. “Is it a Method that ensures a Good Product” This Is example of which category of 4M ?
E) Material
F) Man
G) Machine
H) Method