Picture no. 1
Claudius Peters
Clinker Cooler Technology
Picture no. 2
克劳迪斯 彼得斯
熟料冷却技术
Picture no. 3
Claudius Peters
Clinker Cooler Technology
Design and function
of the roller crusher
Picture no. 4
克劳迪斯 彼得斯
熟料冷却技术
辊式破碎机的
设计与功能
Picture no. 5
Roller Crusher
1 Intended use
2 Structure and function of the roller crusher
3 Operation of the roller crusher
4 Requirements for the start of the roller crusher
5 Alarm messages
6 Interlocking
7 Emergency power operation
8 Operating status
9 Maintenance work
Picture no. 7
Design of the roller crusher
Installed between stages
4 crushing rollers
Gear motor for roller drive
Speed monitoring
Rollers:
Shaft
24 crushing rings each
Cooling and sealing air for crusher
Picture no. 11
Design of crushing rings
Uneven surface
“teeth” at irregular intervals
Arranged alternately on shaft
Improved pulling in and crushing of
clinker
Picture no. 13
Design of crushing rings and shaft
Crushing shaft with rings Crushing rings
Picture no. 14
破碎环和破碎轴的设计
上环之后的破碎轴 破碎环
Picture no. 15
Roller rotating as shown
Rollers forming crushing pair
(no. 3 and 4)
Clinker gets between rollers
Clinker is crushed
Function of the roller crusher
Picture no. 17
Start of the crusher
Before start of crusher, start lane drive of grate 2
Start crusher in automatic operation
Do not start lane drive of grate 1 before start of crusher
Picture no. 19
Operation mode depends on portion of oversized clinker
Operation modes of roller crusher
A – automatic operation with one crushing pair
(LCM – Low crushing mode)
B – automatic operation with two crushing pairs
(HCM – High crushing mode)
C – interval operation with one or two crushing
pairs
Picture no. 20
具体选用哪种运行模式,要看大块熟料量多还是量少。
辊破的运行模式
A – 采用一对破碎组合自动运行 (LCM – Low
crushing mode低破模式 )
B – 采用两对破碎组合自动运行 (HCM – High
crushing mode高破模式 )
C – interval operation with one or two crushing
pairs 时而一对时而两对破碎组合,交替运行
Picture no. 21
LCM – Low crushing mode
Automatic operation with one crushing pair
last two rollers (no. 3 and 4) form crushing pair
Fine clinker separated on first rollers, coarse clinker
is crushed
HCM – High crushing mode
Automatic operation with two crushing pairs
Two crushing pairs (1+2 / 3+4)
High portion of coarse clinker can be crushed
Interval operation of the rollers
Alternating rotation of roller 2
Optimized distribution of material in case of high
portion of coarse clinker
Operation modes of roller crusher
HCM – High crushing mode 高破模式
采用两对破碎组合自动运行
两对破碎组合 (1号+2号、3号+4号)
可以破碎粗料量多的熟料
Interval operation of the rollers 破碎辊交替运行
2号破碎辊时而前转 ,时而后转
当熟料中含粗料多时 ,改善物料分配
辊破的运行模式
Picture no. 23
Overload caused by extremely hard clinker
Overload caused by metal parts
Detected by excessive motor current
Excessive motor current for too long time
Roller is stopped
Roller rotates in other direction
Roller stops
Roller rotates in original direction
Overload reversing
to minimize load peaks when changing direction
Fixed value adjustment: T
STP
= 4 seconds
Active reversing time T
RAC
Time of backward rotation
Longer than the stop time.
Recommendation of adjustment: T
RAC
= 12 seconds
Reversing waiting time T
RWA
Minimum time between two reversing cycles
protects drive and rollers
Recommendation of adjustment: TRWA = 12 seconds
Reversing cycle time T
RCY
Total time of reversing cycle
Reversing cycle
Picture no. 28
停止时间 (破碎辊停转时间 ) T
STP
将换向时出现的负荷峰值降到最低
固定值: T
STP
= 4 seconds
有效反转时间 T
RAC
往后转的时间
比停止时间长
建议设定为 : T
RAC
= 12 seconds
反转等待时间 T
RWA
反转循环结束后,起码要等待一段时间之后,才能开始
下一次反转循环。这段时间就是反转等待时间。
保护驱动和破碎辊
建议设定为 : TRWA = 12 seconds
反转循环时间 T
RCY
反转循环总共耗费的时间
反转循环
Picture no. 29
Reversing monitoring time (T
RMO
)
started for every reversing cycle.
Reset if no further reversing happens
Recommendation of adjustment: T
RMO
= 2 * T
RCY
(= 48 seconds)
1st alarm delay reversing fault (warning) (T
RAD1
)
Alarm if monitoring time is still active after this time
Recommendation of adjustment: T
RAD1
= 5 * T
RCY
(= 120 seconds =
2 minutes)
2nd alarm delay reversing fault (disconnection) (T
RAD2
)
Stop of crusher if monitoring time is still active after this time
Obstructions in crusher have to be removed manually
Recommendation of adjustment: T
RAD2
= 10 * T
RCY
(= 240 seconds =
4 minutes)
Reversing monitoring
反转监视时间 (T
RMO
)
•从每次反转循环开始时算起
•如果反转再没有出现 ,就会归零
•建议设定为 : T
RMO
= 2 X T
RCY
(= 48 seconds)
反转故障 1次报警延时 (警告) (T
RAD1
)
•过了这段时间之后 ,如果监视时间还有 ,就会发出报警
•建议设定为 : T
RAD1
= 5 X T
RCY
(= 120 seconds = 2 minutes)
反转故障 2次报警延时 (断电) (T
RAD2
)
•过了这段时间之后 ,如果监视时间还生效 ,辊式破碎机就会停机
•卡阻破碎机运行的东西要人工清除
•建议设定为 : T
RAD2
= 10 X T
RCY
(= 240 seconds = 4 minutes)
反转监视
Picture
no. 30
Picture no. 33
Reversing monitoring
Picture no. 34
反转监视
Picture no. 35
Overfilling above the rollers
Can occur due to intense fall of kiln coating
No danger for damages to crusher
If necessary, reduce raw meal feed and lane speed on
grate 1
Overfilling below the rollers (several rollers stop)
Possible causes:
Standstill of grate 2
Lane speed of grate 2 too low
Remedy:
Check movement of grate 2
Increase lane speed of grate 2
Troubleshooting
Picture no. 37
Troubleshooting
Roller drive failure
Rotation of rollers is monitored
In case of drive failure, manual
operation of remaining rollers
If necessary, reduce raw meal feed!
Ring fracture
Ring fracture very unlikely
Operation with 2 rings less per shaft possible
Broken rings have to be replaced as soon as possible
Picture no. 39
General condition of the crusher
Check for unusual sounds
Check bearing temperature
Check cooling / sealing air supply
Clean cooling ribs of motor
Daily inspection and maintenance
Picture no. 41
General condition of the crusher
Remove dirt / dust
Check crusher frame for signs of heat influence
Check for unusual sounds
Unusual sounds may indicate problems
Check bearing temperature
High temperatures can cause damages to bearing
High temperatures limit bearing lifetime
Daily inspection and maintenance
Picture no. 42
破碎机的大体情况
清除尘土
检查破碎机框架有无高温烧伤痕迹
检查有无异响
有异响,就可能有问题
检查轴承温度
温度高会导致轴承损坏
高温降低轴承使用寿命
每日检查和维护
Picture no. 43
Check cooling / sealing air supply
Check air ducts for leakages
Check function of fans
Insufficient air flow damages crusher!
Clean cooling ribs of motor
Only clean motor ribs can dissipate
motor heat
Dirty ribs result in overheated motor
Overheating damages motor!
Daily inspection and maintenance
Picture no. 45
Condition of crushing rings
Condition of bearing
Grease bearing
Check electrical connections
Check connection between motor and roller
Annual inspection and maintenance
Picture no. 49
Grease bearing
Dismantle bearing
Remove all old grease
Fill in 4 kg new grease per bearing:
Type: Norva HT2, Manufacturer: Esso
Viscosity: 480 cST at 40°C
Performance class: K2P-10, DIN 51502
Check electrical connections
Check if all cables are isolated and fastened properly
Fasten cables if required
Replace defective cables
Check connection between motor and roller
Check tensioning of all screws of connection between motor and
roller
Annual inspection and maintenance
Picture no. 51
Dismantling and installation of crushing roller
Deposit cross arm (Pos.1) on crusher support frame (Pos.2)
fix with existing pins of wearing plates (Pos.3).
Mount large carrying strap with carrying beam and rolling wagon
(Pos.4).
Disassemble nuts on fixed bearing (Pos.12) and screws on movable
bearing (Pos.5) for fastening the shifting plate.
dismantle cooling air hose (Pos.7).
Picture no. 53
Push the complete crushing roll (Pos.13) with movable bearing
unit out of the crusher housing.
Dismantling and installation of crushing roller
Picture no. 55
Assemble blind flange (Pos.14) to the crushing roll (Pos.13).
Now the complete roll can be removed.
The installation of the crushing roll takes place in reverse order.
When assembling the nuts (Pos.12) pull tight with 215 Nm.
Dismantling and installation of crushing roller
Picture no. 57
Dismantling and installation of crushing rings
Deposit cross arm (Pos.1) on crusher support frame (Pos.2) and fix
with existing pins of wearing plates (Pos. 3).
Mount large carrying strap with supporting beam (Pos.4).
Disassemble nuts on movable bearing (Pos.6) and screws (Pos.5) for
fastening the shifting plate.
Dismantle cooling air hose (Pos.7).
Remove complete movable bearing unit (Pos.8) with shifting plate
from working area.
Picture no. 59
Pull out all crushing rings (Pos.9) up to the carrying strap (Pos.4).
Dismantling and installation of crushing rings
Picture no. 60
将挂具( 4)之前的全部破碎环( 9)都拉出来。
Dismantling and installation of crushing rings
Picture no. 61
Secure crushing roll for shifting of carrying strap (Pos.10).
Push crushing rings (Pos.9) to the opening
mount small carrying strap on the supporting beam (Pos.11)
Dismantling and installation of crushing rings
Picture no. 62
固定好破碎辊 (10),以便更换吊带
将破碎环 (9)推到开口处
将小型挂具 (11)安装到横梁上
Dismantling and installation of crushing rings
Picture no. 63
Pull out all crushing rings (Pos.9).
The installation of the crushing rings takes place in reverse order.
When assembling the nuts of the movable bearing (Pos.6) pull tight
with 215 Nm.
Dismantling and installation of crushing rings