警示标志牌 site requirement safety signage(横向)signage.pptx
jameslau9389
11 views
9 slides
Jun 15, 2024
Slide 1 of 9
1
2
3
4
5
6
7
8
9
About This Presentation
safety signage
Size: 118.25 KB
Language: en
Added: Jun 15, 2024
Slides: 9 pages
Slide Content
400*600mm VISITORS REPORT AT MAIN GATE1 BEFORE ENTERING TO SITE OFFICE 访客进入办公区请在 1 号门进行登记 2PIC 400*600
PROVISION OF ENGINEERING, PROCUREMENT, CONSTRUCTION AND COMMISSIONING (EPCC) FOR 500MW COMBINED CYCLE GAS TURBINE POWER PLANT IN MIRI, SARAWAK 施工材料堆放区 Construction Materials Storage Area
PROVISION OF ENGINEERING, PROCUREMENT, CONSTRUCTION AND COMMISSIONING (EPCC) FOR 500MW COMBINED CYCLE GAS TURBINE POWER PLANT IN MIRI, SARAWAK LIFTING IN PROGRESS KEEP AWAY 吊装作业中 请勿靠近
PROVISION OF ENGINEERING, PROCUREMENT, CONSTRUCTION AND COMMISSIONING (EPCC) FOR 500MW COMBINED CYCLE GAS TURBINE POWER PLANT IN MIRI, SARAWAK 材料堆放区 Materials Storage Area
PROVISION OF ENGINEERING, PROCUREMENT, CONSTRUCTION AND COMMISSIONING (EPCC) FOR 500MW COMBINED CYCLE GAS TURBINE POWER PLANT IN MIRI, SARAWAK 司机办公室 Driver’s Office
PROVISION OF ENGINEERING, PROCUREMENT, CONSTRUCTION AND COMMISSIONING (EPCC) FOR 500MW COMBINED CYCLE GAS TURBINE POWER PLANT IN MIRI, SARAWAK 车间办公室 Workshop Office
PROVISION OF ENGINEERING, PROCUREMENT, CONSTRUCTION AND COMMISSIONING (EPCC) FOR 500MW COMBINED CYCLE GAS TURBINE POWER PLANT IN MIRI, SARAWAK 工程测量点 请勿移动 Survey Point , Donot move
PROVISION OF ENGINEERING, PROCUREMENT, CONSTRUCTION AND COMMISSIONING (EPCC) FOR 500MW COMBINED CYCLE GAS TURBINE POWER PLANT IN MIRI, SARAWAK 高处作业培训点 Training Area for Working At Height
400*600mm 脚手架标准化样板 Scaffolding Structure Sample PROVISION OF ENGINEERING, PROCUREMENT, CONSTRUCTION AND COMMISSIONING (EPCC) FOR 500MW COMBINED CYCLE GAS TURBINE POWER PLANT IN MIRI, SARAWAK