Sunset Hills Road Walkway

fairfaxcounty 236 views 8 slides Jun 29, 2016
Slide 1
Slide 1 of 8
Slide 1
1
Slide 2
2
Slide 3
3
Slide 4
4
Slide 5
5
Slide 6
6
Slide 7
7
Slide 8
8

About This Presentation

Sunset Hills Road Walkway


Slide Content

Sunset Hills Road Walkway Contract No. CN15304071 Project No. ST-000021-017 Task Order No. 101 Hunter Mill District May 25, 2016

Sunset Hills Road Walkway Capital Facilities/Utilities Design and Construction Division/Transportation and Stormwater Construction Branch

Sunset Hills Road Walkway Capital Facilities/Utilities Design and Construction Division/Transportation and Stormwater Construction Branch Description: The Sunset Hills Walkway project was substantially completed on May 2, 2016.   The scope of this improvement project included construction of a pedestrian walkway, curb ramps, stormwater improvements, rest area, and bus pads. Project Overview: 1,570 LF of new walkway and curb ramps. Installation of 136 LF of stormwater pipe, 3 stormwater structures 303 LF of new resurfacing of the W&OD trail. Rest area near the W&OD trail with bench and water fountain. Two bus pads for future bus service. Project Team: Department of Transportation – Seyed Nabavi Utilities Design and Construction Division (UDCD) – Qais Bashir Project Inspector, UDCD – Keith Ferrell Survey Analyst, UDCD – Gregory Harper

Sunset Hills Road Walkway Hunter Mill District, Tax Map #18-3 Capital Facilities/Utilities Design and Construction Division/Transportation and Stormwater Construction Branch PROJECT SITE

Sunset Hills Road Walkway Construction of Walkway and Trail Capital Facilities/Utilities Design and Construction Division/Transportation and Stormwater Construction Branch

Capital Facilities/Utilities Design and Construction Division/Transportation and Stormwater Construction Branch Sunset Hills Road Walkway Construction of Rest Area

Sunset Hills Road Walkway Capital Facilities/Utilities Design and Construction Division/Transportation and Stormwater Construction Branch

Pedestrian and Transit Improvements - Nutley Street at Barrick Street, Bus Sites 6226 & 6227 Capital Facilities/Utilities Design and Construction Division/Transportation and Stormwater Construction Branch Matthew Kaiser, Public Information Officer 703-324-5034, TTY 711 [email protected]