Manage Data center Services
Page 1Confidential Property of Schneider Electric |1Structure of resources
2Manpower Deployment
3Attrition
4Diesel Filling Support
5Tools Status
6PPE’s Status
7Training
8Sanction VS Running Load
9N-E Voltage
10DG Noise Level
11Communication matrix
Table of Content
Structure of resourcesS. No.CircleLocationType
Resources
Sanctioned
Available
Resources
1 Sanat nagarSAG2 8 8
2 Qamarwadi GR 4 4
3 DangarporaGR 4 4
4 Leh GR 4 4
5 Nowhatta GR 4 4
6 Anantnag GR 4 4
28 28
Kashmir
Total Count
Manpower Deployment
Page 3Confidential Property of Schneider Electric |28
28Total Man power deployed
Total Man power Required S.NoEmp name Designation
1Gazanffer Supervisor
2Aadil Technician
3Asif Ali mallaTechnician
4Bashir AhmadTechnician
5M. Abrar MirTechnician
6Showkat AhmadTechnician
7Syed Saqib Technician
8Arshid AhmadTechnician
9Waseem Ahmad HK
Sanat nagar SAG2 S.NoEmp name Designation
1Shahbaz QaseenSupervisor
2Sameer AbbasTechnician
3Shahdil hussainTechnician
4Syed Abrar Technician
Qamarwadi GR S.NoEmp nameDesignation
1Mustafa Supervisor
2Ahmad AliTechnician
3Arif HussainTechnician
4Ghulam HasanTechnician
Leh GR S.No Emp name Designation
1Wasim mohammadSupervisor
2Shahnawaz Technician
3Parvaiz HussainTechnician
4 Syed Aquib JalaliTechnician
Sanat nagar GR S.No Emp name Designation
1Aaqif Qadir SheikhSupervisor
2Muzafer FarooqTechnician
3Mubasher ZulufkarTechnician
4 Waseem Technician
Anantnag GR S.No Emp name Designation
1Ansar Supervisor
2Firoz ahmad Technician
3Mujtaba Ali Technician
4Abrar mehraj Technician
Dangarpora GR
Attrition
Page 4Confidential Property of Schneider Electric |1Stanzin Lotos Leh04-11-2021
2Murtza Ali Leh20-11-2021
3Gulzar Hussain Leh10-02-2022
4Mo. Tariq Leh10-08-2022
5Fahad Furqan Anantnag10-05-2022
S. No.Name of EmployeeLocationExit Date
Details of resigned employees since Dec'19Total No of Attrition Since Dec'20195
Diesel Filling Support
DIESEL FILLING PARTNER DETAIL1 Sanat nagar Yes Yes
2 Qamarwadi Yes Yes
3 Dangarpora Yes Yes
4 Anantnag Yes Yes
5 Nowhatta Yes Yes
6 Leh Yes Yes
Diesel filling
support by SE
Kashmir
Location
PO for Diesel
filling support
Total no. of
filling sites
6
S. No.Circle Name Organization
Contact
No.
1 Sanat nagar No
2 Qamarwadi No
3 Dangarpora No
4 Anantnag No
5 Nowhatta No
6 Leh
Mr. Ashraf
Ali
M/S Ashraf Ali
Transport
9484147861 No
Remarks
Mr. Tariq
Ibran
National
Transportation
of Kashmir
7006910720
S. No.CircleLocation
Vendor
Kashmir
Escalation
LFL/Circle 1 Sanat nagar4 320070% No
2 Qamarwadi 2 500 70 No
3 Dangarpora 2 220 70 No
4 Anantnag 2 480 50 No
5 Nowhatta 2 480 70 No
6 Leh 2 1200 60 No
Kashmir6
CircleS. No. Tank SizeFuel %
External
Tank
Total no.
of filling
LocationNo of DGs
Resource TrainingJan'22Feb'22March'22April'22May'22June'22July.22Aug'22Sep'22Oct'22Nov'22
1 TechBasic of DC Done
2 TechIncident & Accident ReportingDone
3 TechLogbook, HOTO & SOP Done
4 TechO&M of ACB/VCB Done
5 TechTraining on golden parameters Done
6 TechHSEQ-Safety Training Done
7 TechEarthing System Done
8 TechUtlity Training-HVAC Done
9 TechTransformer Operation Done
10 TechO&M of UPS Done
11 TechLOTO training Done
Training Calender Year 2022_SE Jio Sites
S.No.
Training
Type
Description
N-E VoltageS.No.Site Name
N-E Voltage
(V)
1Sanat nagar0.340
2Nowhatta 0.060
3Qamarwadi 0.180
4Dangarpora0.016
5Leh 0.500
6Anantnag 0.800
DG Noise Level
Page 11Confidential Property of Schneider Electric |
**In Anantnag and Leh we do not have the Noise Meter, so the DG noise level was not measured there.S.No.Site Name
DG Noise
Level (db)
1Sanat nagar74.0
2Nowhatta 73.5
3Qamarwadi 71.4
4Dangarpora67.6
5Leh *
6Anantnag *
Communication matrix
Level-1
Facility SPOC
Level – 3
Central Project coordinator
Mr. Rupesh Kumar
+91-8789458174
Level – 3
Quality Manager
Mr. Bhabagrahi Mohanta
+91-8008222014
Level – 4
Head - MDCS
Mr. Dharmesh Shukla
+91-9911383934
Level -2
Circle Head
PB/HR/HP/Jammu/Kashmir
Mr. Abhishek Jaiswal
+91-9654259866
N-E Voltage of Facilities
Page 13Confidential Property of Schneider Electric |
Tools and PPE Availability Audit @ Srinagar-SAG2
Page 14Confidential Property of Schneider Electric |
100% Tools and PPE compliance
Glimpse of Online Trainings
Page 15Confidential Property of Schneider Electric |
Training sessions from schneider Experts to all on site resources