sap 2016-09-14_PP_MRPType_VB_Blogged.pptx

AmiraJemi 0 views 34 slides Oct 10, 2025
Slide 1
Slide 1 of 34
Slide 1
1
Slide 2
2
Slide 3
3
Slide 4
4
Slide 5
5
Slide 6
6
Slide 7
7
Slide 8
8
Slide 9
9
Slide 10
10
Slide 11
11
Slide 12
12
Slide 13
13
Slide 14
14
Slide 15
15
Slide 16
16
Slide 17
17
Slide 18
18
Slide 19
19
Slide 20
20
Slide 21
21
Slide 22
22
Slide 23
23
Slide 24
24
Slide 25
25
Slide 26
26
Slide 27
27
Slide 28
28
Slide 29
29
Slide 30
30
Slide 31
31
Slide 32
32
Slide 33
33
Slide 34
34

About This Presentation

sap 2016-09-14_PP_MRPType_VB_Blogged.pptx


Slide Content

SAP ERP MRP Planning MRP Type “VB” Manual reorder point planning

MRP Type “VB” (Manual reorder point planning) reorder point entered manually safety stock entered manually (optional) external requirements not considered forecasting optional but not included for planning

All External Requirements are Switched OFF MRP Procedure “B” (Reorder point planning) Forecast possible but Optional Both Safety Stock and Reorder Point are not derived automatically

Minimum MRP1,2 view for MRP Type “VB” Forecasting view is Optional but forecast result not available for Planning

Reorder Point Quantity MANDATORY

Reorder Point Quantity MANDATORY ROP should be a function of average consumption depletion based on the supplier replenishment lead time.

600 5 00 4 00 3 00 2 00 1 00 1 2 3 4 5 6 When the stock falls below 600, the average consumption is 100 per day, the supplier replenishment lead time is 6 days, In 6 days time the material will be consumed finish and the material is arrive on time to increase the stock. In this case, no safety if supplier late delivery or consumption pattern changes.

Supplier Replenishment Lead Time (or Supplier Lead Time) is 5 days

From PR to PO issued lead time is 1 day

Total Replenishment Lead Time is 5 + 1 = 6 days

Forcasting results for MRP Type “VB”

You can have a Forecasting view but the results of the forecast requirements are not included for planning for MRP Type “VB”

The forecast result will not show as requirements in MD04 for MRP Type “VB”

The forecast result will not show as requirements in MD04 for MRP Type “VB”

Purchasing Lot Size

Replenishment Lot Size (when stock fall below 600, issue PO for 800)

600 500 400 300 200 100 1 2 3 4 5 6 7 00 8 00 800 Replenish 800

External Requirement

Note Reservation of 500 shows the stock depletion to 200 below ROP of 600

MRP executed

No replenishment PR generated despite below ROP Because External Requirements are NOT considered

In MRP Type “VB”, none of these requirements are considered for RO P Triggering

Adding Safety Stock for MRP Type “VB”

600 500 400 300 200 100 1 2 3 4 5 6 700 800 Fixed Lot Size 800 ROP 600 7 8 1 day purchasing Processing time + 5 days supplier lead time = 6 days Replenishment Lead Time

600 500 400 300 200 100 1 2 3 4 5 6 700 800 Fixed Lot Size 800 ROP 600 7 8 1 day purchasing Processing time + 5 days supplier lead time = 6 days Replenishment Lead Time To Implement Safety Stock for MRP Type “VB”

600 500 400 300 200 100 1 2 3 4 5 6 700 800 Fixed Lot Size 800 ROP 600 7 8 1 day purchasing Processing time + 5 days supplier lead time = 6 days Replenishment Lead Time Implement 2 days safety, since daily average consumption is 100, 2 days of safety means 200

600 500 400 300 200 100 700 800 Fixed Lot Size 800 Safety Stock 200 1 2 3 4 5 6 7 8 9 00 10 00 ROP 600 Replenishment Lead Time 6 days

Increase to 800 (plus safety stock 200)

Now at 800 (inclusive of safety of 200)

as current stock 700 below ROP 800, we now expect triggering of procureemnt

MRP executed

Order Lot Size 800

6 days replenishment lead time