RAILWAY TRACK ATTENTION
Size: 5.19 MB
Language: en
Added: Jan 05, 2024
Slides: 33 pages
Slide Content
AFTE R TRC Sr.DEN /C o- ord / NED NANDED DIVISION 1 8 -12-2023
2 PEAKS S T ANDARD D EVIATION BLOCK BLOCK SECTION YARD UML NBML PML LONG CHORD SHORT CHORD TRC GLOSSARY TQI UNEVENNESS ALIGNMENT TWIST GUAGE
UNEVENNESS ALIGNMENT TW IST GUAGE PEAKS PEAKS PEAKS V E R T I C A L A C C E L E R A T I O N L A T E R A L A C C E L E R A T I O N PEAKS PEAKS, S T ANDARD DEVIATION BLOCKS PEAKS, STANDARD DEVIATION BLOCKS T R C M E A S U R E S
SD (Blocks) NBML PML PEAKS UML NBML MISSING FITTINGS SLEEPERS INFRINGE- MENTS BALLAST STATUS VEGE T A TION STATUS 4 OTHERS PML 40% for Block Sections 50% for Yards SD (Block Sections&Yards) TRC RESULTS
5 TRC ANALYSIS
1 SSE / P W A Y ( I NCHAR G E) A D EN D EN 2 3 DE T A I LED ANA L YS I S P r epa r e One sheet for each block section and Y ar d incorporating the TRC Results of Peaks & SDs of UML/NBML/ PML Make an Action plan Summary ABS T RACT ANA L YS I S Based on PWI Analysis, ‘Number of tamping days’ r equi r ement to be assessed Summary of block sections (to be tamped) along with priority will be prepared PLANNING OF T AMP I NG MACHINES Based on ADEN Analysis, the r equi r ement of Machines and further deployment to be planned Studying the TQI patte r n of KMs over the di f fe r ent TRC Runs, Long te r m planning to be made 3 Stages of ANALYSIS
7 P W I P R O F O R M A
8 P W I P R O F O R M A
9 PWI ANALYSIS (Each Block Section in A3 Size Sheet) ANALYSIS OF UP LINE ANALYSIS OF DOWN LINE SUMMA R Y OF UP LINE SUMMA R Y OF DOWN LINE
10 H O W T O F I L L Where to get these details for 1-4 rows ? Where to get these details Where to get these details for 5th row ?
Home page of SSE/P.Way TMS login Process to take details for 1 to 4 rows
Report (S-Z) TRC TRC Parameters at a Glance Process to take details for 1 to 4 rows
TRC Parameters at a Glance (Tab) Process to take details for 1 to 4 rows
TRC Parameters at a Glance (Page) Process to take details for 1 to 4 rows
1. UML PEAKS Process to take details for 1 to 4 rows
SUMMARY 1 Peak in 1st block 2 peaks in 2nd block 1 Peak in 3rd block 1 Peak in 4th block 1. UML PEAKS - Detailed Report 436km 623m means 4th block 337m means 2nd block 491m means 2nd block 157m means 1st block 530m means 3rd block Process to take details for 1 to 4 rows
2. NBML PEAKS Process to take details for 1 to 4 rows
3. NBML BLOCKS (SD) Process to take details for 1 to 4 rows
3. NBML BLOCKS (SD) - Detailed Report Process to take details for 1 to 4 rows
4. PML BLOCKS (SD) Process to take details for 1 to 4 rows
21 H O W T O F I L L Where to get these details for 1-4 rows ? Where to get these details Where to get these details for 5th row ?
Report (S-Z) TRC TRC Analysis (TQI Based) Process to take details for 5t h r ow
23 TRC Inspection Analysis Process to take details for 5t h r ow
24 TRC Inspection Analysis Process to take details for 5t h r ow
25 TRC Inspection Analysis Process to take details for 5t h r ow
26 H O W T O F I L L Where to get these details for 1-4 rows ? Where to get these details Where to get these details for 5th row ?
27 Report (S-Z) TRC ITMS Reports Process to take details for 6t h-8th r ows
28 ITMS Reports Process to take details for 6t h-8th r ows
29 ITMS (Exception Report) 559km 4th Block 36 sleepers are with defective Process to take details for 6t h-8th r ows
30 ITMS (Exception Report) 555km 2nd Block 102 fittings are with loose/missing Process to take details for 6t h-8th r ows
31 A D E N P R O F O R M A Based on PWI analysis Sheet SUMMA R Y
PLANNING OF ATTENTIONS UML Peaks to be attended immediately Independent NBML peaks to be attended manually NBML Block (having NBML Peaks +PML blocks) – Plan for tamping Independent PML blocks – Plan for tamping All Gauge peaks to be attended manually Depute Gang/Keymen in their respective section for attention Check whether the NBML Blocks/peaks exceeding limits at these fittings defects locations If defect found at continuous st r etch, initiate the p r oposal if conditions satisfying for renewals