33KV_&_25_KV_POWER_SUPPLY for railways.pptx

subhashchander400130 40 views 12 slides Jul 31, 2024
Slide 1
Slide 1 of 12
Slide 1
1
Slide 2
2
Slide 3
3
Slide 4
4
Slide 5
5
Slide 6
6
Slide 7
7
Slide 8
8
Slide 9
9
Slide 10
10
Slide 11
11
Slide 12
12

About This Presentation

PSI


Slide Content

AUXILIRY (33KV) & TRACTION (25 KV) POWER SUPPLY SCHEME IN DMRC BY – ASHISH ARORA DGM/ELECT 3 RD OCTOBER 2013

TRACTION (25Kv, 1-phase) – TO RUN THE TRAINS AUXILIARIES (33KV, 3-phase stepped down to 415V, 3-phase) – TO POWER ALL THE OTHER FACILITIES OF STATION LOADS – LIGHTING, VENTILATION, AC, LIFTS, ESCALATORS, ETC. ELECTRIC POWER IN METRO SYSTEM IS REQUIRED FOR-

The Electric Power for METRO services from Grid is available and received - in DELHI at 220kV, or 66 kV In UP at 132 kV In Haryana at 132 kV, or 66 kV

The 3-PHASE Electric Power from the Grid at 220kV , or 132 kV, or 66 kV as available at that location is received in DMRC Substation, termed as - RECEIVING SUBSTATION (RSS)

The above received 3-phase Power at 220kV or 132 kV or 66 kV in RSS is then stepped down to In Traction Substation (TSS) – 25kV 1-phase for powering the trains through OHE In Auxiliary Main Substation (AMS) – 33kV 3 phase to supply power to 33kV power supply Cable network to feed Auxiliary Substations (ASS) in each of the Metro stations.

SLD , Components , Protections Typical 66 kV RSS

SLD , Components , Protections Typical 25 kV TSS

SLD , Components , Protections Typical 33 kV AMS

33kv Cable network SLD, Components , Protections Typical 33 Kv /415V ASS – Elevated corridor

33kv Cable network SLD, Components , Protections Typical 33 Kv /415V ASS – Underground corridor

Sectioning Drawing Types of sectioning posts – SP, SSP, SS SLD, Components , Protections Typical 25 kV OHE/ ROCS Sectioning Drawing

THANK YOU
Tags