Selection of Bidder for Toll collection and APC

sombans 156 views 19 slides Sep 12, 2024
Slide 1
Slide 1 of 19
Slide 1
1
Slide 2
2
Slide 3
3
Slide 4
4
Slide 5
5
Slide 6
6
Slide 7
7
Slide 8
8
Slide 9
9
Slide 10
10
Slide 11
11
Slide 12
12
Slide 13
13
Slide 14
14
Slide 15
15
Slide 16
16
Slide 17
17
Slide 18
18
Slide 19
19

About This Presentation

Calculation for APC for the Toll Revenue and selection of bidder requirement


Slide Content

SELECTION OF BIDDER FOR COLLECTION OF USER FEE for adb tr-1/pkg 04 Estimation for Annual Potential Collection from Tolling for invitation of Bid PIU PPP PWD Sikar

Project Road and toll plaza locations S. No. Highway No Name of Road Toll Plaza Located in Km 1 SH-13 Ajeetgarh to Chala section from Km. 16.200 to Km. 49.335 24 2 SH-13B Singhana to State Border via Buhana from Km. 0.0 to Km. 33 29 3 SH-20 Sikar to Ganeri section from Km 0.000 to Km 42.180 22 4 SH-20 Bidasar to Jasrasar section from Km 105.000 to Km 153.000 140 5 SH-20 Jasrasar to Nokha Section from Km 153.000 to Km 198.000 188

Salient Features 1 Carriageway of all Toll Roads 7.0 m 2 Toll lanes at all Toll Plazas are 3 + 3 3 Collecting Agency at Present for all 5 nos. Toll Plazas M/s Balbeer Singh Construction Co. Sikar 4 Period of Tolling October 03, 2020 to April 03, 2021 ( six months duration) 5 Total Quoted/approved Remittance as per Contract Rs. 4,91,85,000/- ( Weekly remittance is Rs.18,91,731/-) 6 Bypasses or Bridges costing 5 crores Nil

Fee Notifications Fee Notifications under the Rajasthan State Highways Act 2014 ( 22 of 2015) read with Rule 3 of the Rajasthan State Highways Fee (Determination of Rates and Collection) Rules, 2015 were published in Official gazette vide SO 242 & 243 dated February 08,2019 for levy and collection of fee for aforesaid section of highways.

Base Rate of FEE as per Fee Rules ( Base Year 2015-16) S. No. Type of Vehicle Base rate of fee per km (in rupees) 1 2 3 1. Car, Jeep, Van or Light Motor Vehicle or Tractor with trolley carrying Non-Agricultural Produce 1.05 2. Light Commercial Vehicle, Light Goods Vehicle or Mini Bus 1.60 3. Bus or Truck 3.15 4. Heavy Construction Machinery(HCM) or Earth Moving Equipment (EME) or Multi Axle Vehicle (MAV) (three to six axles) 5.25 5. Oversized Vehicles (seven or more axles) 6.30

Calculation of Applicable Rate of FEE from April 01,2021( Fy 2021-22) The Annual Revision of Rate of Fee shall be required as per the Rule 5 of Fee Rule which says that: Base Rate shall be increased by 3 % every year without compounding to reflect the increase in wholesale price index as applicable for January 1, 2015 and for January 1 of the year, in which such revision is undertaken but such revision shall be restricted to forty per cent of the increase in wholesale price index. rounded off and levied in a multiple of the nearest rupees five (sub rule 5 of Rule 3) .

Applicable FEEs for All Five Sections

Toll Fee for Ajeetgarh to Chala section of SH 13 from Km 16.200 to Km 49.335 as applicable on April 01, 2021 (Toll Plaza At km 23.650) S No Particulars Calculation Car, jeep, LMV LCV, LGV, Mini Bus Bus or Truck HCM, EME, MAV Over sized vehicles Monthly Pass for Non commercial mechanical vehicles 1 Base rate as per Gazzett Notification as on 01.04.2015 (2015-16) A 1.05 1.60 3.15 5.25 6.30 200 2 3% increase each year without compounding as on 01.04.2021(2021-22) for 6 years B= Ax0.03x6 0.189 0.288 0.567 0.945 1.134 36 3 Revised Base rate as on 01.04.2021 C=A+B 1.239 1.888 3.717 6.195 7.434 236 4 WPI as on 1st Jan. 2015 (Dec. 2014) D 112.1 112.1 112.1 112.1 112.1 112.1 5 WPI as on Dec. 2020 E 124.5 124.5 124.5 124.5 124.5 124.5 6 40% increase in WPI (% of revised Base rate) F=C*(E-D)/D*40% 0.055 0.084 0.164 0.274 0.329 10.442 7 Applicabe rate of fee (Increase on Base rate due to change in WPI) G=C+F 1.293821 1.971537 3.881463 6.469105 7.762926 246.44211 8 Length of Highway H 33.135 33.135 33.135 33.135 33.135 1 9 Pre-rounded fee for Single Trip for 2021-2022 j=HxG 42.871 65.327 128.612 214.354 257.225 246.442 10 Rounded off Fee for Single Journey J 45 65 130 215 255 245 11 Return Journey K=jx1.5 64.306 97.990 192.918 321.531 385.837   12 Rounded off Fee for Return Journey L 65 100 195 320 385 13 Fee for Monthly Pass valid for 50single journey N=(jx2/3)*50 1429.025 2177.562 4287.076 7145.127 8574.152 14 Rounded off fee for Monthly Pass validfor 50 Single journey O 1430 2180 4285 7145 8575

Toll Fee for Singhana to State Border via Buhana Section w.e.f. 1st April 2021 (Toll Plaza At km 28.650) S No Particulars Calculation Car, jeep, LMV LCV, LGV, Mini Bus Bus or Truck HCM, EME, MAV Over sized vehicles Monthly Pass for Non commercial mechanical vehicles 1 Base rate as per Gazzett Notification as on 01.04.2015 (2015-16) A 1.05 1.60 3.15 5.25 6.30 200 2 3% increase each year without compounding as on 01.04.2021(2021-22) for 6 years B= Ax0.03x6 0.189 0.288 0.567 0.945 1.134 36 3 Revised Base rate as on 01.04.2021 C=A+B 1.239 1.888 3.717 6.195 7.434 236 4 WPI as on 1st Jan. 2015 (Dec. 2014) D 112.1 112.1 112.1 112.1 112.1 112.1 5 WPI as on Dec. 2020 E 124.5 124.5 124.5 124.5 124.5 124.5 6 40% increase in WPI (% of revised Base rate) F=C*(E-D)/D*40% 0.055 0.084 0.164 0.274 0.329 10.442 7 Applicabe rate of fee (Increase on Base rate due to change in WPI) G=C+F 1.294 1.972 3.881 6.469 7.763 246.442 8 Length of Highway H 31.336 31.336 31.336 31.336 31.336 1 9 Pre-rounded fee for Single Trip for 2021-2022 j=HxG 40.543 61.780 121.630 202.716 243.259 246.442 10 Rounded off Fee for Single Journey J 40 60 120 205 245 245 11 Return Journey K=jx1.5 60.815 92.670 182.444 304.074 364.889   12 Rounded off Fee for Return Journey L 60 95 180 305 365 13 Fee for Monthly Pass valid for 50single journey N=(jx2/3)*50 1351.439 2059.336 4054.318 6757.196 8108.635 14 Rounded off fee for Monthly Pass validfor 50 Single journey O 1350 2060 4055 6755 8110

Toll Fee for Bidasar to Jasrasar Section w.e.f. 1st April 2021 (Toll Plaza At km 139.5) S No Particulars Calculation Car, jeep, LMV LCV, LGV, Mini Bus Bus or Truck HCM, EME, MAV Over sized vehicles Monthly Pass for Non commercial mechanical vehicles 1 Base rate as per Gazzett Notification as on 01.04.2015 (2015-16) A 1.05 1.60 3.15 5.25 6.30 200 2 3% increase each year without compounding as on 01.04.2021(2021-22) for 6 years B= Ax0.03x6 0.189 0.288 0.567 0.945 1.134 36 3 Revised Base rate as on 01.04.2021 C=A+B 1.239 1.888 3.717 6.195 7.434 236 4 WPI as on 1st Jan. 2015 (Dec. 2014) D 112.1 112.1 112.1 112.1 112.1 112.1 5 WPI as on Dec. 2020 E 124.5 124.5 124.5 124.5 124.5 124.5 6 40% increase in WPI (% of revised Base rate) F=C*(E-D)/D*40% 0.055 0.084 0.164 0.274 0.329 10.442 7 Applicabe rate of fee (Increase on Base rate due to change in WPI) G=C+F 1.294 1.972 3.881 6.469 7.763 246.442 8 Length of Highway H 48 48 48 48 48 1 9 Pre-rounded fee for Single Trip for 2021-2022 j=HxG 62.103 94.634 186.310 310.517 372.620 246.442 10 Rounded off Fee for Single Journey J 60 95 185 310 375 245 11 Return Journey K=jx1.5 93.155 141.951 279.465 465.776 558.931   12 Rounded off Fee for Return Journey L 95 140 280 465 560 13 Fee for Monthly Pass valid for 50single journey N=(jx2/3)*50 2070.114 3154.459 6210.341 10350.568 12420.682 14 Rounded off fee for Monthly Pass validfor 50 Single journey O 2070 3155 6210 10350 12420

Toll Fee for Jasrasar to Nokha Section w.e.f. 1st April 2021 (Toll Plaza At km 188) S No Particulars Calculation Car, jeep, LMV LCV, LGV, Mini Bus Bus or Truck HCM, EME, MAV Over sized vehicles Monthly Pass for Non commercial mechanical vehicles 1 Base rate as per Gazzett Notification as on 01.04.2015 (2015-16) A 1.05 1.60 3.15 5.25 6.30 200 2 3% increase each year without compounding as on 01.04.2021 (2021-22) for 6 years B= Ax0.03x6 0.189 0.288 0.567 0.945 1.134 36 3 Revised Base rate as on 01.04.2021 C=A+B 1.239 1.888 3.717 6.195 7.434 236 4 WPI as on 1st Jan. 2015 (Dec. 2014) D 112.1 112.1 112.1 112.1 112.1 112.1 5 WPI as on Dec. 2020 E 124.5 124.5 124.5 124.5 124.5 124.5 6 40% increase in WPI (% of revised Base rate) F=C*(E-D)/D*40% 0.055 0.084 0.164 0.274 0.329 10.442 7 Applicabe rate of fee (Increase on Base rate due to change in WPI) G=C+F 1.294 1.972 3.881 6.469 7.763 246.442 8 Length of Highway H 45 45 45 45 45 1 9 Pre-rounded fee for Single Trip for 2021-2022 j=HxG 58.222 88.719 174.666 291.110 349.332 246.442 10 Rounded off Fee for Single Journey J 60 90 175 290 350 245 11 Return Journey K=jx1.5 87.333 133.079 261.999 436.665 523.998   12 Rounded off Fee for Return Journey L 85 135 260 435 525 13 Fee for Monthly Pass valid for 50single journey N=(jx2/3)*50 1940.732 2957.305 5822.195 9703.658 11644.389 14 Rounded off fee for Monthly Pass validfor 50 Single journey O 1940 2955 5820 9705 11645

Toll Fee for Sikar to Ganeri Section w.e.f. 1st April 2021 (Toll Plaza At km 22) S No Particulars Calculation Car, jeep, LMV LCV, LGV, Mini Bus Bus or Truck HCM, EME, MAV Over sized vehicles Monthly Pass for Non commercial mechanical vehicles 1 Base rate as per Gazzett Notification as on 01.04.2015 (2015-16) A 1.05 1.60 3.15 5.25 6.30 200 2 3% increase each year without compounding as on 01.04.2021(2021-22) for 6 years B= Ax0.03x6 0.189 0.288 0.567 0.945 1.134 36 3 Revised Base rate as on 01.04.2021 C=A+B 1.239 1.888 3.717 6.195 7.434 236 4 WPI as on 1st Jan. 2015 (Dec. 2014) D 112.1 112.1 112.1 112.1 112.1 112.1 5 WPI as on Dec. 2020 E 124.5 124.5 124.5 124.5 124.5 124.5 6 40% increase in WPI (% of revised Base rate) F=C*(E-D)/D*40% 0.055 0.084 0.164 0.274 0.329 10.442 7 Applicabe rate of fee (Increase on Base rate due to change in WPI) G=C+F 1.294 1.972 3.881 6.469 7.763 246.442 8 Length of Highway H 42.18 42.18 42.18 42.18 42.18 1 9 Pre-rounded fee for Single Trip for 2021-2022 j=HxG 54.573 83.159 163.720 272.867 327.440 246.442 10 Rounded off Fee for Single Journey J 55 85 165 275 325 245 11 Return Journey K=jx1.5 81.860 124.739 245.580 409.300 491.160   12 Rounded off Fee for Return Journey L 80 125 245 410 490 13 Fee for Monthly Pass valid for 50single journey N=(jx2/3)*50 1819.112 2771.981 5457.337 9095.562 10914.674 14 Rounded off fee for Monthly Pass validfor 50 Single journey O 1820 2770 5455 9095 10915

Traffic Survey For counting classified traffic through Video-based ATCC, videography has been carried out near the toll plaza location. Videograpy has been used to capture both directions traffic for seven continuous days with the high resolution infra red camera. The video captured has been processed at the laboratory for classifying the vehicles (through an image processing software) based on the categories in intervals of one hour. The traffic survey was conducted from 24.09.2020 to 01.10.2020 by M/s TTL Engineering Pvt. Ltd. Gurugram. The glimpse of image processing and capturing of data is shown in video

Average daily Traffic as per Survey (Tollable Category) Section Car /Jeep /Van LCV Bus 2 Axle Truck 3 Axle Truck MAV OSV Total Bidasar to Jasrasar section 568 272 98 26 85 42 1091 Jasrasar to Nokha Section 590 369 88 16 48 28 1139 Ajeetgarh to Chala section 1051 232 91 19 23 41 1457 Sikar to Ganeri section 1862 483 110 26 59 91 2631 Singhana to State Border via Buhana 487 148 15 3 19 21 693

Estmation of Operation Cost S No Designation at Plaza Expediture / Sallary Per. Month Man power (Nos) Cost of Manpower (Rs.)             TP-1 (SH13) TP-2 (SH13B) TP-3 (Bidasar-Jasrasar SH 20) TP-4 (Jasrasar-Nokha SH 20) TP-5 (Sikar-Ganeri SH 20) TP-1 (SH13) TP-2 (SH13B) TP-3 (Bidasar-Jasrasar SH 20) TP-4 (Jasrasar-Nokha SH 20) TP-5 (Sikar-Ganeri SH 20) 1 Plaza Manager 30000 1 1 1 1 1 30000 30000 30000 30000 30000 2 Shift In charge 13000 3 3 3 3 3 39000 39000 39000 39000 39000 3 Accountant 13000 1 1 1 1 1 13000 13000 13000 13000 13000 4 Toll Collector 8000 18 18 18 18 18 144000 144000 144000 144000 144000 5 Toll Attendant 6500 3 3 3 3 3 19500 19500 19500 19500 19500 6 Barrier man 6500 3 3 3 3 3 19500 19500 19500 19500 19500 7 Gun man 12000 3 3 3 3 3 36000 36000 36000 36000 36000 8 Electrician 10000 1 1 1 1 1 10000 10000 10000 10000 10000 9 Safaiwala/ Mali 6500 1 1 1 1 1 6500 6500 6500 6500 6500 10 Peon 6500 3 3 3 3 3 19500 19500 19500 19500 19500 11 Money Collecting Vehicle 25000 1 1 1 1 1 25000 25000 25000 25000 25000 12 Office Supplies & Misc .expenditure 25000 1 1 1 1 1 25000 25000 25000 25000 25000 13 Electical Charges 57000 1 1 1 1 1 57000 57000 57000 57000 57000 14 Diesel 25000 1 1 1 1 1 25000 25000 25000 25000 25000 15 Total             469000 469000 469000 469000 469000 16 Overheads 5% 23450 23450 23450 23450 23450   Total Monthly 492450 492450 492450 492450 492450   Total Yearly 59,09,400 59,09,400 59,09,400 59,09,400 59,09,400

Estimation of APC

APC Calculations for Ajeetgarh-Chala Section S. No. Category ADT For Year 2020-21 ADT for 2021-22 ( after 5% Increase) AADT for 2021-22 Tollable Traffic Toll Rates ( single Trip) Toll Collection ( In Rs.)     TP-1 (SH13) TP-1 (SH13) SCF TP-1 (SH13) % of AADT TP-1 (SH13) TP-1 (SH13) TP-1 (SH13) 1 Car, Jeep, Van or Light Motor Vehicle or Tractor with trolley carrying Non-Agricultural Produce 1051 1104 1 1104 70% 773 45 126,96,525 2 Light Commercial Vehicle, Light Goods Vehicle or Mini Bus 232 244 1 244 70% 171 65 40,56,975 3 Bus 91 96 1 96 70% 67 130 31,79,150 4 Truck 19 20 1 20 90% 18 130 8,54,100 5 Heavy Construction Machinery(HCM) or Earth Moving Equipment (EME) or Multi Axle Vehicle (MAV) (three to six axles) 64 67 1 67 95% 64 215 50,22,400 6 Oversized Vehicles (seven or more axles) 1 90% 255 -                 (1) 25809150 95 % Realization of (1) (2) 24518692.5 Operation Cost (fixed) (3) -5909400 Contractor Profit 10% of [(2)+(3)] (4) -1860929 APC [(2)+(3)+(4)] 16748363.5 Say 1.67 crore

Based on the similar estimation, the combined APC is arrived as below: APC Calculations for 5 Nos Toll Plazas S. No. Category Toll Collection     TP-1 (SH13) TP-2 (SH13B) TP-3 (Bidasar-Jasrasar SH 20) TP-4 (Jasrasar-Nokha SH 20) TP-5 (Sikar-Ganeri SH 20) Total 1 Car, Jeep, Van or Light Motor Vehicle or Tractor with trolley carrying Non-Agricultural Produce 126,96,525 52,26,800 91,32,300 95,04,600 274,82,675 640,42,900 2 Light Commercial Vehicle, Light Goods Vehicle or Mini Bus 40,56,975 23,87,100 69,35,000 89,02,350 110,13,875 332,95,300 3 Bus 31,79,150 4,81,800 48,61,800 40,88,000 48,78,225 174,88,975 4 Truck 8,54,100 1,31,400 16,20,600 9,58,125 14,45,400 50,09,625 5 Heavy Construction Machinery(HCM) or Earth Moving Equipment (EME) or Multi Axle Vehicle (MAV) (three to six axles) 50,22,400 29,93,000 142,56,900 80,44,600 150,56,250 453,73,150 6 Oversized Vehicles (seven or more axles) - - - - - - 258,09,150 112,20,100 368,06,600 314,97,675 598,76,425 1652,09,950 95 % Realization of 245,18,693 106,59,095 349,66,270 299,22,791 568,82,604 1569,49,453 Operation Cost -59,09,400 -59,09,400 -59,09,400 -59,09,400 -59,09,400 -295,47,000 Contractor Profit 10% -18,60,929 -4,74,970 -29,05,687 -24,01,339 -50,97,320 -127,40,245 APC 167,48,364 42,74,725 261,51,183 216,12,052 458,75,884 1146,62,208 Say 11.47 Crores