SIMULATION BASED OPTIMIZATION OF EARTHWORK OPERATIONS
The line spine earthwork


Slide Content

SIMULATION BASED OPTIMIZATION OF EARTHWORK OPERATIONS [The line spine earthwork]

introduction

METHODOLOGY

Case study The Travel Route Dumping Loading

Current Data

Distribution of model input data Mixed-unloaded Travel Time Distribution Results

Distribution of model input data Mixed-Unloading Time Distribution Results Mixed-Loading Time Distribution Results

Simulations structuter

Given reselts

Statices and probapility

Reseltus We started testing with 5 excavators and 20 trucks as the first operation Scenario to haul 75000m3, After several trials it was found that the optimum operation strategy was operating with 5 excavators and 30 truck. Hauling and dumping operation for 75000m3 took (6,3 working days with 1190 m3/h)to finish

counclution In conclusion, simulation modeling is a valuable tool in construction management, enabling dynamic analysis and optimization of construction operations. Through techniques like Arena, professionals can gain insights into project complexities, make informed decisions, and enhance project performance.