Station Accessibility Plan(SAP) for Vijaynagar Metro Station by RK

RamKrishnaJagali 2,022 views 45 slides Dec 02, 2015
Slide 1
Slide 1 of 45
Slide 1
1
Slide 2
2
Slide 3
3
Slide 4
4
Slide 5
5
Slide 6
6
Slide 7
7
Slide 8
8
Slide 9
9
Slide 10
10
Slide 11
11
Slide 12
12
Slide 13
13
Slide 14
14
Slide 15
15
Slide 16
16
Slide 17
17
Slide 18
18
Slide 19
19
Slide 20
20
Slide 21
21
Slide 22
22
Slide 23
23
Slide 24
24
Slide 25
25
Slide 26
26
Slide 27
27
Slide 28
28
Slide 29
29
Slide 30
30
Slide 31
31
Slide 32
32
Slide 33
33
Slide 34
34
Slide 35
35
Slide 36
36
Slide 37
37
Slide 38
38
Slide 39
39
Slide 40
40
Slide 41
41
Slide 42
42
Slide 43
43
Slide 44
44
Slide 45
45

About This Presentation

Station Accessibility Plan for Vijayanagar (Bengaluru) Metro Station


Slide Content

STATION ACCESSIBILITY PLAN STUDY AREA - VIJAYNAGAR, BENGALURU, KARNATAKA SUMMER INTERNSHIP 2015 Mentors : Yougal Tak Sonal Kulkarni Ragini Nagisetty Project Team : Ramkrishna J Shivuprasad G Srinivas B V Keerthi G B

SAP is to be prepared within the overall framework of the National Urban Transport Policy (2006) . PRIME FOCUS – equitable allocation of road space with people, rather than vehicles encourage greater use of public transport and non-motorized modes. Safe access to station. ABOUT STATION ACCESSIBILITY PLAN – PROJECT BREIF AIM - To encourage sustainable modes of transport by i ntegrating walking, bicycling, public transport and intermediate public transport (IPT). OBJECTIVES - Ensure seamless connectivity between the metro and other modes of transport Improve non-motorized access to the metro station & surrounding areas Propose DCR to facilitate TOD and non-motorized access Why is Safe Access important? What does it cover? • Pedestrian & Bicyclists- NMT Prioritization • Multimodal Integration • First and Last mile connectivity • Minimize Traffic conflicts- pedestrian & vehicular • Upgraded infrastructure facilities VIJAYNAGAR METRO STATION ENTRANCE BANGLORE METRO RAIL ALIGNMENT – PHASE I BMRCL is working on Phase-I which is divided into 4 reaches. Our Project comes under Reach-2 (Mysore Road- Magadi Road).

GLIMPSES OF VIJAYNAGAR METRO STATION

LOCATION AND CONTEXT ANALYSIS Population of Bangalore city - 5.67 million (2001) 8.6 million (2011) Vijaynagar metro station is located on Magadi Chord Road on western part of the city. It is mainly surrounded by residential area including institutions, health centers, commercial centers and Vijaynagar TTMC. Project area is accessed by only one arterial road i.e. Magadi Chord Road. Other major roads are: 1st Main Rd. 5 th Main Rd. 22nd Main Rd. Marenahalli Road Study Area includes 7 wards namely 104, 105, 123, 124, 125, 126, 133. POPULATION OF STUDY AREA - 84034 TOTAL STUDY AREA - 2sq.km

METHODOLOGY Station area delineation and data collection Building heights Built use Road Character Street furniture Digitisation of land use map & related data Softwares- GIS, AutoCAD Existing condition analysis via maps and sample size estimation for HH& opinion survey Population Estimation Passenger B/A Data for Metro Station H.H Survey OD & Trip purpose Mode choice Waiting time Income /expenditure Vehicle ownership Accessibility Issue Data analysis & preliminary recommendation Enforcement Management Planning Detailed designs Software's- SketchUP, AutoCAD Documentation of report Softwares- Microsoft Word Microsoft Power point Adobe Illustrator OD & Trip purpose Opinion Survey Pedestrian Cyclist

STUDY AREA DELINEATION

VIJAYNAGAR: EXISTING ROAD SECTION (40M) Arterial Road Section-40m road (near Bus Stand)

VIJAYNAGAR: EXISTING ROAD SECTION 12M Collector Road Section- 12m road (with on street parking)

VIJAYNAGAR: EXISTING ROAD SECTION 12M Collector Road Section- 12m road (with on street parking and encroachment)

VIJAYNAGAR: EXISTING ROAD SECTIONS Local Road Section- 9m and 6m road (with on street parking and encroachment)

VIJAYNAGAR 2015: ISSUES (COLLECTOR ROAD):12mROW UNPAVED/BROKEN FOOTPATHS HINDRANCES IN THE FOOTPATHS ILLEGAL ONSTREET PARKING AND ENCROACHMENTS

VIJAYNAGAR 2015: ISSUES (SERVICE ROAD A SERVICE ROAD: 8m ROW ENCROACHMENTS RESULTING IN REDUCING THE ACTUAL ROW ILLEGAL ON STREET PARKING BROKEN, UNPAVED, DISCONTINUOUS FOOTPATHS 8.0 6.0

VIJAYNAGAR 2015: ISSUES (LOCAL ROAD):8mROW ON STREET PARKING SOLID WASTE DUMPING ON THE ROADS NO FOOTPATHS AND UNCOVERED DRAINAGE NO PROPER SURFACE BITUMEN COURSE

WARD NO. % OF AREA 104 60 105 5 123 33 124 50 125 80 126 30 133 25 VIJAYNAGAR: WARD DISTRIBUTION

VIJAYNAGAR: SAMPLE SELECTION TOTLAL POPULATION OF STUDY AREA- 84034 NO OF WARDS- 7 SAMPLE SIZE- 3% of total population (2500 samples) Considering the population of the respective wards in the study area ( CENSUS2011 ) further distribution of samples for each ward have been taken. WARD NO % DISTRIBUTION TOTAL NO OF SAMPLES NO OF SAMPLES (HIG) NO OF SAMPLES (MIG) NO OF SAMPLES (LIG) NO OF SAMPLES (EWG) 104 19 480 134 195 125 7 105 2 50 21 21 7 123 16 400 123 162 89 2 124 22 550 199 224 102 2 125 20 500 152 234 105 4 126 11 275 91 116 57 3 133 10 250 75 105 60 PASSENGER PERCEPTION SURVEY SAMPLING DAILY BOARDING/ALIGHTING PASSENGERS FOR VIJAYNAGAR(2021) [DPR phase1] 69050 ppl PER HOUR BOARDING/ALIGHTING PASSENGERS 2877ppl CONSIDERING 5% SAMPLE SIZE 200 SAMPLES 104 123 124 133 125 126 105 PEDESTRIAN PERCEPTION SAMPLING Pedestrian 800 Cyclist 200

2500 SAMPLES 1000 SAMPLES VIJAYNAGAR: SURVEY CLASSSIFICATION HOUSEHOLD SURVEYS OPINION SURVEYS 800 SAMPLES 200 SAMPLES pedestrians cyclists Safety Accessibility Mode choice Convenience Modal Split Satisfaction Level Affordable Inclusiveness Road Condition Street Furniture Signages Comfort Feasibility User Friendly

VIJAYNAGAR: FORM SAMPLES( OPINION/ PERCEPTION) SOURCE- DULT

VIJAYNAGAR: FORM SAMPLES( HOUSEHOLD) SOURCE- DULT

VIJAYNAGAR: HOUSEHOLD SURVEY ANALYSIS(2500 SAMPLES) 41% 23% 18% 1 % Source- primary survey 44% MIG Max Travel Distance- 120km < 5000 5000 - 25000 25000 - 50000 > 50000 AVG. TRIP LENGTH DISTANCE WORK TRIP 10.6 km EDUCATION TRIP 5.3 km SHOPPING TRIP 5.9 km 16% 1 %

VIJAYNAGAR: HOUSEHOLD SURVEY ANALYSIS (2500 SAMPLES) Dominant age group is 30-60

VIJAYNAGAR: HOUSEHOLD SURVEY ANALYSIS (2500 SAMPLES) Since, all the parameters of condition of footpath are almost in the same range. So, there is a need of equal improvement of all parameters. The blocking of footpath is mainly due to parking. So, there is a need of on street parking (i.e., parallel on street parking). Since, other type of parking will take more carriageway width.) 30° parking - 4.66m 45° parking - 5.31m

VIJAYNAGAR: HOUSEHOLD SURVEY ANALYSIS(2500 SAMPLES)

VIJAYNAGAR: HOUSEHOLD SURVEY ANALYSIS (2500 Samples) Dominant age group-30-60 (44%) Dominant income group-MIG (44%) Source- primary survey

VIJAYNAGAR: HOUSEHOLD SURVEY ANALYSIS(2500 SAMPLES) ISSUES WITH FOOTPATH Source- primary survey Major Problems DIRTY FOOTPATHS UNEVEN FOOTPATHS ABSENCE OF FOOTPATHS

VIJAYNAGAR: ISSUES ON STREET CnD WASTE ON FOOTPATH

VIJAYNAGAR: ISSUES ON STREET ONSTREET PARKING OPEN DRAINAGE AND ABSENCE OF FOOTPATHS SOLID WASTE DUMPING CREATING NUISANCE

VIJAYNAGAR: ISSUES ON STREET CnD WASTE PARKING ON FOOTPATH BARRIERS ON WALKWAY

VIJAYNAGAR: MAJOR ISSUES......

VIJAYNAGAR: TRANSIT USER SURVEY ANALYSIS(25 SAMPLES) 18% Dominant user group

VIJAYNAGAR: IPT USER (HH SURVEY ANALYSIS)

VIJAYNAGAR: IPT USER (Opinion SURVEY ANALYSIS)

VIJAYNAGAR: IPT USER (Opinion SURVEY ANALYSIS)

Proposal -1 for 1 st main road VIJAYNAGAR: Proposal for 1 st main road

Cross section of 1 st main road Cross section of Cross road Cross section of Service road VIJAYNAGAR: Proposal for 1 st main road

Proposal -2 for 1 st main road VIJAYNAGAR: Proposal for 1 st main road

Cross section of 1 st main road VIJAYNAGAR: Proposal for 1 st main road

Vijayanagar: Proposal for 5 th main road BOLLARDS PROVIDED TO RESTRICT ENTRY OF TWO WHEELERS STREET FURNITURE VIJAYNAGAR: Proposal for 5 th main road

VIJAYNAGAR: Proposal for 5 th main road

VIJAYANAGAR: Proposal for 5 th main road

VIJAYANAGAR: Proposal for Cycle lane on main roads Proposed Cycle Lane for 4 main roads

A FEW STEPS TOWARDS SAFE ACCESSIBILITY

PEDESTRIAN WALKABILITY INDEX WHAT IS IT? SAFETY AND SECURITY POLICY SUPPORT CONVEINIENCE/ AESTHETICS Safety measures at intersections Feeing of being safe Pedestrian planning programs City plans – Pedestrian networks Length of the Road to cross Coverage from weather Elements (Tree canopy) Footpath blocks( parked trees or poles can be obstruction)

TO FULFILL THE NEED, TAKE THE LEAD Assign small management tasks to the residents and in return recognise them for their work. This would reduce enforcement issues and ease out the pressure from local civic authorities. Community participation is the need of the hour, as all the issues cannot be solved by the local authorities as well as planners. To develop a sense of awareness and responsibility among the residents of Vijayanagar , towards the betterment of their locality.

OTHER RECOMMENDATIONS ENFORCEMENT MANAGEMENT PLANNING Street Vending Act 2014 should be implemented in certain areas (Informal Markets) Levy taxes on On- street parking. Implementation of building bylaws (setbacks). Signal synchronization at major intersections Provision of dedicated cycle tracks, parking spaces, pedestrian walkways. Provision of ramps on footpath to ensure accessibility to the vulnerable groups. After every 500m there should be a dustbin. Encouraging community participation.