Learner number: 00736117 Learner name: Bilal Waheed Page 1 of 21
Unit IG2: Risk assessment
Declaration: By submitting this assessment (Parts 1 – 4) for marking I declare that it is entirely my own work. I understand that falsely claiming that
the work is my own is malpractice and can lead to NEBOSH imposing severe penalties (see the NEBOSH Malpractice Policy for further information).
Important note: You must refer to the document ‘Unit IG2: risk assessment – Guidance and information for learners and Learning Partners’ while
completing all parts of this assessment. Your Learning Partner should provide you with a copy, but it can also be downloaded from the relevant
resources section for this qualification on the NEBOSH website.
Part 1: Background
You should aim to complete this section in 150 - 200 words.
Topic Comments
Name of organisation* Adam Ismail Construction Company
Site location* Office # 1 First Floor 213 Main Susan Road Madina Town. Opposite Hockey Stadium, Faisalabad
Number of workers
General description of the organisation
Pakistan's capital city of Islamabad is home to Adam Ismail Construction Company. AICC (Adam
Ismail Construction Company) is a development company for infrastructure, real estate, and
construction. Adam Ismail Infrastructure, Adam Ismail Real Estate Corporation, and Adam Ismail
Construction make up the Adam Ismail Construction Group. The company specialises in
technically challenging, modern building for townships, commercial, residential, and integrated
projects.
Description of the area to be included in the
risk assessment
Any other relevant information
HSE Manager who reports directly to the Director has direct responsibility for health and safety
at work site at Adam Ismail Construction Company
* If you’re worried about confidentiality, you can invent a false name and location for your organisation but, all other information provided must be
factual.
You should aim to complete this section in 100 - 200 words.
Note: this section can be completed after you have competed your risk assessment.
Outline how the risk assessment was carried
out this should include:
sources of information consulted;
I sought assistance from well-known international organisations, such as the ILO and HSE UK, for
my risk assessment.
Learner number: 00736117 Learner name: Bilal Waheed Page 2 of 21
who you spoke to; and
how you identified:
- the hazards;
- what is already being done; and
- any additional controls/actions that
may be required.
Also, HSE source
Construction safety and health
Part 2: Risk Assessment
Organisation name: Adam Ismail Construction Company
Date of assessment: 13-1-2023
Scope of risk assessment: The Risk Assessment will cover the overall all Activities at Royal Shopping mall Are Installation of blocks,
concrete
roof slabs, installation of wooden doors, windows, Excavation works, Installation of electricity including temporary
electrical needs, rough installations, A/C & Telecommunications systems installations, Installation of pipes lines for
carrying water, sewage, gas, sinks, toilets and others etc.
Hazard
category and
hazard
Who might be harmed
and how?
What are you already doing? What further controls/actions are
required?
Timescales for
further actions
to be
completed
(within …)
Responsible
person’s job
title
1. Work at
height
The mason
fixing the tiles
more than 10
meters’ height
without guard
rail of
scaffolding.
The masons, helper
worker &
supervisor will be
affected because the
masons are working
continuously at
scaffolding more than 10
metres
without guard rail, maybe
they fall
down from scaffolding.
1. Workers have PPE only
hard helmets, gloves &
safety boots.
2. Safety sign board
installed at working area.
3. In case of fall from
height, the first aid technician
& material are available at
work site.
Provide guard rail for
scaffolding as per HSE
scaffolding check list guideline.
2. Arrange a safety training
session for work at height to
concerning workers.
3. Barricade the scaffolding
area.
4. Make sure that scaffolding
all parts are working condition
& Inspected on weekly basis.
One Month
One week
One day
Three Days
One week
Two days
Two weeks
One day
HSE officer
Area
supervisor
HSE assistant
Site Manager
Electrical
Engineers
HSE officer
Electrical
supervisor
HSE assistant
Learner number: 00736117 Learner name: Bilal Waheed Page 3 of 21
Hazard
category and
hazard
Who might be harmed
and how?
What are you already doing? What further controls/actions are
required?
Timescales for
further actions
to be
completed
(within …)
Responsible
person’s job
title
They face physical injuries
like head
injury, fractures of body
parts, brain
damage, traumatization,
mental disorders, skeletal
injuries, fractures in
upper limbs, even is
possibility of
death.
5. Provide safety harness to
workers
6. Explain the how to safely
work at height in toolbox
meeting
2. Electricity
The electrical
wires
insulation is
damaged at
the 2nd floor.
stairs, this
wires layout
for electrical
supply for
marble
polishing
machine.
1 civil technician, 1
electrician, 2
plumbers, 2 supervisors,
3 site
engineers, labours will be
affected with
this damaged insulation
of wires
because they all work
continually &
maybe they
unintentionally touch this
wires.
This damaged insulation
is
1. The workers have PPE
(Safety shoe, safety
helmets).
2.In case of electric shock
emergency, first aider is
available at work site.
3. Installed a safety sign
board for electrical
hazard of damaged
insulation.
1. Logout the marble polishing
machine till they resolve the
electrical hazard.
2. Must Replace the damaged
insulation with double
insulation wires.
4.Provide safe installation of
electrical wires with safe layout
as per HSE series code: HSG85
(Third edition)
5. Maintenance & inspection of
electrical wiring layouts are
required as per scheduled.
6. Describe the electrical
hazard in toolbox meeting.
1 Week
Five days
one week
one week
One day
Electrical
Engineer
Electrical
Engineer
Electrical
Engineer
Electrical
Engineer
HSE Manager
Learner number: 00736117 Learner name: Bilal Waheed Page 4 of 21
Hazard
category and
hazard
Who might be harmed
and how?
What are you already doing? What further controls/actions are
required?
Timescales for
further actions
to be
completed
(within …)
Responsible
person’s job
title
an electrical hazard
because the
conductors could be
exposed. Contact
with an exposed wire
could cause a
shock and leading to
arcing or a fire.
As result sever pain in
body, damaged
the body tissues, heart
attack, serious
burns, illness, damaged
the nervous
system, possibility of
death.
3. FIRE
The worker is
cutting a steel
pipe with
grinder near
the generator
fuel (petrol)
storage.
1 grinder technician, 2
helpers &
others worker who works
this area will
have affected by fire,
because
the steel grinding
produces the flames
and sparks; it will be
reason of fire
1.The Fire extinguishers
are installed at
designated areas in
workplace.
2. Safety stickers are
available on drums.
(Highly flammable liquid)
3. Safety sign board for
flammable material
installed in this area.
1. Must Install the protective
sheets between the grinding
works & fuel drums.
2. Shift the grinding activities to
another suitable place.
3. Provide the spirit fuel
storage area from out of the
construction site.
4. Monitor the fire hazards
time to time at work site.
1 Week
One week
Three weeks
Two days
One day
One week
Mechanical
Supervisor
Mechanical
Supervisor
Administrative
Manager
HSE Manager
HSE Manager
Administrative
Manager
Learner number: 00736117 Learner name: Bilal Waheed Page 5 of 21
Hazard
category and
hazard
Who might be harmed
and how?
What are you already doing? What further controls/actions are
required?
Timescales for
further actions
to be
completed
(within …)
Responsible
person’s job
title
because the petrol is a
fuel for fire.
As result the fire will be
burning is
damage to the property.
Serious burns are
complex injuries.
Burn injuries can affect
muscles, bones,
nerves, and blood vessels.
The
respiratory system can be
damaged,
with possible airway
obstruction,
respiratory failure and
respiratory
arrest & possibility of
death.
4. The technicians have
safety helmets, coverall
suit & safety boots.
5. Explain the fire hazard in
toolbox meeting.
6. Provide PPEs (safety goggles,
hand gloves)
4. Manual
handling
Civil workers
shift the heavy
cement blocks
to 1st floor
from the
The civil workers will be
harmed
because during
continually shifting of
heavy cement blocks
workers are
Dust masks, gloves and
other safeties are provided to
workers.
Energy booster drinks are
provided to workers.
Obstacle free pathway is
arranged for workers to
1. Toolbox talk must be
available to every worker.
2. Sack trucks and trollies
must be provided to
eliminate manual handling.
3. Make all the safety
measures and SOP for
1 day
1 week
1 week
2 weeks
Two days
One week
Two weeks
Finance
director
(2)
HSE
supervisor
(1 3 4)
Activity
Learner number: 00736117 Learner name: Bilal Waheed Page 6 of 21
Hazard
category and
hazard
Who might be harmed
and how?
What are you already doing? What further controls/actions are
required?
Timescales for
further actions
to be
completed
(within …)
Responsible
person’s job
title
ground floor
use the stairs
with manual
handling.
maybe slipped or tripped
at the stairs.
As result the heavy
cement blocks fall
down on his body they
face
musculoskeletal injuries,
cuts, bruises,
fractures and
dislocations, but more
serious injuries can also
happen
work in a frequent way.
1.The civil workers have
PPE (hard helmets, safety
shoe & gloves)
2. The civil supervisor is
monitor this work
activity.
manual handling and
implement those strictly.
4. Give a framework with
rotation of job for the
workers.
1. Shift the heavy cement
blocks with material shifting
lift.
2. Install the conveyor belt for
heavy cement blocks shifting.
3. Provide training for manual
handling to workers.
supervisor
(4 5)
Civil
supervisor
Civil
supervisor
HSE Manager
5. Vibration
The civil
worker is
working at
main entrance
gate with
Hand Soil
Compactor
who is
creating high
vibration
The compactor operator
is harmed
because he is observed
the vibration in
his body during
continuing working.
Continuing vibration is an
ergonomic injury causing
damage to
finger circulation and
nerves.
Symptoms include
numbness, pain,
and blanching.
1. The worker have
training how to operate
the hand soil compactor.
2.The civil workers have
PPE (hard helmets, safety
shoe & gloves)
3. The supervisor is there
for monitoring the work
activity
1. Provide maintenance for
hand Soil Compactor.
2. Provide anti vibration gloves
to operator.
3. Provide refresher training to
worker.
4. Explain the vibration hazards
in toolbox talk meeting.
5. Provide job break to worker.
6. Provide job rotation to
worker.
two weeks
one week
one week
one week
two days
one weeks
Maintenance
Technician
HSE Engineer
Mechanical
Supervisor
Area
Supervisor
Activity
Supervisor
HSE Manager
Learner number: 00736117 Learner name: Bilal Waheed Page 7 of 21
Hazard
category and
hazard
Who might be harmed
and how?
What are you already doing? What further controls/actions are
required?
Timescales for
further actions
to be
completed
(within …)
Responsible
person’s job
title
6. Hazardous
substances
The worker
cutting marble
with electric
saw marble
cutter without
eye &
respiratory
safety.
1Marble cutting operator,
2
supervisors, 1 operator
assistant and
workers who working
near the electric
saw marble cutter, they
are harmed
because they inhale the
dust & also his
skin affected with marble
dust.
As result the marble dust
is a cause of
eyes infections and
several respiratory
& Skin diseases, such a
disorder,
cancer, allergic rhinitis,
chronic
bronchitis, asthma,
impairment of lung
function, infection in
respiratory
system & cough.
1.The workers have PPE
(Hard helmets, safety
shoe, normal mask)
2. The supervisor is there
for monitoring the work
activity.
3. The dust hazard safety
sign board is installed.
1. Must provide PPE 3M
respiratory protection mask,
safety goggles.
2. Enclosed the marble cutting
area for other workers’ safety
and waters sprinkling there
should be done
3. Provide job break and job
rotation to workers.
4. Arrange a training session for
workers, regarding dust
hazards.
5. Explain the dust hazard & his
controls in toolbox talk
meeting.
6. Provide monthly health
surveillance for operator.
10 days
One day
Two days
One week
Two days
One week
Site Manager
Civil
Supervisor
Civil
Supervisor
HSE Manager
HSE Manager
HSE Manager
Learner number: 00736117 Learner name: Bilal Waheed Page 8 of 21
Hazard
category and
hazard
Who might be harmed
and how?
What are you already doing? What further controls/actions are
required?
Timescales for
further actions
to be
completed
(within …)
Responsible
person’s job
title
7. Work
equipment’s
The operator
work with
bench grinder
for metal
cutting
without
safeguards.
The grander operator,
helper,
supervisor & labour who
work near the
bench grander are
directly affected
with this machine
because the without
adjustable safeguards
when grinder
working, may be disc are
broken and
go out very fast, during
cutting
operator hand is slip and
go inside
the open grander disc.
As results it will be cause
of Cuts to the
skin
Amputation of fingers
Eye injuries
Head injuries
Foots injuries
Even death.
1. Provide the PPE only
protective coverall for
body protection to
operator.
2. The power cord
(Including plug) free of
breaks & other damage.
3. The abrasive wheel is
free of cracks, chips,
other damage or
deterioration.
1. Lock out the grinder machine till the
adjustable safeguards are not
installed.
2. Provide the adjustable safeguards
for cutting grinders.
3. Provide operating safety manual of
grinder to operator.
Two days
one week
two weeks
HSE engineer
Administrative
Manager
HSE
Manager
Learner number: 00736117 Learner name: Bilal Waheed Page 9 of 21
Hazard
category and
hazard
Who might be harmed
and how?
What are you already doing? What further controls/actions are
required?
Timescales for
further actions
to be
completed
(within …)
Responsible
person’s job
title
8. Slips and
trips
Electrical open
trailing cables
are not
underground
at the
pedestrian
pathways from
store to
construction
site.
The storekeeper, site
engineers, departmental
supervisors, loading
unloading labour &
technician maybe will fall
due to trailing cables are
available at pedestrian
pathways from store to
construction site. As
result they face
musculoskeletal injuries,
cuts, bruises, fractures
and dislocations, but
more serious injuries can
also happen.
1. Posted a visible safety sign
board for trips hazards.
2. The worker use PPE (slip
resistant shoe & safety
helmets).
1. Provide temporarily other
pedestrian pathways.
2. Underground the open trailing
cables.
3. Provide safety training to workers
for trips hazards.
4. Make sure the inspection &
maintenance of electrical cables
layout as per scheduled.
Three Days
One week
two days
two weeks
Site Manager
Electrical
Engineers
HSE officer
Electrical
supervisor
9. Noise
Excessive
noise in the
production
hall.
workers working in the
production hall can be
harmed.
The exposure to
excessive noise for a
long period of time can
create many hearing
problems in the
workers like the
workers can get can
get tinnitus they can
Protective equipment like
ear plugs were provided
individually to a worker.
For safe working on
machine tool box talk have
been installed for
betterment of workers.
1. Install sound absorbing
materials in the industry.
2. The rotation of job schedule
must be ensured.
3. Ensure the maintenance
and proper lubrication
process for machine.
4. Provide health surveillance
facility to the workers after
every six months.
5. Short rest breaks must be
1 month
2 weeks
1 week
6 months
1 week
Finance
director
(1 4)
HSE
supervisor
(2 3 5)
Maintenance
in-charge
(3)
Learner number: 00736117 Learner name: Bilal Waheed Page 10 of 21
Hazard
category and
hazard
Who might be harmed
and how?
What are you already doing? What further controls/actions are
required?
Timescales for
further actions
to be
completed
(within …)
Responsible
person’s job
title
get noise induced
hearing loss and
ringing in the ears.
added to schedule to the
machine operator to lower
down the noise exposure.
10. Movement
of
the people
and vehicles
in the
workplace.
No separate
parking
places for the
vehicles
All the workers working
around the vehicles
can get harmed.
The loader truck was
parked at non
designated place in the
workers area and
workers were moving
around it. In any
emergency the driver of
the vehicle will have to
drive the truck and the
he can hit any worker
around him and the
worker can get body
The driver was competent
and trained.
Safety signs were
displayed.
Daily tool box talk is being
conducted.
1. Traffic warden must be
hired for the enforcement
actions.
2. Segregate all the pathways
for both vehicles and
pedestrians.
3. Traffic control measure like
speed breakers must be
installed.
4. Separate parking places
must be available.
5. Supervision to the drivers
must be given.
1 month
2 months
1 month
1 month
1 week
Finance
manager (1 2 3
4)
HSE officer (5)
Activity
supervisor (1 5)
Learner number: 00736117 Learner name: Bilal Waheed Page 11 of 21
Part 3: Prioritise 3 actions with justification for the selection
Suggested word counts
Moral, general legal and financial arguments for all actions: 300 to 350 words
For EACH action:
Specific legal arguments: 100 to 150 words
Likelihood AND severity: 75 to 150 words
How effective the action is likely to be in controlling the risk: 100 to 150 words
Moral, general legal and financial arguments for ALL actions
Moral, general legal and financial
arguments
Moral arguments:
It is the moral responsibility of Aster Company to provide safe system of work, safe working
equipment’s & safe personal protective equipment. If the employer is not obeying his
responsibilities, it will be a cause of accident at workplace. After accident, the workers are injured
& shifting to hospital. The worker faces lot of pain or maybe disability also. The worker family also
suffer when worker loss his earning source due to his disability. They may face too many difficulties
because worker support to his family with his salary.
So, it is not acceptable for society that worker going to workplace and he face injuries or disabilities
due to unsafe work procedures. That is why the Aster Construction Company must ensure the
safety of its workers.
Legal Arguments:
As Pakistan is a member of ILO, so according to ILO and Pakistan national laws for safe system
should be, follow up. According to safety laws, the Aster Company must be providing safe system
of work, work related safety trainings & safe machinery for work procedures. If accident is
happening due to company is failure to provide facilities of safe system of work-related issue, the
enforcement agencies will act against the company. The enforcement agencies issue improving,
prohibition notices & heavy fine also. If the accidents will be happening with continually, the
enforcement agencies may be banned the company. Company duty to provide health and safety
and make changes according to the C155 and R164 of ILO
Learner number: 00736117 Learner name: Bilal Waheed Page 12 of 21
Financial Arguments:
It is Aster Company responsibility to provide safe system of work, if the accidents are happening in
workplace, company also face financial losses with direct & indirect cost. For example, due to
accident one worker in injured in company. mention financial losses are occurred:
• Provide First aid
• Hospital shifting (surgery or medical treatments)
• During sick leave provide over time to other worker for work.
• If worker is disable and not return to work, hiring of new worker is also financially expansible.
• Investigation of accident also payable.
• Civil claims come from injured worker.
• Court proceedings
• Fines from enforcement agencies
• If accidents will happen continue to, the Insurance company increase the premium.
• During accident maybe some machine also damaged or create fire, damaged of property is also
financial loss.
Justification for action 1
Action (Taken from column 4 of risk
assessment)
2. Must Replace the damaged insulation with double insulation wires. (Hazard Category: 4.
Electricity)
Specific legal arguments When we see the ILO Convention C167 –for Safety and Health in Construction Convention, 1988
(No. 167)
Article 26 ELECTRICITY
Learner number: 00736117 Learner name: Bilal Waheed Page 13 of 21
2. Before construction is commenced and during the progress thereof adequate steps shall be
taken to ascertain the presence of and to guard against danger to workers from any live electrical
cable or apparatus, which is under, over or on the site.
Before construction is commenced and during the progress thereof adequate steps shall be taken
to ascertain the presence of and to guard against danger to workers from any live electrical cable
or apparatus, which is under, over or on the site.
3. The laying and maintenance of electrical cables and apparatus on construction sites shall be
governed by the technical rules and standards applied at the national level.
The ILO Code Of Practice on Electricity Safety the link below give brief details on Electrical safety
and importance: https://www.ilo.org/global/topics/labour-administration-
inspection/resourceslibrary/publications/guide-for-labour-inspectors/electrical-safety/lang--
en/index.htm
Consideration of likelihood AND severity
types of injury or ill health
number of workers at risk
how often the activity is carried
out
how widespread the risk is
The site workers are continually using this pathway in almost 08 duty hours & the wire insulation is
damaged and is laid in that pathway, site workers may unintentionally touch this wires any time
causing accident any time. Very high Likelihood
The 1 civil technician, 1 electrician, 2 plumbers, 2 supervisors, 3 site engineers, labours will be
effected with this damaged insulation of wires because they all work continually & maybe they
unintentionally touch this wires
The likelihood is very high for this hazard.
I set 4 categories for severity of incidents.
1. Minimum: no physical injury & no property loss.
2. Medium: Required first aid after accident.
3. Major: in this situation worker face serious injury who should be shifted to hospital/sick leave
required and also property loss.
4. Catastrophic: in this situation worker death / un recoverable property loss. Fatal injuries
Learner number: 00736117 Learner name: Bilal Waheed Page 14 of 21
This damaged insulation is an electrical hazard because the conductors could be exposed. Contact
with an exposed wire could cause a shock and leading to arcing or a fire.
Contact with an exposed wire could cause an electric shock and leading to electrocute the worker.
Also, can burn the body completely from internal, can damage body tissue, can damage lungs of
workers, muscles pain, burns, bruise and the electrical shock also leading to possibility of death.
Damaged to other electric sockets, electric machinery, whole electric power system sudden stop
can cause damage to other on-going project and machinery. Overall this risk can cause fatal injuries
so this risk is very highly widespread and its covering a particular area where main workers works.
So, its Severity belongs from Catastrophic category due to high likelihood and Fatal injuries
How effective the action is likely to be in
controlling the risk. This should include:
the intended impact of the action;
justification for the timescale that
you indicated in your risk
assessment; and
whether you think the action will
fully control the risk
When we replace the damaged insulation with double insulation wire, if worker unintentionally
touch these wires, they will not face electrical shock the accident will not happened. So the safety
of the workers will be improved
As per timescale 5 days is enough for this action because the after approval from administration
department the wire will purchase from market and after delivery of wire, it will be replacing the
electrical supply wire for marble polishing machine.
The replacement of damaged wire is minimizing the electrical risk, for minimizing more, remove
the electrical supply wire from stairs and ass it another though safe area other than walkways.
Justification for action 2
Action (Taken from column 4 of risk
assessment)
1. Must Install the protective sheets between the grinding works & fuel drums. (Hazard Category,
6.FIRE )
Specific legal arguments When we see the ILO Convention C167 –for Safety and Health in Construction Convention, 1988
(No. 167)
Article 29
FIRE PRECAUTIONS
Learner number: 00736117 Learner name: Bilal Waheed Page 15 of 21
1. The employer shall take all appropriate measures to-
(a) avoid the risk of fire;
(b) combat quickly and efficiently any outbreak of fire;
(c) bring about a quick and safe evacuation of persons.
2. Sufficient and suitable storage shall be provided for flammable liquids, solids and gases.
R164 - Occupational Safety and Health Recommendation, 1981 (No. 164)
II. Technical Fields of Action
3. As appropriate for different branches of economic activity and different types of work and taking
into account the principle of giving priority to eliminating hazards at their source, measures should
be taken in pursuance of the policy referred to in Article 4 of the Convention, in particular in the
following fields:
(m) prevention of fires and explosions and measures to be taken in case of fire or explosion;
Consideration of likelihood AND severity
types of injury or ill health
number of workers at risk
how often the activity is carried
out
how widespread the risk is
The Grinder Technician is cutting a steel pipes with grinder near the generator fuel storage, the
cutting process of steel pips produces the sparks the activity continues for long almost 08 hours
and through day for many days and the petrol is exposed any spark can ignite the fuel and a very
high likelihood of the accident.
1 grinder technician, 2 helpers & others worker who work this area will have affected by fire
I set 4 categories for severity of incidents.
1. Minimum: no physical injury & no property loss.
2. Medium: Required first aid after accident.
3. Major: in this situation worker face serious injury who should be shifted to hospital/sick leave
required and also property loss.
Learner number: 00736117 Learner name: Bilal Waheed Page 16 of 21
4. Catastrophic: in this situation worker death / un recoverable property loss. Fatal injuries
If the fire will start it will be a cause of too much human & property losses happening many
material at construction site will be affected with fire explosion.
As a result, serious burns are complex injuries. Burn injuries can affect muscles, bones, nerves, and
blood vessels. The respiratory system can be damaged, with possible airway obstruction,
respiratory failure, full body burning is the possibility of death. Chances of many deaths, fatal
injuries so this risk hazard is very highly widespread and its covering almost whole building if fire
explosion occurs it will damage the whole building & and this will cause also many death.
So, its severity belongs from Catastrophic category.
How effective the action is likely to be in
controlling the risk. This should include:
the intended impact of the action;
justification for the timescale that
you indicated in your risk
assessment; and
whether you think the action will
fully control the risk
Installation of protective sheets between fuel storage & grinding works minimize the
fire hazard. The protective sheet will have blocked the flames and sparks in specific
area, it will not be creating the ignition sources for fire.
As per timescale 1 week is enough for this action because the sheets are available in
work site material store. For installation of protective sheets, the civil workers are
available at work site. After approving the workers will be set to start work according to
the plan will complete it in the suggested time.
This action will minimize the fire hazard but for minimizing of fire hazard further the fuel
storage should be shifted to another specific area. And supervision control will be given.
Justification for action 3
Action (Taken from column 4 of risk
assessment)
Must provide PPE 3M respiratory protection mask, safety goggles.
(Hazard Category, 12. Hazardous substances)
Learner number: 00736117 Learner name: Bilal Waheed Page 17 of 21
Specific legal arguments When we see the ILO Convention C167 –for Safety and Health in Construction Convention, 1988
(No. 167)
Article 30
PERSONAL PROTECTIVE EQUIPMENT AND PROTECTIVE CLOTHING:
3. Protective equipment and protective clothing shall comply with standards set by the competent
authority considering as far as possible ergonomic principles.
Impact OF breach of LAW
2013
ISBN:
N/A
Series code:
CIS36 (version 2)
https://www.hse.gov.uk/pubns/cis36.htm
Construction dust is not just a nuisance – it can seriously damage your health. Regularly breathing
in these dusts over a long time can cause life-changing lung diseases.
This information sheet is for employers. It tells you what you need to know adequately control the
risks from construction dust.
Consideration of likelihood AND severity
types of injury or ill health
number of workers at risk
how often the activity is carried
out
how widespread the risk is
The marble cutter operator cutting marble with electric saw marble cutter and due to this work
activity dust
is creating and spreading widely. 1 Marble cutting operator, 2 supervisors near, 1 operator
assistant and
workers who working near the electric saw marble cutter, they may harmed because they inhale
the dust &
Learner number: 00736117 Learner name: Bilal Waheed Page 18 of 21
also his skin affected with marble dust.
As result the marble dust is a cause of eyes infections and several respiratory & skin diseases, such
a
disorders, cancer, allergic rhinitis, chronic bronchitis, asthma, impairment of lung function,
infection in
respiratory system & cough. Long-time exposure or inhaling toxic dust can cause lungs cancer.
There is High
Likelihood
I set 4 categories for severity of incidents.
1. Minimum: no physical injury & no property loss.
2. Medium: Required first aid after accident.
3. Major: in this situation worker face serious injury who should be shifted to hospital/sick leave
required
and also property loss.
4. Catastrophic: in this situation worker death / un recoverable property loss. Fatal injuries
As result the marble dust is a cause of eyes infections and several respiratory & skin diseases, such
a
disorders, cancer, allergic rhinitis, chronic bronchitis, asthma, impairment of lung function,
infection in
respiratory system & cancer which may take long time to notice and this may cause the death of
the
operators and other workers who working there and inhaling dust almost 08 hours a day so this is
Highly
Learner number: 00736117 Learner name: Bilal Waheed Page 19 of 21
widespread risk because This can cause Lung Damage or Cancer which is dangerous disease and
the workers
working there don’t have enough money to recover because it takes a lot of money for the cure of
lung
cancer. The risk is high widespread and its covering the area where 1 Marble cutting operator, 2
supervisors
near, 1 operator assistant and workers who working near the electric saw marble cutter, they may
harmed
because they inhale the dust & also his skin affected with marble dust and long term inhalation
cause the
cancer and other deadly lung diseases.
So its Severity belongs from Major because these injuries require long term hospital treatments.
How effective the action is likely to be in
controlling the risk. This should include:
the intended impact of the action;
justification for the timescale that
you indicated in your risk
assessment; and
whether you think the action will
fully control the risk
Providing of 3M respiratory mask & safety goggles will be minimizing the dust hazard for workers.
For
another control provide supervision to make sure that worker should be use PPE during marble
cutting
activity, it will be also minimizing the dust hazard.
As per timescale 10 days is enough for this action because the after approval from administration
department. The purchaser will providing the 3M respirator mask & safety goggles to marble
cutting
workers at workplace within given time
Yes this action will control the risk but with good supervision and water sprinkling there then the
hazard will
be fully controlled
Learner number: 00736117 Learner name: Bilal Waheed Page 20 of 21
Part 4: Review, communicate and check
Suggested word counts for each section:
Planned review date or period and reasoning for this: 50 - 100 words
How the risk assessment findings will be communicated and who needs to know the information: 100 - 150 words
Follow up on the risk assessment: 100 - 150 words.
Planned review date/period with
reasoning
Date of risk assessment for review is 11 November 2023 because it is the Aster company policy that
review risk assessment will be annually so I will also review this risk assessment before one-year if
under mention some points will happen.
Entry of vulnerable employees at work site.
If some new equipment’s & machinery introduce at work site.
If some incidents/accidents will be happing repeating.
Changing of work methods.
If accident happens
How the risk assessment findings will be
communicated AND who you need to tell
After completing all my finding and I will have prepared the risk assessment documents. Then
I send a short summary of my finding to Aspire company Director by email and to section engineers
& supervisors. I will invite the site manager, Health and safety Engineer and worker representative
for meeting to explain the risk assessment finding in detail. I will arrange a seminar for site
workers & provide hard copy of my report to all concerning employees, provide and paste all my
finding in company website & also provide on notice board for workers on site. I save the minutes
of meeting reports and provide to other concerning departments & employees. I will have
0prepared the safety sign by visible posters as per my risk control measures for site worker &
explain my finding & risk assessments controls in toolbox meetings.
How you will follow up on the risk
assessment to check that the actions
have been carried out
Before starting work in area on actions I will set reminder (every 10 days) on notes in office and in
calendar in personal phone for the day of starting work. I will visit the area to inspect the
preparation with responsible persons. I will visit in future to the site surprisingly to judge the
progress of work and will make picture and videos for record. If any resource they feel is lacking. I
will meet the concerning head of department & and will resolve the resources lack issue. If they
required More finance for this control, I will be concerning to finance department head or finance
manager to provide the finance. If still the work is going prolong to complete the action and the
action is delaying very much, like 5 months, I will refer the action to the General Manager in a
meeting.