Bill Of Material SAP PP
Agenda: Bill of Material What is Bill of Material BOM categories BOM Status and BOM Usage Creation of Bill of Material BOM Header Data & Item Data Item Category Single level BOM & Multi level BOM Alternate BOM or Multiple BOM Recursive BOM Low level Code BOM Reporting Configuration related to Bill of Material
Overview – Bill of Material
Bill of Material – Example 1
Bill of Material – Example 2
BOM - Terminology
BOM Usage
BOM Usage The bill of material usage allow you to create separate BOMs for the various areas within the company, for example, engineering or production. The engineering BOM combines all components of the product from the engineering point of view and contains all technical data. The production BOM is set up from the manufacturing points of view. For example, process data is required for assembly. When creating BOMs with different usages for one material, the system saves each BOM with a separate internal number for each usage.
BOM Categories BOM Categories define the connection to an object Material BOM's are used in SCM to represent the structure of products that are manufactured Order BOWs are used to produce a product for a specific sales order Document structure can consist of several documents, for example, a program, technical drawings, paper documents, and photographs Equipment BOM's are used in Plant Maintenance to describe the structure of a piece of equipment Functional location BOMs are used in plant maintenance to link equipment to specific locations.
BOM Categories
BOM Structure
BOM Status The BOM status controls BOM processing in different application areas. When you configure your system in Customizing under Bill of Material Define BOM status, you define the statuses for different indicators that allow or disallow BOM processing. BOM A : A BOM with status 1 can be exploded in MRP and released for a planned order. BOM B : A BOM with status 2 cannot be exploded in MRP or released for a planned order.
BOM Status
Item Category The item category defines the features and functions of an item. The item category identifies whether special data must be processed, and controls further system activities. The item category controls following Is it necessary to enter a material? Does the item support quantity-based inventory management? Are both plus and minus signs supported? Are sub items supported? Which screens are selected and how does the screen layout of the item detail screens Note that you cannot change the item category after you have entered the item. You can only correct an entry for the item category by deleting the item and then creating a new one.
Item Category
Item Category – Stock/Non-Stock Items
Multi level BOM BOM containing materials that have their own BOMs (assemblies)
Recursive BOM A BOM is recursive if the product contains a component that has the same object number as the product.
Alternate BOMs or Multiple BOMs One product may be made of different combinations of components, depending n the quantity (lot size) to be manufactured or the date. This type of product is often represented by alternative BOMs (alternatives). These alternative BOMs differ only slightly from one another, usually in terms of the component quantity. The field BOM group can also be used as an external BOM number. All alternatives for a multiple BOM are saved under one internal BOM number. You can assign one name to all the alternatives in a multiple BOM by entering a BOM group in the BOM header.
Low-level Code The low-level code is the lowest explosion level on which a material occurs in all product structures. When you create a BOM, a low-level code is automatically assigned to each material which is used in MRP and costing. Low-level codes are used in material requirements planning (MRP) to determine the sequence in which materials are planned and by product costing to determine how costs are rolled up. Low-level coding takes account of the fact that a material may be used in multiple products and on multiple production levels of one product.
Low-level Code