Based on the similar estimation, the combined APC is arrived as below: APC Calculations for 5 Nos Toll Plazas S. No. Category Toll Collection TP-1 (SH13) TP-2 (SH13B) TP-3 (Bidasar-Jasrasar SH 20) TP-4 (Jasrasar-Nokha SH 20) TP-5 (Sikar-Ganeri SH 20) Total 1 Car, Jeep, Van or Light Motor Vehicle or Tractor with trolley carrying Non-Agricultural Produce 126,96,525 52,26,800 91,32,300 95,04,600 274,82,675 640,42,900 2 Light Commercial Vehicle, Light Goods Vehicle or Mini Bus 40,56,975 23,87,100 69,35,000 89,02,350 110,13,875 332,95,300 3 Bus 31,79,150 4,81,800 48,61,800 40,88,000 48,78,225 174,88,975 4 Truck 8,54,100 1,31,400 16,20,600 9,58,125 14,45,400 50,09,625 5 Heavy Construction Machinery(HCM) or Earth Moving Equipment (EME) or Multi Axle Vehicle (MAV) (three to six axles) 50,22,400 29,93,000 142,56,900 80,44,600 150,56,250 453,73,150 6 Oversized Vehicles (seven or more axles) - - - - - - 258,09,150 112,20,100 368,06,600 314,97,675 598,76,425 1652,09,950 95 % Realization of 245,18,693 106,59,095 349,66,270 299,22,791 568,82,604 1569,49,453 Operation Cost -59,09,400 -59,09,400 -59,09,400 -59,09,400 -59,09,400 -295,47,000 Contractor Profit 10% -18,60,929 -4,74,970 -29,05,687 -24,01,339 -50,97,320 -127,40,245 APC 167,48,364 42,74,725 261,51,183 216,12,052 458,75,884 1146,62,208 Say 11.47 Crores