1
Session 1
©2006 ASE Consulting LLC
Vee
Development
Model
Adapted from Vee Model developed by Forsberg
and Mooz Visualizing Project Management

2
Session 1
©2006 ASE Consulting LLC
Upper left side of Vee
Definition and decomposition
Systems engineering management plan (SEMP)
Planning the technical development
Control document for the project
Documents will be identified for the SEMP as we go
through the lessons
Concept of operation
Understanding the problem space
The way the system is envisioned to work including the Operations and
Maintenance
System level requirements
“What” the system is to do to address the problem space

3
Session 1
©2006 ASE Consulting LLC
Lower left side of the Vee
Sub-system requirements (high level design)
Transition from “what” the system must do to
“how” it is to be built.
Sub-system definition and project level
architecture defined
Interfaces identified
Configuration Items Identified
Component level – detailed design
Software/hardware detailed design
Code specifications
Hardware specifications
Configuration Items identified cont’
Make-buy decisions
Detailed design is equivalent to highway 100%
PS&E package

4
Session 1
©2006 ASE Consulting LLC
Implementation (bottom of the Vee)
Implementation
Hardware and software development
Systems Engineering Audit
Code walk-through
Commercial off the shelf (COTS) products implementation
(databases, object request broker, graphical user interface
(GUI) products)
Hardware development (Printed Circuit (PC) Board
fabrication)
Software Development

5
Session 1
©2006 ASE Consulting LLC
Lower right side of the Vee
Sub-system integration and testing
Sub-system integration
Legacy system integration
External interface integration
Sub-system test readiness
Sub-system test procedures
Component level integration and
testing
Configuration item verification testing
Module integration
CI test procedures

6
Session 1
©2006 ASE Consulting LLC
Upper right side of the Vee
System commissioning – operations and maintenance
Final crossover
“Real-world” exposure
Systems level validation
Alpha testing
Beta testing
Evaluation period
Training
Limited “real-world” exposure
Fall-back to previous baseline available
Systems level integration and verification
System level test procedures
User documentation
Verification testing under controlled environment

7
Session 1
©2006 ASE Consulting LLC
Other aspects of the Vee
Relationship across the Vee
Verification and validation test
plans
Control gates
Formal technical reviews
Traceability
Requirements to test plan (across
the Vee)
System to sub-system to design
(through the Vee)
Baselines
System baseline
Subsystem baseline
Design baseline
Operational baseline

8
Session 1
©2006 ASE Consulting LLC
The Vee Model View, Observations
Has commercial and international acceptance
Used by NHI for the Systems Engineering
Training
Recommended for ITS Development
Relationships of the Early phases of a project
to the End Results are clearly illustrated – A
powerful reality!