VTC0120004 OJT.ppt BBBBBBBBBBBBBBBKJKK,KK

nijuniju286 14 views 43 slides Oct 03, 2024
Slide 1
Slide 1 of 43
Slide 1
1
Slide 2
2
Slide 3
3
Slide 4
4
Slide 5
5
Slide 6
6
Slide 7
7
Slide 8
8
Slide 9
9
Slide 10
10
Slide 11
11
Slide 12
12
Slide 13
13
Slide 14
14
Slide 15
15
Slide 16
16
Slide 17
17
Slide 18
18
Slide 19
19
Slide 20
20
Slide 21
21
Slide 22
22
Slide 23
23
Slide 24
24
Slide 25
25
Slide 26
26
Slide 27
27
Slide 28
28
Slide 29
29
Slide 30
30
Slide 31
31
Slide 32
32
Slide 33
33
Slide 34
34
Slide 35
35
Slide 36
36
Slide 37
37
Slide 38
38
Slide 39
39
Slide 40
40
Slide 41
41
Slide 42
42
Slide 43
43

About This Presentation

ON JOB TRANING


Slide Content

WELCOME
TO
ON JOB TRAINING
REPORT

31
st
BATCH
2020-2023

DESIGN A TWO CAVITY THREE PLATE MOULD FOR THE
GIVEN COMPONENT

ON JOB TRAINING
REPORT
TWO CAVITY
THREE PLATE
MOLUD

INTODUCTION
As a part of our curriculum
we the final year students of
Diploma in Tool Engineering and
Digital Manufacturing, need to do
ON JOB TRAINING REPORT on
specific topic by utilizing all the
knowledge gained during the
curriculum and its helps on
validating our DESIGNING
KNOWLEDGE.

ACKNOWLEDGEMENT
FIRST WE THANK TO
Our Honorable Principal: Mr. Surendhar
Report Incharge: Mr. Ram prasath

DESIGN SELECTION
We the trainees of D3 Section have collected
different types of press tool and Mould
components and finally selected the mould
component design.

PROPOSED METHOD
 The Selected Component Required tool for
Double Cavity mould and it used a injection Moulding
Machine.
 The Plastic material (PP) are Feed into the Hopper,
the material transfer from liquid state due to heat
 Inject the molten plastic material in to the mould
 After that, the component get Cool and Solidifies
and ejected the final part.

PROPOSED METHOD

TOLERANCE DETAILS:
- 0
2. Ø22.00 - +0.1 ( FD )
- 0
3.Ø30.00 - +0.1 ( NFD)
-0
4.Ø26.00 - +0.1 ( NFD )
-0
5.Ø14.00 - +0.1 ( NFD )
6.Ø18.00 - +0.1 ( FD )
-0
NOTE :
FD – FUNCTIONAL DIMENSION
NFD – NON-FUNCTIONAL DIMENSION

GIVEN COMPONENT
FRONT VIEW

3D COMPONENT DRAWING

COMPONENT DETAILS:
MATERIAL: PET(Polyethylene
terephthalate)
COLOUR: Dark blue
SHINKAGE: 1.5%
WT./COMP: 5.52GMS

SHRINKAGE
CALCUATION

TOOL TOP VIEW:

3D VIEW OF TOOL :

TOOL FRONT VIEW:

BILL OF MATERIAL:
10
PILLAR,BUSH AND CENTERING
BUSH
4 E230 Ø32 214.7 CASE HARDENED
9 FEED PLATE 1 MS 26X146 33 -
8 BOTTOM PLATE 1 MS 26x196 196 -
7 EJECTOR RETAINER 1 MS 16x72 196 -
6 EJECTOR PLATE 1 MS 12x72 196 -
5 HEEL BLOCK 2
MS 47x36
196 -
4 CORE BACK PLATE 1 MS 26x146 196 -
3 CORE PLATE 1 P20 36x146 196 30-32 HRC
2 CAVITY PLATE 1 P20 36x146 196 30-32 HRC
1 TOP PLATE 1
MS 26x196
196 -
S/NO DESCRIPTION QTY
MAT
SIZE LEN REMARKS
TWO CAVITY THREE PLATE MOULD
SCALE 1:1
DRN :
TRD :
 
CHD :
APD :
D3A NIJANTHAN K ALL DIMENSION ARE IN "MM Pg.no:01

RAW MATERIAL COST:
NETTUR TECHNICAL TRAINING FOUNDATION - VELLORE
CP01 DIPLOMA IN TOOL ENGINEERING AND DIGITAL MANUFACTURING, MAY 2023
RAW MATERIAL COST
TEAM CODE  PROJECT NAME DESCRIPTION PREPARED BY
D3  COMPONENT THREE PLATE TWO CAVITY MOULD NIJANTHAN.K
S.NO DESCRIPTION QUANTITY MATERIAL THICKNESS / DIAMETER WIDTH LENGTH WEIGHT IN KG RATE PER KG R.M. COST
1 TOP PLATE 1 MS 26 196 196 6 90

540.00
2 CAVITY PLATE 1 MS 36 146 196 4 90

360.00
3 CORE PLATE 1 MS 36 146 196 4 90

360.00
4 CORE BACK PLATE 1 MS 26 146 196 4 90

360.00
5 PARALLEL BLOCK 2 MS 47 36 196 3 90

270.00
6 EJECTOR PLATE 1 MS 12 72 196 2 90

180.00
7 RETAINER PLATE 1 MS 16 72 196 2 90

180.00
8 BOTTOM PLATE 1 MS 26 196 196 6 90

540.00
9 CAVITY INSERT 4 MS 36 70 140 1 90

90.00
10
PILLER, BUSH AND CENTERING
PILLER
1 MS 32 _ 215 4 90

360.00
11 STRIPPER PLATE 1 MS 10 56 196 1 90

90.00
12 RETURN PIN 1 MS 18 _ 180 1 90

90.00
13 SPRUE PULLER PIN 1 MS 13 _ 90 1 90

90.00
14 SPRUE BUSH 1 MS 38 _ 60 1.5 90

135.00
15 REGISTER RING 1 MS 125 _ 12 2 90

180.00
16 FEED PLATE 1 MS 36 _ 400 2 90

180.00
TOTAL RAW MATERIAL COST FOR THE PROJECT

3,465.00

PROCES CHART

OPERATION CARRIED ON
TOP
PLATE:
1. SIZE 26 x 196 x196
2. MATERIAL MS
3. OPERAIONS CARRIED
MILLING, GRINDING,
DRILLING
4. TOP PLATE PURPOSE
IT IS THE BASE FOR
HOLDING THE CAVITY

OPERATION CARRIED ON
BOTTOM PLATE:
1. SIZE 26 x 196 x 196
2. MATERIAL MS
3. OPERAIONS CARRIED
MILLING, GRINDING,
DRILLING,
BENCH WORK
4.
BOTTOM PLATE
PURPOSE
BOTTOM PLATE ACT AS
THE BASE FOR THE
ENTIER TOOL

OPERATION CARRIED ON
CAVITY PLATE:
1. SIZE 36 x 146 x 196
2. MATERIAL MS
3. OPERAIONS CARRIED
MILLING,
GRINDING,DRILLING,
BENCH WORK
4.
CAVITY PLATE
PURPOSE
IT IS USED TO FORM
EXTERNAL FEATURES OF THE
MOULD

OPERATION CARRIED ON
CORE PLATE:
1.SIZE 36 x 146 x 196
2.MATERIAL MS
3.OPERAIONS CARRIED
MILLING, GRINDING,
DRILLING,
BENCH WORK
4.CORE PLATE PURPOSE
IT HOLDS THE CORE
INSERTS

OPERATION CARRIED ON
CORE BACK PLATE:
1. SIZE 26 x 146 x 196
2. MATERIAL MS
3. OPERAIONS CARRIED
MILLING, GRINDING,
DRILLING,
BENCH WORK
4.
CORE BACK PLATE
PURPOSE
IT IS USED TO CLAMPING
THE CORE INSERTS.

OPERATION CARRIED ON
HEEL BLOCK:
1. SIZE 36 x 47 x 196
2. MATERIAL MS
3. OPERAIONS CARRIED
MILLING, GRINDING,
DRILLING,
BENCH WORK
4. HEEL BLOCK PURPOSE
IT PROVIDES SPACE FOR
EJECTOR PLATE
ASSEMBLY

OPERATION CARRIED ON
EJECTOR RETAINER PLATE :
1.SIZE 16 x 72 x 196
2.MATERIAL MS
3.
OPERAIONS
CARRIED
MILLING, GRINDING, DRILLING,
BENCH WORK
4.
EJECTOR
RETAINER
PLATE
PURPOSE
IT HELPS THE EJECTOR PLATE TO
EJECT THE COMPONEET FORM THE
CORE

OPERATION CARRIED ON
EJECTOR PLATE:
1. SIZE 12 x 72 x 196
2. MATERIAL MS
3. OPERAIONS CARRIED
MILLING, GRINDING,
DRILLING,
BENCH WORK
4.
EJECTOR PLATE
PURPOSE
IT EJECTS THE
COMPONET FROM THE
CORE

OPERATION CARRIED ON
REGISTER RING:
1. SIZE DIA 125 x 12
2. MATERIAL MS
3. OPERAIONS CARRIED
LATHE, C. G,
BENCHWORK
4.
REGISTER RING
PURPOSE
IT USE TO LOCATE A
TOOL CENTRE TO THE
MACHINE NOZZEL.

OPERATION CARRIED ON
SPRUE BUSH:
1. SIZE DIA 38 x 60
2. MATERIAL MS
3.
OPERAIONS
CARRIED
LATHE, C. G, BENCHWORK
4.
SPRUE BUSH
PURPOSE
ITS IS USED TO INJECT THE
MATERIAL INTO THE
RUNNER.

OPERATION CARRIED ON
RETURN PIN:
1. SIZE DIA 18 x 180
2. MATERIAL MS
3. OPERAIONS CARRIED LATHE, C. G, BENCHWORK
4.
EJECTOR RETURN PIN
PURPOSE
IT EJECTS THE STRIPPER
PLATE.

OPERATION CARRIED ON
GUIDE PILLAR:
1. SIZE DIA 32 x 87
2. MATERIAL MS
3. OPERAIONS CARRIED
LATHE, C. G,
BENCHWORK
4.
GUIDE PILLAR
PURPOSE
IT ALLIGN THE TOP
HALF AND BOTTOM
HALF.

OPERATION CARRIED ON
GUIDE BUSH WITH SPYGOT:
1. SIZE DIA 32 x 45
2. MATERIAL MS
3. OPERAIONS CARRIED
LATHE, C. G,
BENCHWORK
4. GUIDE BUSH PURPOSE
IT IS USED TO GUIDE THE
GUIDE PILLAR.

OPERATION CARRIED ON
REST BUTTON:
1. SIZE DIA 20 x 4
2. MATERIAL MS
3. OPERAIONS CARRIED
LATHE, C. G,
BENCHWORK
4.
REST BOTTOM
PURPOSE
TO REST THE EJECTION
ASSEMBLY AND TO AVOID
THE DAMAGE WHEN PUSH
BACK

OPERATION CARRIED ON
SPRUE PULLER PIN:
1.SIZE DIA 13 x 90 1.
2.MATERIAL MS 2.
3.
OPERAIONS
CARRIED
LATHE, C. G,
BENCHWORK
3.
4.
SPRUE PULLER
PIN PURPOSE
IT IS USED TO
PULL THE
SPRUE OUT OFF
SPRUE BUSH.
4.

OPERATION CARRIED ON
STRIPPER PLATE:
1. SIZE 10 x 56 x 196
2. MATERIAL MS
3. OPERAIONS CARRIED
MILLING, GRINDING,
DRILLING,
BENCH WORK
4.
STRIPPER PLATE
PURPOSE
IT EJECTS THE
COMPONET FROM THE
CORE PIN WITHOUT
ANY DAMAGE.

OPERATION CARRIED ON
CENTERING BUSH :
1. SIZE DIA 32 x 83
2. MATERIAL MS
3. OPERAIONS CARRIED
LATHE, C. G,
BENCHWORK
4. GUIDE BUSH PURPOSE
IT IS USED TO GUIDE THE
GUIDE PILLAR.

OPERATION CARRIED ON
CAVITY INSERT :
1. SIZE 36 x 70 x 140
2. MATERIAL MS
3. OPERAIONS CARRIED
MILLING, GRINDING,
DRILLING,
BENCH WORK
4.
CORE INSERT
PURPOSE
IT USE TO FPRM An
INTERNAL SHAPE OF THE
COMPONENT.

1. SIZE 36 x 70 x 140
2. MATERIAL MS
3. OPERAIONS CARRIED
MILLING, GRINDING,
DRILLING,
BENCH WORK
4.
CORE INSERT
PURPOSE
IT USE TO FPRM An
INTERNAL SHAPE OF THE
COMPONENT.
FEED PLATE :
OPERATION CARRIED ON

CONCLUSION:
 Finally, we thank our NTTF management for providing us the
opportunity to do the on job training and to complete it successfully.
We have taken almost 15 days to complete the project .
All that was involved in the project is efficient design, systematic work
and co-operation and co-ordination from all team members, section
in charge and all other staff members to me