Presented by :

What is a Hanger Area ?
Provided an enclosure for
Servicing
Overhauling or renovation
work
Inspection work and
For repair works
of the aircraft

Types of Hanger
1)Tee Hanger 2) Cargolifter Hanger 3)Bellman Hanger
4) Bessonneau Hanger 5)Blister Hanger 6)Underground Hanger

How these are constructed ?
Steel Frames and covered with
galvanised iron sheets.
This may be of single hanger to
store large number of aircrafts.
Depends on peak hour volume of
aircrafts and their demand on
rental basis by different airline
agencies.

It also depends on size of aircraft as follows
For bigger aircrafts such as Airbus
A380,Antonov 225 and Boeing 747 comes
under XXL size.
size Door span (m)
S Less than 30m
M 30-60m
L 60-90m
XL 90-120m
XXL Greater than 120m

Hanger Site Location
Proximity to the loading aprons.
Far from the direction of frequent storms
to prevent damage of structures.
Proximity to and easy installation of
utilities, e.g. electricity, telephone, water
supply and sewers etc.

Sufficient area to provide car
parking facilities for working
personnel.
Topography providing good
natural drainage.
Future expansion facilities

Planning Considerations
Storage and service hangers occupy
more space of Terminal area.
Shape of hanger should cover minimum
land area and provide adequate space
for storage.
For small aircrafts , T-shaped hanger is
most desirable and economic design

OFFICE
SHOP
STORAGE
CLEAR DOOR OPENING
CLEAR DOOR OPENING
0.3 m
CLEAR DOOR OPENING
0.3 m
0.3m

Its important to observe that the area
should be large to accommodate different
aircrafts.
Minimum clearance of 0.30 meters.
For bigger aircrafts –nose hangers are
provided
where, front part of aircraft is covered
back portion was exposed
This is economical and maintenance work
will be easy.

Steel framing
Throughout
22 m
8m

ProperVentilationforLightandairtobe
considered,helpsforinspectionworks.
Reflectivesheetsforwallstoreflectthelightinside
hanger.
Properinsulationhastobeprovidedforroofaswell
aswalltopreventheat.

Any Questions