RE developement of Bhindhi baazar

7,375 views 32 slides Aug 20, 2017
Slide 1
Slide 1 of 32
Slide 1
1
Slide 2
2
Slide 3
3
Slide 4
4
Slide 5
5
Slide 6
6
Slide 7
7
Slide 8
8
Slide 9
9
Slide 10
10
Slide 11
11
Slide 12
12
Slide 13
13
Slide 14
14
Slide 15
15
Slide 16
16
Slide 17
17
Slide 18
18
Slide 19
19
Slide 20
20
Slide 21
21
Slide 22
22
Slide 23
23
Slide 24
24
Slide 25
25
Slide 26
26
Slide 27
27
Slide 28
28
Slide 29
29
Slide 30
30
Slide 31
31
Slide 32
32

About This Presentation

Case Study of bhindi baazar


Slide Content

A CASE STUDY ON THE REDEVELOPEMENT OF BHINDI BAAZAR

Overview. Bhendi Bazaar is a market in South Mumbai. Bhendi Bazaar occupied an area between Mohammed Ali Road and Khetwadi . The bazaar is popular for shopping namely antique items, hardware items etc. Bhendi Bazaar is primarily a Muslim-populated area while Shop-owners and hawkers in this market belong to different religious groups. The area also houses Raudat Tahera , the mausoleum of the 51st and 52nd Dai-al- Mutlaq . The area is set to be redeveloped with the project being undertaken by Saifee Burhani Upliftment Trust .

Existing Images.

Location map.

Aerial view of site.

Overview. Bhendi Bazaar is of 16.5 acres which is divided in to 280 plots. It has more than 3500 residential tenants. 1250 shops. Which totals up to 245 buildings. *(existing site plan highlighting all the 6 mosques and mausoleum)

Need for Redevelopment. The bazaar is over 125-year-old, which is crumbling under poor infrastructure. In the past 3 years more than 170 people have died in 11 incident of building collapse. Unsatisfactory living condition for the tenants. (because of family expansion) Near to none public space for recreational purpose. Streets are Congested. illegal construction. The area lack basic utilities such as sewage treatments and proper ventilation.

Highlights of the Redevelopement . Bhendi Bazaar redevelopment project is also known as Saifee Burhani Upliftment Project. Its construction started in 2014 and is expected to be completed in 2025. Total budget of the re-development is 4000 crore. Demolition and Construction is taking place in 9 phases. The highly-dense market place will be the first cluster redevelopment project in the city. It is constructed on 16.5 acres on a no-profit and no-loss basis policy. They have started shifting people at transit camp at Mazgaon . At one time, 500 people can stay in this transit camp

Highlights of the Redevelopement . Some 100-150 chauls will be replaced by 17 high story residential buildings. Residents will get 350 sq ft of usable area in the new project, while commercial establishments will be given same existing area. The buildings designed to cut air-conditioning costs, lawns on all terraces and water recycling, The entire bazaar has only one tree but after redevelopment it will have 700. Width of the road is increased from 7 – 8M to 9 - 17.5M. The road that are at the boundary of the site are also widened. A new primary school is also planned Open area of half acres is also created.

Policy In 2009 Maharashtra state government came up with cluster development policy this gave the Saifee Burhani trust the vehicle to implement the project since till then there was no mechanism to take up cluster development. The entire redevelopment will be environment-friendly .(acc. To the trust) The layout of the township is such that buildings rise progressively in height from south to north, thus ensuring that every flat catches the breeze coming in from the sea. Of the 17 towers, 13 will be used to rehabilitate the current residents while the remaining four towers with 1,200-1,600 residential units will be put on for sale that will help to cover the project cost. The ground plus two floors will be commercial with underground parking, residential units with their parking will be built on top. Highlights of the Redevelopement.

Old and New site plans comparison.

Old and New site plans comparison.

Old and New site plans comparison.

Land use diagram.

Site plan. Maulana Shaukatali Road Sardar Vallabhbhai Patel Road

Public Housing 2,064 sm Municipal Housing (MHADA) 7,679 sm Municipal Primary School 2,271 sm Ambulance Garag 100 sm BEST Sub-Station 60 sm Secondary School 5,878 sm Municipal Chowky 250 sm Public Sanitary Conveniences 320 sm Community Hall ( Imambara ) 839 sm Recreation grounds 986 sm Additional Programs.

Site Circulation. Maulana Shaukat ali Road Sardar Vallabhbhai Patel Road

Retail planning. (Before)

Retail planning. (After)

Proposed retail atrium

Sections.

Sections. Typical Building section

Sections. Section Through Raudat Tahera .

Sections. Site section.

Materials AAC blocks: Reduction in dead load More carpet area Uniform sizes and good finishes lead to save plastering time and quantity Reduce time of construction Better sound absorption Better thermal insulation Fly ash bricks It reduces dead load on structures due to light weight . Same number of bricks will cover more area than clay bricks High fire Insulation Due to high strength, practically no breakage during transport and use. Due to uniform size of bricks mortar required for joints and plaster reduces almost by 50%

MATERIAL MANAGEMENT USE OF LOW EMBODIED ENERGY MATERIALS WASTAGE OF MATERIAL ON SITE AIR POLLUTION DURING CONSTRUCTION POST CONSUMER MATERIALS LIKE STEAL ALUMINUM, WOOD ETC USE MATERIALS WITH HIGH RECYCLED CONTENT/RECYCLING POTENTIAL LOCALLY AVAILABLE MATERIALS BYPRODUCT MATERIALS IN CONSTRUCTION LIKE FLY ASH REDUCE RECYCLE REUSE (Acc. to the Saifee Burhani Upliftment trust.)

ENERGY MANAGEMENT Solar lights are used for Parking areas, Internal road and landscape areas. PV panels for generating electricity with helps in energy conservation. Solar water heater for domestic hot water. Rain water harvesting due to Increasing demand for water in the areas due to increasing population and high usage of water.

Problems solved after Redevelopment It will provide new amenities and create fresh infrastructure. Space reserved for gardens and recreational facilities. Ample parking space to each residents & the new road will decongest the traffic. Amenities such as solar heaters , rainwater harvesting and energy generating plants using garbage waste are also to be provided. No water logging and flood in this area once the project is done.

Submitted by - Yash Agrawal. Lalit Pa til . Srujan Paithankar . Rajni Sharma. Prachi Thakur Priyal Ajmera .